Abstract:
As part of its HL-LHC upgrade program, the CMS Collaboration is develo** a High Granularity Calorimeter (CE) to replace the existing endcap calorimeters. The CE is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic (CE-E) and hadronic (CE-H) compartments. The calorimeter will be built with $\sim$30,000 hexagonal silicon modules. Prototype modul…
▽ More
As part of its HL-LHC upgrade program, the CMS Collaboration is develo** a High Granularity Calorimeter (CE) to replace the existing endcap calorimeters. The CE is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic (CE-E) and hadronic (CE-H) compartments. The calorimeter will be built with $\sim$30,000 hexagonal silicon modules. Prototype modules have been constructed with 6-inch hexagonal silicon sensors with cell areas of 1.1~$cm^2$, and the SKIROC2-CMS readout ASIC. Beam tests of different sampling configurations were conducted with the prototype modules at DESY and CERN in 2017 and 2018. This paper describes the construction and commissioning of the CE calorimeter prototype, the silicon modules used in the construction, their basic performance, and the methods used for their calibration.
△ Less
Submitted 10 December, 2020;
originally announced December 2020.
-
The DAQ system of the 12,000 Channel CMS High Granularity Calorimeter Prototype
Authors:
B. Acar,
G. Adamov,
C. Adloff,
S. Afanasiev,
N. Akchurin,
B. Akgün,
M. Alhusseini,
J. Alison,
G. Altopp,
M. Alyari,
S. An,
S. Anagul,
I. Andreev,
M. Andrews,
P. Aspell,
I. A. Atakisi,
O. Bach,
A. Baden,
G. Bakas,
A. Bakshi,
P. Bargassa,
D. Barney,
E. Becheva,
P. Behera,
A. Belloni
, et al. (307 additional authors not shown)
Abstract:
The CMS experiment at the CERN LHC will be upgraded to accommodate the 5-fold increase in the instantaneous luminosity expected at the High-Luminosity LHC (HL-LHC). Concomitant with this increase will be an increase in the number of interactions in each bunch crossing and a significant increase in the total ionising dose and fluence. One part of this upgrade is the replacement of the current endca…
▽ More
The CMS experiment at the CERN LHC will be upgraded to accommodate the 5-fold increase in the instantaneous luminosity expected at the High-Luminosity LHC (HL-LHC). Concomitant with this increase will be an increase in the number of interactions in each bunch crossing and a significant increase in the total ionising dose and fluence. One part of this upgrade is the replacement of the current endcap calorimeters with a high granularity sampling calorimeter equipped with silicon sensors, designed to manage the high collision rates. As part of the development of this calorimeter, a series of beam tests have been conducted with different sampling configurations using prototype segmented silicon detectors. In the most recent of these tests, conducted in late 2018 at the CERN SPS, the performance of a prototype calorimeter equipped with ${\approx}12,000\rm{~channels}$ of silicon sensors was studied with beams of high-energy electrons, pions and muons. This paper describes the custom-built scalable data acquisition system that was built with readily available FPGA mezzanines and low-cost Raspberry PI computers.
△ Less
Submitted 8 December, 2020; v1 submitted 7 December, 2020;
originally announced December 2020.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.