-
Magnetic field imaging by hBN quantum sensor nanoarray
Authors:
Kento Sasaki,
Yuki Nakamura,
Hao Gu,
Moeta Tsukamoto,
Shu Nakaharai,
Takuya Iwasaki,
Kenji Watanabe,
Takashi Taniguchi,
Shinichi Ogawa,
Yukinori Morita,
Kensuke Kobayashi
Abstract:
Placing a sensor close to the target at the nano-level is a central challenge in quantum sensing. We demonstrate high-spatial-resolution magnetic field imaging with a boron vacancy (V$_\text{B}^-$) defects array in hexagonal boron nitride with a few 10 nm thickness. V$_\text{B}^-$ sensor spots with a size of (100 nm)$^2$ are arranged periodically with nanoscale precision using a helium ion microsc…
▽ More
Placing a sensor close to the target at the nano-level is a central challenge in quantum sensing. We demonstrate high-spatial-resolution magnetic field imaging with a boron vacancy (V$_\text{B}^-$) defects array in hexagonal boron nitride with a few 10 nm thickness. V$_\text{B}^-$ sensor spots with a size of (100 nm)$^2$ are arranged periodically with nanoscale precision using a helium ion microscope and attached tightly to a gold wire. The sensor array allows us to visualize the magnetic field induced by the current in the wire with a spatial resolution beyond the diffraction limit. Each sensor exhibits a practical sensitivity of $73.6~μ\text{T/Hz}^{0.5}$, suitable for quantum materials research. Our technique of arranging V$_\text{B}^-$ quantum sensors periodically and tightly on measurement targets will maximize their potential.
△ Less
Submitted 16 June, 2023; v1 submitted 29 January, 2023;
originally announced January 2023.
-
Applying Bayesian Optimization with Gaussian Process Regression to Computational Fluid Dynamics Problems
Authors:
Y. Morita,
S. Rezaeiravesh,
N. Tabatabaei,
R. Vinuesa,
K. Fukagata,
P. Schlatter
Abstract:
Bayesian optimization (BO) based on Gaussian process regression (GPR) is applied to different CFD (computational fluid dynamics) problems which can be of practical relevance. The problems are i) shape optimization in a lid-driven cavity to minimize or maximize the energy dissipation, ii) shape optimization of the wall of a channel flow in order to obtain a desired pressure-gradient distribution al…
▽ More
Bayesian optimization (BO) based on Gaussian process regression (GPR) is applied to different CFD (computational fluid dynamics) problems which can be of practical relevance. The problems are i) shape optimization in a lid-driven cavity to minimize or maximize the energy dissipation, ii) shape optimization of the wall of a channel flow in order to obtain a desired pressure-gradient distribution along the edge of the turbulent boundary layer formed on the other wall, and finally, iii) optimization of the controlling parameters of a spoiler-ice model to attain the aerodynamic characteristics of the airfoil with an actual surface ice. The diversity of the optimization problems, independence of the optimization approach from any adjoint information, the ease of employing different CFD solvers in the optimization loop, and more importantly, the relatively small number of the required flow simulations reveal the flexibility, efficiency, and versatility of the BO-GPR approach in CFD applications. It is shown that to ensure finding the global optimum of the design parameters of the size up to 8, less than 90 executions of the CFD solvers are needed. Furthermore, it is observed that the number of flow simulations does not significantly increase with the number of design parameters. The associated computational cost of these simulations can be affordable for many optimization cases with practical relevance.
△ Less
Submitted 11 November, 2021; v1 submitted 25 January, 2021;
originally announced January 2021.
-
A Control System of New Magnet Power Converter for J-PARC Main Ring Upgrade
Authors:
Tetsushi Shimogawa,
Yoshinori Kurimoto,
Yuichi Morita,
Kazuki Miura,
Daichi Naito
Abstract:
Japan Proton Accelerator Research Complex (J-PARC) aims at a MW-class proton accelerator facility. One of the promising solutions for increasing the beam power of the Main Ring (MR) is converters of the main magnets with new ones for this upgrade. We have a plan to replace and develop the power converters of main magnets for this upgrade. According to develop the new power converter. We have devel…
▽ More
Japan Proton Accelerator Research Complex (J-PARC) aims at a MW-class proton accelerator facility. One of the promising solutions for increasing the beam power of the Main Ring (MR) is converters of the main magnets with new ones for this upgrade. We have a plan to replace and develop the power converters of main magnets for this upgrade. According to develop the new power converter. We have developed a new control system for the new power converters. This control system consists of four parts : the current measuring device, the feedback control system, the gate pulse generator and the slow control system. Considering a reproducibility in the mass-production and the facilitation of the control algorithm, the digital control system is adopted. We will report the design of this control system and some test result with a new power converter for small quadrupole magnets.
△ Less
Submitted 22 June, 2018;
originally announced June 2018.
-
Belle II Technical Design Report
Authors:
T. Abe,
I. Adachi,
K. Adamczyk,
S. Ahn,
H. Aihara,
K. Akai,
M. Aloi,
L. Andricek,
K. Aoki,
Y. Arai,
A. Arefiev,
K. Arinstein,
Y. Arita,
D. M. Asner,
V. Aulchenko,
T. Aushev,
T. Aziz,
A. M. Bakich,
V. Balagura,
Y. Ban,
E. Barberio,
T. Barvich,
K. Belous,
T. Bergauer,
V. Bhardwaj
, et al. (387 additional authors not shown)
Abstract:
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been pr…
▽ More
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.
△ Less
Submitted 1 November, 2010;
originally announced November 2010.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.