Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab
Authors:
J. Helsper,
S. Chandrasekaran,
J. Holzbauer,
N. Solyak
Abstract:
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would cr…
▽ More
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.
△ Less
Submitted 11 July, 2023;
originally announced July 2023.
-
Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab
Authors:
J. Helsper,
S. Wallon,
D. Passarelli,
D. Longuevergne,
S. Kazakov,
N. Solyak
Abstract:
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design,…
▽ More
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.
△ Less
Submitted 11 July, 2023;
originally announced July 2023.
-
Design, Manufacturing, Assembly, Testing, And Lessons Learned Of The Prototype 650 Mhz Couplers
Authors:
J. Helsper,
S. Chandrasekaran,
N. Solyak,
S. Kazakov,
K. Premo,
G. Wu,
F. Furuta,
J. Ozelis,
B. Hanna
Abstract:
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.
△ Less
Submitted 2 September, 2022;
originally announced September 2022.
-
An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade
Authors:
D. Neuffer,
S. Belomestnykh,
M. Checchin,
D. Johnson,
S. Posen,
E. Pozdeyev,
V. Pronskikh,
A. Saini,
N. Solyak,
V. Yakovlev
Abstract:
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-…
▽ More
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.
△ Less
Submitted 24 August, 2022;
originally announced August 2022.
-
Key directions for research and development of superconducting radio frequency cavities
Authors:
S. Belomestnykh,
S. Posen,
D. Bafia,
S. Balachandran,
M. Bertucci,
A. Burrill,
A. Cano,
M. Checchin,
G. Ciovati,
L. D. Cooley,
G. Dalla Lana Semione,
J. Delayen,
G. Eremeev,
F. Furuta,
F. Gerigk,
B. Giaccone,
D. Gonnella,
A. Grassellino,
A. Gurevich,
W. Hillert,
M. Iavarone,
J. Knobloch,
T. Kubo,
W. K. Kwok,
R. Laxdal
, et al. (31 additional authors not shown)
Abstract:
Radio frequency superconductivity is a cornerstone technology for many future HEP particle accelerators and experiments from colliders to proton drivers for neutrino facilities to searches for dark matter. While the performance of superconducting RF (SRF) cavities has improved significantly over the last decades, and the SRF technology has enabled new applications, the proposed HEP facilities and…
▽ More
Radio frequency superconductivity is a cornerstone technology for many future HEP particle accelerators and experiments from colliders to proton drivers for neutrino facilities to searches for dark matter. While the performance of superconducting RF (SRF) cavities has improved significantly over the last decades, and the SRF technology has enabled new applications, the proposed HEP facilities and experiments pose new challenges. To address these challenges, the field continues to generate new ideas and there seems to be a vast room for improvements. In this paper we discuss the key research directions that are aligned with and address the future HEP needs.
△ Less
Submitted 21 August, 2022; v1 submitted 3 April, 2022;
originally announced April 2022.
-
Future Collider Options for the US
Authors:
P. C. Bhat,
S. **dariani,
G. Ambrosio,
G. Apollinari,
S. Belomestnykh,
A. Bross,
J. Butler,
A. Canepa,
D. Elvira,
P. Fox,
Z. Gecse,
E. Gianfelice-Wendt,
P. Merkel,
S. Nagaitsev,
D. Neuffer,
H. Piekarz,
S. Posen,
T. Sen,
V. Shiltsev,
N. Solyak,
D. Stratakis,
M. Syphers,
G. Velev,
V. Yakovlev,
K. Yonehara
, et al. (1 additional authors not shown)
Abstract:
The United States has a rich history in high energy particle accelerators and colliders -- both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is the exploring of options…
▽ More
The United States has a rich history in high energy particle accelerators and colliders -- both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is the exploring of options to host a future collider in the U.S. The "Snowmass" study and the subsequent Particle Physics Project Prioritization Panel (P5) process provide the timely opportunity to develop strategies for both. What we do now will shape the future of our field and whether the U.S. will remain a world leader in these areas. In this white paper, we briefly discuss the US engagement in proposed collider projects abroad and describe future collider options for the U.S. We also call for initiating an integrated R\&D program for future colliders.
△ Less
Submitted 15 March, 2022;
originally announced March 2022.
-
An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade: a Snowmass 2021 White Paper
Authors:
S. Belomestnykh,
M. Checchin,
D. Johnson,
D. Neuffer,
H. Padamsee,
S. Posen,
E. Pozdeyev,
V. Pronskikh,
A. Saini,
N. Solyak,
V. Yakovlev
Abstract:
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experime…
▽ More
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experiments. In this white paper, we propose an 8 GeV Linac for that purpose. The Linac consists of an extension of the PIP-II Linac to ~2 GeV using PIP-II 650 MHz SRF cryomodules, followed by a 2 -->8.0 GeV Linac composed of 1300 MHz SRF cryomodules, based upon the LCLS-II cryomodules developed at Fermilab. The 8 GeV Linac will incorporate recent improvements in SRF technology. The research needed to implement this Linac is described.
△ Less
Submitted 2 June, 2023; v1 submitted 9 March, 2022;
originally announced March 2022.
