-
Update of beam coupling impedance evaluation by the stretched-wire method
Authors:
T. Toyama,
A. Kobayashi,
T. Nakamura,
M. Yoshii,
C. Ohmori,
K. Hasegawa,
Y. Sugiyama,
T. Shibata,
K. Ishii,
Y. Shobuda,
F. Tamura,
K. Hanamura,
T. Kawachi
Abstract:
In many cases beam coupling impedances or wake fields are calculated with computer simulator such as CST Studio Suite, GdfidL Electromagnetic Field Simulator and so on. But evaluation with the stretched-wire method is still very useful by its flexibility to the change of the device-under-test configuration, speed to get results and, more than anything, its accessibility on the real devices. One of…
▽ More
In many cases beam coupling impedances or wake fields are calculated with computer simulator such as CST Studio Suite, GdfidL Electromagnetic Field Simulator and so on. But evaluation with the stretched-wire method is still very useful by its flexibility to the change of the device-under-test configuration, speed to get results and, more than anything, its accessibility on the real devices. One of the drawbacks in the practical procedure, difficulty of Thru-Reflect-Line calibration, is overcome using the calibration method recently introduced in high frequency vector network analyzers, "2-X THRU de-embedding". Here the procedure is explained in detail. The method has been successfully applied to RF cavity and FX kicker measurement in the J-PARC MR.
△ Less
Submitted 22 August, 2022; v1 submitted 19 August, 2022;
originally announced August 2022.
-
The feedback system for the longitudinal coupled-bunch instabilities in the J-PARC Main Ring
Authors:
Yasuyuki Sugiyama,
Fumihiko Tamura,
Masahito Yoshii
Abstract:
The J-PARC Main Ring (MR) has achieved the delivery of the 30 GeV proton beam with the beam power of 500 kW to the neutrino experiment in May 2018. The longitudinal coupled-bunch instabilities have been observed in the MR for the beam power beyond 470 kW. Since more significant coupled-bunch oscillation was observed in higher beam power, the mitigation of the coupled-bunch instabilities is necessa…
▽ More
The J-PARC Main Ring (MR) has achieved the delivery of the 30 GeV proton beam with the beam power of 500 kW to the neutrino experiment in May 2018. The longitudinal coupled-bunch instabilities have been observed in the MR for the beam power beyond 470 kW. Since more significant coupled-bunch oscillation was observed in higher beam power, the mitigation of the coupled-bunch instabilities is necessary for the stable beam delivery with the beam power beyond 500 kW. A new feedback system was developed to suppress the coupled-bunch instabilities. The feedback system consists of a wall current monitor, an FPGA-based feedback processor, RF power amplifiers, and an RF cavity as a longitudinal kicker. The synchrotron sideband components of the beam signal picked up by the wall current monitor are detected by the feedback processor and used for the feedback control. The single-sideband filtering technique is employed in the feedback processor to control each coupled-bunch mode separately. To accommodate the change of the synchrotron frequency during the acceleration, a synchrotron frequency tracking CIC filter is used as a low pass filter in the single-sideband filter. We present the preliminary beam test results to suppress the beam oscillation with the developed feedback system.
△ Less
Submitted 15 October, 2019;
originally announced October 2019.
-
Longitudinal Mode-by-Mode Feedback System for The J-PARC Main Ring
Authors:
Yasuyuki Sugiyama,
Fumihiko Tamura,
Masahito Yoshii
Abstract:
The J-PARC Main Ring (MR) is a high intensity proton synchrotron, which accelerates protons from 3 GeV to 30 GeV. The MR delivers $2.6\times10^{14}$ protons per pulse, which corresponds to the beam power of 500 kW, to the neutrino experiment as of May 2018, and the studies to reach higher beam intensities are in progress. During studies, we observed the longitudinal dipole coupled-bunch instabilit…
▽ More
The J-PARC Main Ring (MR) is a high intensity proton synchrotron, which accelerates protons from 3 GeV to 30 GeV. The MR delivers $2.6\times10^{14}$ protons per pulse, which corresponds to the beam power of 500 kW, to the neutrino experiment as of May 2018, and the studies to reach higher beam intensities are in progress. During studies, we observed the longitudinal dipole coupled-bunch instabilities in the MR for the beam power beyond 470 kW. To mitigate them for higher beam intensities, we have developed a longitudinal mode-by-mode feedback system. The feedback system consists of a wall current monitor, a FPGA-based feedback processor, RF power amplifiers, and a RF cavity as a longitudinal kicker. In the feedback processor, we utilize the single sideband filtering technique to detect the oscillation components of the individual coupled-bunch mode in the beam signal. The frequency response of the filters in the feedback processor matched well with the simulation. The oscillation amplitude of the coupled bunch oscillation measured by the system agreed with the oscilloscope analysis.
△ Less
Submitted 24 June, 2018;
originally announced June 2018.
-
Development of next generation LLRF control system for J-PARC rapid cycling synchrotron
Authors:
Fumihiko Tamura,
Yasuyuki Sugiyama,
Masahito Yoshii,
Masatsugu Ryoshi
Abstract:
The low level rf (LLRF) control system for the rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) started its operation in 2007. The key functions of the LLRF control system are the dual harmonic auto voltage control, which generates superposed voltages of the fundamental accelerating harmonic and the second harmonic in a single wideband magnetic alloy (MA) c…
▽ More
The low level rf (LLRF) control system for the rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) started its operation in 2007. The key functions of the LLRF control system are the dual harmonic auto voltage control, which generates superposed voltages of the fundamental accelerating harmonic and the second harmonic in a single wideband magnetic alloy (MA) cavity, and the multiharmonic rf feedforward to compensate the beam loading in the MA cavity caused by high intensity beams. These functions are necessary to accelerate high intensity proton beams. The system has been working well without major problems for more than ten years. However, the old FPGAs (Xilinx Virtex-II pro etc.) are discontinued and not supported by the current development environment. It will be difficult to maintain the system in near future. Thus, we are planning to replace the existing VME-based LLRF control system with a new MicroTCA.4 based system. The system controls twelve cavities independently and calculates vector sum of the cavity voltages in real time for phase feedback. Signal and data transfer between the modules is a key to realize the functions. In the existing system, the transfer is implemented not only the backplane but also serial link via cables between the VME modules. It is much more simplified in the new system thanks to the high speed communication capability of the MicroTCA.4 backplane. In this article, we describe the configuration of the system under development, the implemented functions, and preliminary test results.
△ Less
Submitted 8 June, 2018;
originally announced June 2018.