-
First results of AUP Nb3Sn quadrupole horizontal tests
Authors:
M. Baldini,
G. Ambrosio,
G. Apollinari,
J. Blowers,
R. Bossert,
R. Carcagno,
G. Chlachidze,
J. DiMarco,
S. Feher,
S. Krave,
V. Lombardo,
L. Martin,
C. Narug,
T. H. Nicol,
V. Nikolic,
A. Nobrega,
V. Marinozzi,
C. Orozco,
T. Page,
S. Stoynev,
T. Strauss,
M. Turenne,
D. Turrioni,
A. Vouris,
M. Yu
, et al. (26 additional authors not shown)
Abstract:
The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a…
▽ More
The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade.
The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC.
This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.
△ Less
Submitted 28 May, 2024;
originally announced May 2024.
-
Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab
Authors:
V. Nikolic,
G. Velev,
R. Bruce,
T. Tope,
D. Orris,
X. Yuan,
M. Kifarkis
Abstract:
Fermi National Accelerator Laboratory (Fermilab) is currently constructing a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing High Temperature Superconducting (HTS) cables under high magnetic fields. This facility is expected to offer capabilities similar to those of EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15 T will be generated by a magnet supp…
▽ More
Fermi National Accelerator Laboratory (Fermilab) is currently constructing a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing High Temperature Superconducting (HTS) cables under high magnetic fields. This facility is expected to offer capabilities similar to those of EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15 T will be generated by a magnet supplied by Lawrence Berkeley National Laboratory. The primary function of HFVMTF will be to serve as a superconducting cable test facility, facilitating tests under high magnetic fields and a broad spectrum of cryogenic temperatures. Additionally, the facility will be utilized for testing highfield superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Program (MDP). This paper provides a comprehensive description of the current status of two pivotal components of the facility: the Top/Lambda Plates Assembly and the Anticryostat for the Test Sample Holder. The latter will serve as a principal interface component connecting cable test samples with the facility's cryostat.
△ Less
Submitted 19 March, 2024;
originally announced March 2024.
-
Quench Performance of the First Pre-series AUP Cryo-assembly
Authors:
M. Baldini,
G. Chlachidze,
G. Apollinari,
J. Dimarco,
S. Feher,
V. Nikolic,
D. Orris,
R. Rabehl,
S. Stoynev,
T. Strauss,
M. Tartaglia,
A. Vouris
Abstract:
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of th…
▽ More
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb3Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.
△ Less
Submitted 29 February, 2024;
originally announced March 2024.
-
Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab
Authors:
J. DiMarco,
P. Akella,
G. Ambrosio,
M. Baldini,
G. Chlachidze,
S. Feher,
J. Nogiec,
V. Nikolic,
S. Stoynev,
T. Strauss,
M. Tartaglia,
P. Thompson,
D. Walbridge
Abstract:
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specific…
▽ More
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. This paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.
△ Less
Submitted 13 December, 2023;
originally announced December 2023.
-
Status of the High Field Cable Test Facility at Fermilab
Authors:
G. V. Velev,
D. Arbelaez,
C. Arcola,
R. Bruce,
V. Kashikhin,
S. Koshelev,
A. Makulski,
V. Marinozzi,
V. Nikolic,
D. Orris,
S. Prestemon,
G. Sabbi,
T. Tope,
X. Yuan
Abstract:
Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Phys…
▽ More
Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES), and will serve as a superconducting cable test facility in high magnetic fields and a wide range of temperatures for HEP and FES communities. This facility will also be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of the facility, including construction, cryostat designs, top and lambda plates, and systems for powering, and quench protection and monitoring.
△ Less
Submitted 16 February, 2023;
originally announced February 2023.
-
Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab
Authors:
J. DiMarco,
P. Akella,
G. Ambrosio,
D. Assell,
M. Baldini,
G. Chlachidze,
S. Feher,
J. Nogiec,
V. Nikolic,
S. Stoynev,
T. Strauss,
M. Tartaglia,
P. Thompson,
D. Walbridge,
W. Ghiorso,
X. Wang
Abstract:
LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test faci…
▽ More
LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profile. A multi-probe, PCB-based rotating coil and Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. This paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.
△ Less
Submitted 14 December, 2021;
originally announced December 2021.
-
The ALICE TPC, a large 3-dimensional tracking device with fast readout for ultra-high multiplicity events
Authors:
J. Alme,
Y. Andres,
H. Appelshauser,
S. Bablok,
N. Bialas,
R. Bolgen,
U. Bonnes,
R. Bramm,
P. Braun-Munzinger,
R. Campagnolo,
P. Christiansen,
A. Dobrin,
C. Engster,
D. Fehlker,
P. Foka,
U. Frankenfeld,
J. J. Gaardhoje,
C. Garabatos,
P. Glassel,
C. Gonzalez Gutierrez,
P. Gros,
H. -A. Gustafsson,
H. Helstrup,
M. Hoch,
M. Ivanov
, et al. (51 additional authors not shown)
Abstract:
The design, construction, and commissioning of the ALICE Time-Projection Chamber (TPC) is described. It is the main device for pattern recognition, tracking, and identification of charged particles in the ALICE experiment at the CERN LHC. The TPC is cylindrical in shape with a volume close to 90 m^3 and is operated in a 0.5 T solenoidal magnetic field parallel to its axis.
In this paper we des…
▽ More
The design, construction, and commissioning of the ALICE Time-Projection Chamber (TPC) is described. It is the main device for pattern recognition, tracking, and identification of charged particles in the ALICE experiment at the CERN LHC. The TPC is cylindrical in shape with a volume close to 90 m^3 and is operated in a 0.5 T solenoidal magnetic field parallel to its axis.
In this paper we describe in detail the design considerations for this detector for operation in the extreme multiplicity environment of central Pb--Pb collisions at LHC energy. The implementation of the resulting requirements into hardware (field cage, read-out chambers, electronics), infrastructure (gas and cooling system, laser-calibration system), and software led to many technical innovations which are described along with a presentation of all the major components of the detector, as currently realized. We also report on the performance achieved after completion of the first round of stand-alone calibration runs and demonstrate results close to those specified in the TPC Technical Design Report.
△ Less
Submitted 12 January, 2010;
originally announced January 2010.