-
Design of a medium energy, high average power superconducting e-beam accelerator for environmental applications
Authors:
R. C. Dhuley,
I. Gonin,
K. Zeller,
R. Kostin,
S. Kazakov,
B. Coriton,
T. Khabiboulline,
A. Sukhanov,
V. Yakovlev,
A. Saini,
N. Solyak,
A. Sauers,
J. C. T. Thangaraj
Abstract:
We present the technical and engineering design of a medium energy (10 MeV) and high average power (1 MW) electron beam accelerator intended for irradiation treatment of high volume industrial and municipal wastewater. The accelerator uses superconducting radiofrequency (SRF) cavity technology for producing the high average beam power with $>$90% RF to beam efficiency. The design of the accelerato…
▽ More
We present the technical and engineering design of a medium energy (10 MeV) and high average power (1 MW) electron beam accelerator intended for irradiation treatment of high volume industrial and municipal wastewater. The accelerator uses superconducting radiofrequency (SRF) cavity technology for producing the high average beam power with $>$90% RF to beam efficiency. The design of the accelerator is simplified and tailored for industrial settings by adopting the cryocooler conduction-cooling technique for the SRF cavity instead of a conventional liquid helium bath cryo-system. The technical design is supplemented with a detailed analysis of capital and operating cost of the accelerator. The designed accelerator can treat up to 12 million gallons per day of wastewater, requires capital of $\sim\$$8M for construction, and has $\sim$13.5 cents/ton/kGy in material processing cost.
△ Less
Submitted 26 December, 2021; v1 submitted 16 December, 2021;
originally announced December 2021.
-
LCLS-II-HE verification cryomodule high gradient performance and quench behavior
Authors:
S. Posen,
A. Cravatta,
M. Checchin,
S. Aderhold,
C. Adolphsen,
T. Arkan,
D. Bafia,
A. Benwell,
D. Bice,
B. Chase,
C. Contreras-Martinez,
L. Dootlittle,
J. Fuerst,
D. Gonnella,
A. Grassellino,
C. Grimm,
B. Hansen,
E. Harms,
B. Hartsell,
G. Hays,
J. Holzbauer,
S. Hoobler,
J. Kaluzny,
T. Khabiboulline,
M. Kucera
, et al. (21 additional authors not shown)
Abstract:
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipac…
▽ More
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.
△ Less
Submitted 27 October, 2021;
originally announced October 2021.
-
Ring-Based Electron Cooling System for the EIC
Authors:
V. Lebedev,
S. Nagaitsev,
A. Burov,
V. Yakovlev,
I. Gonin,
I. Terechkine,
A. Saini,
N. Solyak
Abstract:
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collis…
▽ More
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collisions. Operations with a 10-ms cycle is possible but it will reduce the cooling rates by ~30$\%$. The system is capable of delivering the required performance in the entire EIC energy range with emittance cooling times of less than 1-2 hours.
△ Less
Submitted 10 January, 2021; v1 submitted 1 October, 2020;
originally announced October 2020.
-
Achievement of Ultra-High Quality Factor in Prototype Cryomodule for LCLS-II
Authors:
G. Wu,
A. Grassellino,
E. Harms,
N. Solyak,
A. Romanenko,
C. Ginsburg,
R. Stanek
Abstract:
Quality factor is a primary cost driver for high energy, continuous wave (CW) SRF linacs like the LCLS-II X-ray free electron laser currently under construction. Taking this into account, several innovations were introduced in the LCLS-II cryomodule design to push substantially beyond the previous state-of-the-art quality factor achieved in operation. This includes the first ever implementation of…
▽ More
Quality factor is a primary cost driver for high energy, continuous wave (CW) SRF linacs like the LCLS-II X-ray free electron laser currently under construction. Taking this into account, several innovations were introduced in the LCLS-II cryomodule design to push substantially beyond the previous state-of-the-art quality factor achieved in operation. This includes the first ever implementation of the nitrogen do** cavity treatment, the capability to provide high mass flow cooldown to improve expulsion of magnetic flux based on recent R&D, high performance magnetic shielding, and other critical subcomponents. To evaluate the implementation of these new cryomodule features, two prototype cryomodules were produced. In this paper, we present results from the prototype cryomodule assembled at Fermilab, which achieved unprecedented cavity quality factors of 3.0e10 at a nominal cryomodule voltage. We overview cavity performance, procedures to achieve ambient magnetic field < 5 mG at the cavity wall, and the successful demonstration of high mass flow cooldown in a cryomodule. The cavity performance under various cool down conditions are presented as well to show the impact of flux expulsion on Q0.
△ Less
Submitted 8 January, 2019; v1 submitted 21 December, 2018;
originally announced December 2018.
-
The Role of Magnetic Flux Expulsion to Reach Q0>3x10^10 in SRF Cryomodules
Authors:
S. Posen,
G. Wu,
E. Harms,
A. Grassellino,
O. S. Melnychuk,
D. A. Sergatskov,
N. Solyak,
A. Palczewski,
D. Gonnella,
T. Peterson
Abstract:
When a superconducting radiofrequency cavity is cooled through its critical temperature, ambient magnetic flux can become "frozen in" to the superconductor, resulting in degradation of the quality factor. This is especially problematic in applications where quality factor is a cost driver, such as in the CW linac for LCLS-II. Previously, it had been unknown how to prevent flux from being trapped d…
▽ More
When a superconducting radiofrequency cavity is cooled through its critical temperature, ambient magnetic flux can become "frozen in" to the superconductor, resulting in degradation of the quality factor. This is especially problematic in applications where quality factor is a cost driver, such as in the CW linac for LCLS-II. Previously, it had been unknown how to prevent flux from being trapped during cooldown in bulk niobium cavities, but recent R&D studies showed near-full flux expulsion can be achieved through high temperature heat treatment and cooling cavities through the superconducting transition with a spatial thermal gradient over the surface. In this paper, we describe the first accelerator implementation of these procedures, in cryomodules that are currently being produced for LCLS-II. We compare the performance of cavities under different conditions of heat treatment and thermal gradient during cooldown, showing a substantial improvement in performance when both are applied, enabling cryomodules to reach and, in many cases, exceed a Q0 of ~3x10^10.
