Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Authors:
Kazuro Furukawa,
Mitsuo Akemoto,
Dai Arakawa,
Yoshio Arakida,
Yusei Bando,
Hiroyasu Ego,
Yoshinori Enomoto,
Toshiyasu Higo,
Hiroyuki Honma,
Naoko Iida,
Kazuhisa Kakihara,
Takuya Kamitani,
Hiroaki Katagiri,
Masato Kawamura,
Shuji Matsumoto,
Toshihiro Matsumoto,
Hideki Matsushita,
Katsuhiko Mikawa,
Takako Miura,
Fusashi Miyahara,
Hiromitsu Nakajima,
Takuya Natsui,
Yujiro Ogawa,
Satoshi Ohsawa,
Yuichi Okayasu
, et al. (17 additional authors not shown)
Abstract:
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construc…
▽ More
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
△ Less
Submitted 4 July, 2022;
originally announced July 2022.
-
The International Linear Collider: Report to Snowmass 2021
Authors:
Alexander Aryshev,
Ties Behnke,
Mikael Berggren,
James Brau,
Nathaniel Craig,
Ayres Freitas,
Frank Gaede,
Spencer Gessner,
Stefania Gori,
Christophe Grojean,
Sven Heinemeyer,
Daniel Jeans,
Katja Kruger,
Benno List,
Jenny List,
Zhen Liu,
Shinichiro Michizono,
David W. Miller,
Ian Moult,
Hitoshi Murayama,
Tatsuya Nakada,
Emilio Nanni,
Mihoko Nojiri,
Hasan Padamsee,
Maxim Perelstein
, et al. (487 additional authors not shown)
Abstract:
The International Linear Collider (ILC) is on the table now as a new global energy-frontier accelerator laboratory taking data in the 2030s. The ILC addresses key questions for our current understanding of particle physics. It is based on a proven accelerator technology. Its experiments will challenge the Standard Model of particle physics and will provide a new window to look beyond it. This docu…
▽ More
The International Linear Collider (ILC) is on the table now as a new global energy-frontier accelerator laboratory taking data in the 2030s. The ILC addresses key questions for our current understanding of particle physics. It is based on a proven accelerator technology. Its experiments will challenge the Standard Model of particle physics and will provide a new window to look beyond it. This document brings the story of the ILC up to date, emphasizing its strong physics motivation, its readiness for construction, and the opportunity it presents to the US and the global particle physics community.
△ Less
Submitted 16 January, 2023; v1 submitted 14 March, 2022;
originally announced March 2022.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.
-
Updated baseline for a staged Compact Linear Collider
Authors:
The CLIC,
CLICdp collaborations,
:,
M. J. Boland,
U. Felzmann,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
C. Balazs,
T. K. Charles,
K. Afanaciev,
I. Emeliantchik,
A. Ignatenko,
V. Makarenko,
N. Shumeiko,
A. Patapenka,
I. Zhuk,
A. C. Abusleme Hoffman,
M. A. Diaz Gutierrez,
M. Vogel Gonzalez,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu
, et al. (493 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-q…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
△ Less
Submitted 27 March, 2017; v1 submitted 26 August, 2016;
originally announced August 2016.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.