A primary electron beam facility at CERN -- eSPS Conceptual design report
Authors:
M. Aicheler,
T. Akesson,
F. Antoniou,
A. Arnalich,
P. A. Arrutia Sota,
P. Bettencourt Moniz Cabral,
D. Bozzini,
M. Brugger,
O. Brunner,
P. N. Burrows,
R. Calaga,
M. J. Capstick,
R. Corsini,
S. Doebert,
L. A. Dougherty,
Y. Dutheil,
L. A. Dyks,
O. Etisken,
L. Evans,
A. Farricker,
R. Fernandez Ortega,
M. A. Fraser,
J. Gall,
S. J. Gessner,
B. Goddard
, et al. (30 additional authors not shown)
Abstract:
The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastru…
▽ More
The design of a primary electron beam facility at CERN is described. The study has been carried out within the framework of the wider Physics Beyond Colliders study. It re-enables the Super Proton Synchrotron (SPS) as an electron accelerator, and leverages the development invested in Compact Linear Collider (CLIC) technology for its injector and as an accelerator research and development infrastructure. The facility would be relevant for several of the key priorities in the 2020 update of the European Strategy for Particle Physics, such as an electron-positron Higgs factory, accelerator R\&D, dark sector physics, and neutrino physics. In addition, it could serve experiments in nuclear physics. The electron beam delivered by this facility would provide access to light dark matter production significantly beyond the targets predicted by a thermal dark matter origin, and for natures of dark matter particles that are not accessible by direct detection experiments. It would also enable electro-nuclear measurements crucial for precise modelling the energy dependence of neutrino-nucleus interactions, which is needed to precisely measure neutrino oscillations as a function of energy. The implementation of the facility is the natural next step in the development of X-band high-gradient acceleration technology, a key technology for compact and cost-effective electron/positron linacs. It would also become the only facility with multi-GeV drive bunches and truly independent electron witness bunches for plasma wakefield acceleration. A second phase capable to deliver positron witness bunches would make it a complete facility for plasma wakefield collider studies. [...]
△ Less
Submitted 21 December, 2020; v1 submitted 15 September, 2020;
originally announced September 2020.
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.