△ Less
Submitted 10 December, 2018;
originally announced December 2018.
-
Commissioning And First Results From The Fermilab Cryomodule Test Stand
Authors:
E. R. Harms,
M. Awida,
C. Baffes,
K. Carlson,
S. Chandrasekaran,
B. Chase,
E. Cullerton,
J. Edelen,
J. Einstein-Curtis,
C. Ginsburg,
A. Grassellino,
B. Hansen,
J. Holzbauer,
S. Kazakov,
T. Khabiboulline,
M. Kucera,
J. Leibfritz,
A. Lunin,
D. McDowell,
M. McGee,
D. Nicklaus,
D. Orris,
J. Ozelis,
J. Patrick,
T. Petersen
, et al. (12 additional authors not shown)
Abstract:
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overv…
▽ More
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
△ Less
Submitted 7 May, 2018;
originally announced May 2018.
-
Initial Beam Dynamics Simulations of a High-Average-Current Field-Emission Electron Source in a Superconducting RadioFrequency Gun
Authors:
O. Mohsen,
I. Gonin,
R. Kephart,
T. Khabiboulline,
P. Piot,
N. Solyak,
J. C. Thangaraj,
V. Yakovlev
Abstract:
High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a superconducting radio-frequency (SRF) cavity. We especially carry out beam-dynamics simulations that demonstrate the viability of the scheme to form $\sim$ 300 kW ave…
▽ More
High-power electron beams are sought-after tools in support to a wide array of societal applications. This paper investigates the production of high-power electron beams by combining a high-current field-emission electron source to a superconducting radio-frequency (SRF) cavity. We especially carry out beam-dynamics simulations that demonstrate the viability of the scheme to form $\sim$ 300 kW average-power electron beam using a 1+1/2-cell SRF gun.
△ Less
Submitted 5 January, 2018;
originally announced January 2018.
-
Dark Current and Radiation Shielding Studies For The ILC Main Linac
Authors:
Nikolai V. Mokhov,
Igor L. Rakhno,
Nikolay A. Solyak,
Alexander Sukhanov,
Igor S. Tropin
Abstract:
Electrons of dark current (DC), generated in high-gradient superconducting RF cavities (SRF) due to field emission, can be accelerated up to very high energies-19 GeV in the case of the International Linear Collider (ILC) main linac-before they are removed by focusing and steering magnets. Electromagnetic and hadron showers generated by such electrons can represent a significant radiation threat t…
▽ More
Electrons of dark current (DC), generated in high-gradient superconducting RF cavities (SRF) due to field emission, can be accelerated up to very high energies-19 GeV in the case of the International Linear Collider (ILC) main linac-before they are removed by focusing and steering magnets. Electromagnetic and hadron showers generated by such electrons can represent a significant radiation threat to the linac equipment and personnel. In our study, an operational scenario is analysed which is believed can be considered as the worst case scenario for the main linac regarding the DC contribution to the radiation environment in the main linac tunnel. A detailed modeling is performed for the DC electrons which are emitted from the surface of the SRF cavities and can be repeatedly accelerated in the high-gradient fields in many SRF cavities. Results of MARS15 Monte Carlo calculations, performed for the current main linac tunnel design, reveal that the prompt dose design level of 25 μSv/hr in the service tunnel can be provided by a 2.3-m thick concrete wall between the main and service tunnels.
△ Less
Submitted 5 May, 2017;
originally announced May 2017.
-
Analysis and Measurement of the Transfer Matrix of a 9-cell 1.3-GHz Superconducting Cavity
Authors:
A. Halavanau,
N. Eddy,
D. Edstrom,
E. Harms,
A. Lunin,
P. Piot,
A. Romanov,
J. Ruan,
N. Solyak,
V. Shiltsev
Abstract:
Superconducting linacs are capable of producing intense, stable, high-quality electron beams that have found widespread applications in science and industry. The 9-cell 1.3-GHz superconducting standing-wave accelerating RF cavity originally developed for $e^+/e^-$ linear-collider applications [B. Aunes, {\em et al.} Phys. Rev. ST Accel. Beams {\bf 3}, 092001 (2000)] has been broadly employed in va…
▽ More
Superconducting linacs are capable of producing intense, stable, high-quality electron beams that have found widespread applications in science and industry. The 9-cell 1.3-GHz superconducting standing-wave accelerating RF cavity originally developed for $e^+/e^-$ linear-collider applications [B. Aunes, {\em et al.} Phys. Rev. ST Accel. Beams {\bf 3}, 092001 (2000)] has been broadly employed in various superconducting-linac designs. In this paper we discuss the transfer matrix of such a cavity and present its measurement performed at the Fermilab Accelerator Science and Technology (FAST) facility. The experimental results are found to be in agreement with analytical calculations and numerical simulations.
△ Less
Submitted 22 April, 2017; v1 submitted 27 January, 2017;
originally announced January 2017.
-
Studies of the superconducting traveling wave cavity for high gradient LINAC
Authors:
Pavel Avrakhov,
Roman Kostin,
Alexei Kanareykin,
Nikolay Solyak,
Vyacheslav P. Yakovlev
Abstract:
Use of a traveling wave (TW) accelerating structure with a small phase advance per cell instead of standing wave may provide a significant increase of accelerating gradient in a superconducting linear accelerator. The TW section achieves an accelerating gradient 1.2-1.4 larger than TESLA-shaped standing wave cavities for the same surface electric and magnetic fields. Recent tests of an L-band sing…
▽ More
Use of a traveling wave (TW) accelerating structure with a small phase advance per cell instead of standing wave may provide a significant increase of accelerating gradient in a superconducting linear accelerator. The TW section achieves an accelerating gradient 1.2-1.4 larger than TESLA-shaped standing wave cavities for the same surface electric and magnetic fields. Recent tests of an L-band single-cell cavity with a waveguide feedback demonstrated an accelerating gradient comparable to the gradient in a single-cell ILC-type cavity from the same manufacturer. This article presents the next stage of the 3- cell TW resonance ring development which will be tested in the traveling wave regime. The main simulation results of the microphonics and Lorentz Force Detuning (LFD) are also considered.
△ Less
Submitted 6 February, 2015;
originally announced February 2015.
-
Untrapped HOM Radiation Absorption in the LCLS-II Cryomodules
Authors:
K. Bane,
C. Nantista,
C. Adolphsen,
T. Raubenheimer,
A. Saini,
N. Solyak,
V. Yakovlev
Abstract:
The superconducting cavities in the continuous wave (CW) linacs of LCLS-II are designed to operate at 2 K, where cooling costs are very expensive. One source of heat is presented by the higher order mode (HOM) power deposited by the beam. Due to the very short bunch length--especially in L3 the final linac--the LCLS-II beam spectrum extends into the terahertz range. Ceramic absorbers, at 70 K and…
▽ More
The superconducting cavities in the continuous wave (CW) linacs of LCLS-II are designed to operate at 2 K, where cooling costs are very expensive. One source of heat is presented by the higher order mode (HOM) power deposited by the beam. Due to the very short bunch length--especially in L3 the final linac--the LCLS-II beam spectrum extends into the terahertz range. Ceramic absorbers, at 70 K and located between cryomodules, are meant to absorb much of this power. In this report we perform two kinds of calculations to estimate the effectiveness of the absorbers and the amount of beam power that needs to be removed at 2 K.
△ Less
Submitted 5 November, 2014;
originally announced November 2014.
-
Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research
Authors:
S. D. Holmes,
M. Kaducak,
R. Kephart,
I. Kourbanis,
V. Lebedev,
S. Mishra,
S. Nagaitsev,
N. Solyak,
R. Tschirhart
Abstract:
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF ac…
▽ More
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.
△ Less
Submitted 19 September, 2014;
originally announced September 2014.
-
The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab
Authors:
S. Nagaitsev,
S. Holmes,
D. Johnson,
M. Kaducak,
R. Kephart,
V. Lebedev,
S. Mishra,
A. Shemyakin,
N. Solyak,
R. Stanek,
V. Yakovlev,
P. Ostroumov,
D. Li,
P. Singh,
M. Pande,
S. Malhotra
Abstract:
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program…
▽ More
A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.
△ Less
Submitted 18 September, 2014;
originally announced September 2014.
-
High-power magnetron transmitter as an RF source for superconducting linear accelerators
Authors:
Grigory Kazakevich,
Rolland Johnson,
Gene Flanagan,
Frank Marhauser,
Vyacheslav Yakovlev,
Brian Chase,
Valeri Lebedev,
Sergei Nagaitsev,
Ralph Pasquinelli,
Nikolay Solyak,
Kenneth Quinn,
Daniel Wolff,
Viatcheslav Pavlov
Abstract:
A concept of a high-power magnetron transmitter for operation within a wideband control feedback loop in phase and amplitude is presented. This transmitter is proposed to drive Superconducting RF (SRF) cavities for intensity-frontier GeV-scale proton/ion linacs. The transmitter performance at the dynamic control was verified in experiments with CW, S-Band, 1 kW magnetrons. The wideband control of…
▽ More
A concept of a high-power magnetron transmitter for operation within a wideband control feedback loop in phase and amplitude is presented. This transmitter is proposed to drive Superconducting RF (SRF) cavities for intensity-frontier GeV-scale proton/ion linacs. The transmitter performance at the dynamic control was verified in experiments with CW, S-Band, 1 kW magnetrons. The wideband control of magnetrons, required for the superconducting linacs, was realized using the magnetrons, injection-locked by the phase-modulated signals. The capabilities of the magnetrons injection-locked by the phase-modulated signals and adequateness for feeding of SRF cavities were verified by measurements of the transfer function magnitude characteristics of single and 2-cascade magnetrons, by measurements the magnetrons phase performance and by measurements of spectra of the carrier frequency. At the ratio of power of locking signal to output power less than -13 dB (in 2-cascade scheme per magnetron, respectively) we demonstrated a phase modulation bandwidth of over 1.0 MHz. The carrier frequency spectrum width about of 1 Hz at the level less than -60 dBc did not demonstrate broadening at wide range of magnitude and frequency of the phase modulation of the injection-locking signal. The wideband dynamic control of output power of the transmitter model was first experimentally demonstrated using two magnetrons, combined in power and injection-locked by the phase-modulated signals. The experiments with the injection-locked magnetrons adequately emulated the wideband dynamic control with a feedback control system, which will allow suppressing all known parasitic modulation of the accelerating field in the SRF cavities. The magnetron transmitter concept, tests of the setups and injection-locking of magnetrons by phase-modulated signals are discussed in this work.
△ Less
Submitted 25 February, 2014;
originally announced February 2014.
-
The International Linear Collider Technical Design Report - Volume 3.I: Accelerator R&D in the Technical Design Phase
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.
-
The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.
-
Project X: Accelerator Reference Design
Authors:
S. D. Holmes,
R. Alber,
B. Chase,
K. Gollwitzer,
D. Johnson,
M. Kaducak,
A. Klebaner,
I. Kourbanis,
V. Lebedev,
A. Leveling,
D. Li,
S. Nagaitsev,
P. Ostroumov,
R. Pasquinelli,
J. Patrick,
L. Prost,
V. Scarpine,
A. Shemyakin,
N. Solyak,
J. Steimel,
V. Yakovlev,
R. Zwaska
Abstract:
Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator…
▽ More
Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility. Part 2 is available as arXiv:1306.5009 [hep-ex] and Part 3 is available as arXiv:1306.5024 [physics.acc-ph].
△ Less
Submitted 15 July, 2013; v1 submitted 20 June, 2013;
originally announced June 2013.
-
HFiTT - Higgs Factory in Tevatron Tunnel
Authors:
Weiren Chou,
Gerard Mourou,
Nikolay Solyak,
Toshiki Tajima,
Mayda Velasco
Abstract:
This paper proposes a Higgs factory located in the Tevatron tunnel. It is based on a photon collider by using a recirculating e- linac and fiber laser technology. The design goal is 10,000 Higgs per year.
This paper proposes a Higgs factory located in the Tevatron tunnel. It is based on a photon collider by using a recirculating e- linac and fiber laser technology. The design goal is 10,000 Higgs per year.
△ Less
Submitted 4 June, 2013; v1 submitted 22 May, 2013;
originally announced May 2013.
-
Design of MEBT for the Project X Injector Experiment at Fermilab
Authors:
A. Shemyakin,
C. Baffes,
A. Chen,
Y. Eidelman,
B. Hanna,
V. Lebedev,
S. Nagaitsev,
J. -F. Ostiguy,
R. Pasquinelli,
D. Peterson,
L. Prost,
G. Saewert,
V. Scarpine,
B. Shteynas,
N. Solyak,
D. Sun,
M. Wendt,
V. Yakovlev,
T. Tang
Abstract:
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert…
▽ More
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by diverting undesired bunches to an absorber. This paper presents the MEBT scheme and describes development of its elements, including the kickers and absorber.
△ Less
Submitted 31 January, 2013;
originally announced January 2013.
-
PXIE Optics and Layout
Authors:
V. A. Lebedev,
S. Nagaitsev,
J. -F. Ostiguy,
A. V. Shemyakin,
B. G. Shteynas,
N. Solyak,
N. Solyak
Abstract:
The Project X Injector Experiment (PXIE) will serve as a prototype for the Project X front end. The aim is to validate the Project-X design and to decrease technical risks, known to be mainly related to the front end. PXIE will accelerate a 1 mA CW beam to about 25 MeV. It will consist of an ion source, LEBT, CW RFQ, MEBT, two SC cryomodules, a diagnostic section and a beam dump. A bunch-by-bunch…
▽ More
The Project X Injector Experiment (PXIE) will serve as a prototype for the Project X front end. The aim is to validate the Project-X design and to decrease technical risks, known to be mainly related to the front end. PXIE will accelerate a 1 mA CW beam to about 25 MeV. It will consist of an ion source, LEBT, CW RFQ, MEBT, two SC cryomodules, a diagnostic section and a beam dump. A bunch-by-bunch chopper located in the MEBT section will allow formation of an arbitrary bunch structure. PXIE deviates somewhat from the current Project-X front end concept in that it provides additional instrumentation and relies on a reduced number of kickers for bunch chop**; the diagnostic section also include an RF separator to allow studying extinction of removed bunches. The paper discusses the main requirements and constraints motivating the facility layout and optics. Final adjustments to the Project X front end design, if needed, will be based on operational experience gained with PXIE.
△ Less
Submitted 30 January, 2013;
originally announced January 2013.
-
PXIE: Project X Injector Experiment
Authors:
P. N. Ostroumov,
S. D. Holmes,
R. D. Kephart,
J. S. Kerby,
V. A. Lebedev,
C. S. Mishra,
S. Nagaitsev,
A. V. Shemyakin,
N. Solyak,
R. P. Stanek,
D. Li
Abstract:
A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. As part of this development program, we are constructing a prototype of the front end of the Project X linac at Fermilab. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element withi…
▽ More
A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. As part of this development program, we are constructing a prototype of the front end of the Project X linac at Fermilab. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The Project X Injector Experiment (PXIE) can be constructed over the period FY12-16 and will include an H- ion source, a CW 2.1-MeV RFQ and two SC cryomodules providing up to 30 MeV energy gain at an average beam current of 1 mA. Successful operations of the facility will demonstrate the viability of novel front end technologies that will find applications beyond Project X in the longer term.
△ Less
Submitted 30 January, 2013;
originally announced January 2013.
-
A Two-stage injection-locked magnetron for accelerators with superconducting cavities
Authors:
Grigory Kazakevich,
Rolland Johnson,
Gene Flanagan,
Frank Marhauser,
Mike Neubauer,
Vyacheslav Yakovlev,
Brian Chase,
Sergey Nagaitsev,
Ralph Pasquinelli,
Nikolay Solyak,
Vitali Tupikov,
Daniel Wolff
Abstract:
A concept for a two-stage injection-locked CW magnetron intended to drive Superconducting Cavities (SC) for intensity-frontier accelerators has been proposed. The concept considers two magnetrons in which the output power differs by 15-20 dB and the lower power magnetron being frequency-locked from an external source locks the higher power magnetron. The injection-locked two-stage CW magnetron can…
▽ More
A concept for a two-stage injection-locked CW magnetron intended to drive Superconducting Cavities (SC) for intensity-frontier accelerators has been proposed. The concept considers two magnetrons in which the output power differs by 15-20 dB and the lower power magnetron being frequency-locked from an external source locks the higher power magnetron. The injection-locked two-stage CW magnetron can be used as an RF power source for Fermilab's Project-X to feed separately each of the 1.3 GHz SC of the 8 GeV pulsed linac. We expect output/locking power ratio of about 30-40 dB assuming operation in a pulsed mode with pulse duration of ~ 8 ms and repetition rate of 10 Hz. The experimental setup of a two-stage magnetron utilising CW, S-band, 1 kW tubes operating at pulse duration of 1-10 ms, and the obtained results are presented and discussed in this paper.
△ Less
Submitted 25 January, 2013;
originally announced January 2013.
-
SCREAMm - modified code SCREAM to simulate the acceleration of a pulsed beam through the superconducting linac
Authors:
Yu. Eidelman,
S. Nagaitsev,
N. Solyak
Abstract:
The code SCREAM -- SuperConducting RElativistic particle Accelerator siMulation was significantly modified and improved. Some misprints in the formulae used have been fixed and a more realistic expression for the vector-sum introduced. The realistic model of Lorentz-force detuning (LFD) is developed and will be implemented to the code. A friendly GUI allows various parameters of the simulated prob…
▽ More
The code SCREAM -- SuperConducting RElativistic particle Accelerator siMulation was significantly modified and improved. Some misprints in the formulae used have been fixed and a more realistic expression for the vector-sum introduced. The realistic model of Lorentz-force detuning (LFD) is developed and will be implemented to the code. A friendly GUI allows various parameters of the simulated problem to be changed easily and quickly. Effective control of various output data is provided. A change of various parameters during the simulation process is controlled by plotting the corresponding graphs "on the fly." A large collection of various graphs can be used to illustrate the results.
△ Less
Submitted 20 September, 2012; v1 submitted 19 September, 2012;
originally announced September 2012.
-
Broad-band chopper for a CW proton linac at Fermilab
Authors:
E. Gianfelice-Wendt,
V. A. Lebedev,
N. Solyak,
S. Nagaitsev,
D. Sun
Abstract:
Requirements and technical limitations to the bunch-by-bunch chopper for the Fermilab Project X are discussed.
Requirements and technical limitations to the bunch-by-bunch chopper for the Fermilab Project X are discussed.
△ Less
Submitted 13 August, 2012;
originally announced August 2012.
-
A new approach to calculate the transport matrix in RF cavities
Authors:
Yu. Eidelman,
N. Mokhov,
S. Nagaitsev,
N. Solyak
Abstract:
A realistic approach to calculate the transport matrix in RF cavities is developed. It is based on joint solution of equations of longitudinal and transverse motion of a charged particle in an electromagnetic field of the linac. This field is a given by distribution (measured or calculated) of the component of the longitudinal electric field on the axis of the linac. New approach is compared with…
▽ More
A realistic approach to calculate the transport matrix in RF cavities is developed. It is based on joint solution of equations of longitudinal and transverse motion of a charged particle in an electromagnetic field of the linac. This field is a given by distribution (measured or calculated) of the component of the longitudinal electric field on the axis of the linac. New approach is compared with other matrix methods to solve the same problem. The comparison with code ASTRA has been carried out. Complete agreement for tracking results for a TESLA-type cavity is achieved. A corresponding algorithm will be implemented into the MARS15 code.
△ Less
Submitted 9 August, 2012;
originally announced August 2012.
-
Intrabeam strip** in H- Linacs
Authors:
V. Lebedev,
N. Solyak,
J. -F. Ostigy,
A. Alexandrov,
A. Shishlo
Abstract:
A beam loss in the superconducting part of the SNS linac has been observed during its commissioning and operation. Although the loss does not prevent the SNS high power operation, it results in an almost uniform irradiation of linac components and increased radiation levels in the tunnel. Multi-particle tracking could neither account for the magnitude of the observed loss nor its dependence on mac…
▽ More
A beam loss in the superconducting part of the SNS linac has been observed during its commissioning and operation. Although the loss does not prevent the SNS high power operation, it results in an almost uniform irradiation of linac components and increased radiation levels in the tunnel. Multi-particle tracking could neither account for the magnitude of the observed loss nor its dependence on machine parameters. It was recently found that the loss is consistent with the intrabeam particle collisions resulting in strip** of H- ions. The paper describes experimental observations and corresponding analytical estimates of the intrabeam strip**.
△ Less
Submitted 23 July, 2012;
originally announced July 2012.
-
A high resolution cavity BPM for the CLIC Test Facility
Authors:
N. Chritin,
H. Schmickler,
L. Soby,
A. Lunin,
N. Solyak,
M. Wendt,
V. Yakovlev
Abstract:
In frame of the development of a high resolution BPM system for the CLIC Main Linac we present the design of a cavity BPM prototype. It consists of a waveguide loaded dipole mode resonator and a monopole mode reference cavity, both operating at 15 GHz, to be compatible with the bunch frequencies at the CLIC Test Facility. Requirements, design concept, numerical analysis, and practical consideratio…
▽ More
In frame of the development of a high resolution BPM system for the CLIC Main Linac we present the design of a cavity BPM prototype. It consists of a waveguide loaded dipole mode resonator and a monopole mode reference cavity, both operating at 15 GHz, to be compatible with the bunch frequencies at the CLIC Test Facility. Requirements, design concept, numerical analysis, and practical considerations are discussed.
△ Less
Submitted 19 July, 2012;
originally announced July 2012.
-
Submicron multi-bunch BPM for CLIC
Authors:
H. Schmickler,
L. Soby,
A. Lunin,
N. Solyak,
M. Wendt
Abstract:
A common-mode free cavity BPM is currently under development at Fermilab within the ILC-CLIC collaboration. This monitor will be operated in a CLIC Main Linac multi-bunch regime, and needs to provide both, high spatial and time resolution. We present the design concept, numerical analysis, investigation on tolerances and error effects, as well as simulations on the signal response applying a multi…
▽ More
A common-mode free cavity BPM is currently under development at Fermilab within the ILC-CLIC collaboration. This monitor will be operated in a CLIC Main Linac multi-bunch regime, and needs to provide both, high spatial and time resolution. We present the design concept, numerical analysis, investigation on tolerances and error effects, as well as simulations on the signal response applying a multi-bunch stimulus.
△ Less
Submitted 19 July, 2012;
originally announced July 2012.
-
Project X functional requirements specification
Authors:
The Project X Collaboration,
S. D. Holmes,
S. D. Henderson,
R. Kephart,
J. Kerby,
I. Kourbanis,
V. Lebedev,
S. Mishra,
S. Nagaitsev,
N. Solyak,
R. Tschirhart
Abstract:
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Projec…
▽ More
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.
△ Less
Submitted 14 May, 2012;
originally announced May 2012.
-
Three-cell traveling wave superconducting test structure
Authors:
Pavel Avrakhov,
Alexei Kanareykin,
Sergey Kazakov,
Nikolay Solyak,
Genfa Wu,
Vyacheslav P. Yakovlev
Abstract:
Use of a superconducting traveling wave accelerating (STWA) structure with a small phase advance per cell rather than a standing wave structure may provide a significant increase of the accelerating gradient in the ILC linac. For the same surface electric and magnetic fields the STWA achieves an accelerating gradient 1.2 larger than TESLA-like standing wave cavities. The STWA allows also longer ac…
▽ More
Use of a superconducting traveling wave accelerating (STWA) structure with a small phase advance per cell rather than a standing wave structure may provide a significant increase of the accelerating gradient in the ILC linac. For the same surface electric and magnetic fields the STWA achieves an accelerating gradient 1.2 larger than TESLA-like standing wave cavities. The STWA allows also longer acceleration cavities, reducing the number of gaps between them. However, the STWA structure requires a SC feedback waveguide to return the few hundreds of MW of circulating RF power from the structure output to the structure input. A test single-cell cavity with feedback was designed, manufactured and successfully tested demonstrating the possibility of a proper processing to achieve a high accelerating gradient. These results open way to take the next step of the TW SC cavity development: to build and test a traveling-wave three-cell cavity with a feedback waveguide. The latest results of the single-cell cavity tests are discussed as well as the design of the test 3-cell TW cavity.
△ Less
Submitted 7 March, 2012;
originally announced March 2012.
-
Study of effects of failure of beamline elements and their compensation in CW superconducting linac
Authors:
A. Saini,
K. Ranjan,
N. Solyak,
S. Mishra,
V. Yakovlev
Abstract:
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to 3 GeV. The operation at CW mode puts high tolerances on the beam line components, particularly on radiofrequency (RF) cavity. The failure of beam line elements…
▽ More
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to 3 GeV. The operation at CW mode puts high tolerances on the beam line components, particularly on radiofrequency (RF) cavity. The failure of beam line elements at low energy is very critical as it results in mis-match of the beam with the following sections due to different beam parameters than designed parameter. It makes the beam unstable which causes emittance dilution, and ultimately results in beam losses. In worst case, it could affect the reliability of the machine and may lead to the shutdown of the Linac to replace the failed elements. Thus, it is important to study these effects and their compensation to get smooth beam propagation in linac. This paper describes the results of study performed for the failure of RF cavity & solenoid in SSR0 section.
△ Less
Submitted 7 March, 2012;
originally announced March 2012.
-
Calculation of acceptance of high intensity superconducting proton linac for Project X
Authors:
A. Saini,
K. Ranjan,
N. Solyak,
S. Mishra,
V. Yakovlev
Abstract:
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. Th…
▽ More
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and transverse plane. Investigation of most sensitive area which limits longitudinal acceptance and study of influence of failure of beam line elements at critical position, on acceptance are also performed.
△ Less
Submitted 24 February, 2012;
originally announced February 2012.
-
CW RF system of the Project-X accelerator front end
Authors:
T. Khabiboulline,
S. Barbanotti,
I. Gonin,
N. Solyak,
I. Terechkine,
V. Yakovlev
Abstract:
Front end of a CW linac of the Project X contains an H source, an RFQ, a medium energy transport line with the beam chopper, and a SC low-beta linac that accelerates H- from 2.5 MeV to 160 MeV. SC Single Spoke Resonators (SSR) will be used in the linac, because Fermilab already successfully developed and tested a SSR for beta=0.21. Two manufactured cavities achieve 2.5 times more than design accel…
▽ More
Front end of a CW linac of the Project X contains an H source, an RFQ, a medium energy transport line with the beam chopper, and a SC low-beta linac that accelerates H- from 2.5 MeV to 160 MeV. SC Single Spoke Resonators (SSR) will be used in the linac, because Fermilab already successfully developed and tested a SSR for beta=0.21. Two manufactured cavities achieve 2.5 times more than design accelerating gradients. One of these cavities completely dressed, e.g. welded to helium vessel with integrated slow and fast tuners, and tested in CW regime. Successful tests of beta=0.21 SSR give us a confidence to use this type of cavity for low beta (0.117) and for high-beta (0.4) as well. Both types of these cavities are under development. In present report the basic constrains, parameters, electromagnetic and mechanical design for all the three SSR cavities, and first test results of beta=0.21 SSR are presented.
△ Less
Submitted 9 February, 2012;
originally announced February 2012.
-
RF thermal and new cold part design studies on TTF-III input coupler for Project-X
Authors:
Shilun Pei,
Chris E Adolphsen,
Zenghai Li,
Nikolay A Solyak,
Ivan V Gonin
Abstract:
RF power coupler is one of the key components in superconducting (SC) linac. It provides RF power to the SC cavity and interconnects different temperature layers (1.8K, 4.2K, 70K and 300K). TTF-III coupler is one of the most promising candidates for the High Energy (HE) linac of Project X, but it cannot meet the average power requirements because of the relatively high temperature rise on the warm…
▽ More
RF power coupler is one of the key components in superconducting (SC) linac. It provides RF power to the SC cavity and interconnects different temperature layers (1.8K, 4.2K, 70K and 300K). TTF-III coupler is one of the most promising candidates for the High Energy (HE) linac of Project X, but it cannot meet the average power requirements because of the relatively high temperature rise on the warm inner conductor, some design modifications will be required. In this paper, we describe our simulation studies on the copper coating thickness on the warm inner conductor with RRR value of 10 and 100. Our purpose is to rebalance the dynamic and static loads, and finally lower the temperature rise along the warm inner conductor. In addition, to get stronger coupling, better power handling and less multipacting probability, one new cold part design was proposed using 60mm coaxial line; the corresponding multipacting simulation studies have also been investigated.
△ Less
Submitted 12 August, 2011;
originally announced August 2011.
-
Tevatron Electron Lenses: Design and Operation
Authors:
Vladimir Shiltsev,
Kip Bishofberger,
Vsevolod Kamerdzhiev,
Sergei Kozub,
Matthew Kufer,
Gennady Kuznetsov,
Alexander Martinez,
Marvin Olson,
Howard Pfeffer,
Greg Saewert,
Vic Scarpine,
Andrey Seryi,
Nikolai Solyak,
Veniamin Sytnik,
Mikhail Tiunov,
Leonid Tkachenko,
David Wildman,
Daniel Wolff,
Xiao-Long Zhang
Abstract:
The beam-beam effects have been the dominating sources of beam loss and lifetime limitations in the Tevatron proton-antiproton collider [1]. Electron lenses were originally proposed for compensation of electromagnetic long-range and head-on beam-beam interactions of proton and antiproton beams [2]. Results of successful employment of two electron lenses built and installed in the Tevatron are re…
▽ More
The beam-beam effects have been the dominating sources of beam loss and lifetime limitations in the Tevatron proton-antiproton collider [1]. Electron lenses were originally proposed for compensation of electromagnetic long-range and head-on beam-beam interactions of proton and antiproton beams [2]. Results of successful employment of two electron lenses built and installed in the Tevatron are reported in [3,4,5]. In this paper we present design features of the Tevatron electron lenses (TELs), discuss the generation of electron beams, describe different modes of operation and outline the technical parameters of various subsystems.
△ Less
Submitted 11 August, 2008;
originally announced August 2008.
-
Experimental Studies of Compensation of Beam-Beam Effects with Tevatron Electron Lenses
Authors:
V. Shiltsev,
Yu. Alexahin,
K. Bishofberger,
V. Kamerdzhiev,
V. Parkhomchuk,
V. Reva,
N. Solyak,
D. Wildman,
X. -L. Zhang,
F. Zimmermann
Abstract:
Applying the space-charge forces of a low-energy electron beam can lead to a significant improvement of the beam-particle lifetime limit arising from the beam-beam interaction in a high-energy collider [1]. In this article we present the results of various beam experiments with electron lenses, novel instruments developed for the beam-beam compensation at the Tevatron, which collides 980-GeV pro…
▽ More
Applying the space-charge forces of a low-energy electron beam can lead to a significant improvement of the beam-particle lifetime limit arising from the beam-beam interaction in a high-energy collider [1]. In this article we present the results of various beam experiments with electron lenses, novel instruments developed for the beam-beam compensation at the Tevatron, which collides 980-GeV proton and antiproton beams. We study the dependencies of the particle betatron tunes on the electron beam current, energy and position; we explore the effects of electron-beam imperfections and noises; and we quantify the improvements of the high-energy beam intensity and the collider luminosity lifetime obtained by the action of the Tevatron Electron Lenses.
△ Less
Submitted 4 February, 2008;
originally announced February 2008.