The EUROnu Project
Authors:
T. R. Edgecock,
O. Caretta,
T. Davenne,
C. Densham,
M. Fitton,
D. Kelliher,
P. Loveridge,
S. Machida,
C. Prior,
C. Rogers,
M. Rooney,
J. Thomason,
D. Wilcox,
E. Wildner,
I. Efthymiopoulos,
R. Garoby,
S. Gilardoni,
C. Hansen,
E. Benedetto,
E. Jensen,
A. Kosmicki,
M. Martini,
J. Osborne,
G. Prior,
T. Stora
, et al. (146 additional authors not shown)
Abstract:
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the…
▽ More
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ- beams in a storage ring. The far detector in this case is a 100 kt Magnetised Iron Neutrino Detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular 6He and 18Ne, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive.
△ Less
Submitted 17 May, 2013;
originally announced May 2013.
AGATA - Advanced Gamma Tracking Array
Authors:
S. Akkoyun,
A. Algora,
B. Alikhani,
F. Ameil,
G. de Angelis,
L. Arnold,
A. Astier,
A. Ataç,
Y. Aubert,
C. Aufranc,
A. Austin,
S. Aydin,
F. Azaiez,
S. Badoer,
D. L. Balabanski,
D. Barrientos,
G. Baulieu,
R. Baumann,
D. Bazzacco,
F. A. Beck,
T. Beck,
P. Bednarczyk,
M. Bellato,
M. A. Bentley,
G. Benzoni
, et al. (329 additional authors not shown)
Abstract:
The Advanced GAmma Tracking Array (AGATA) is a European project to develop and operate the next generation gamma-ray spectrometer. AGATA is based on the technique of gamma-ray energy tracking in electrically segmented high-purity germanium crystals. This technique requires the accurate determination of the energy, time and position of every interaction as a gamma ray deposits its energy within the…
▽ More
The Advanced GAmma Tracking Array (AGATA) is a European project to develop and operate the next generation gamma-ray spectrometer. AGATA is based on the technique of gamma-ray energy tracking in electrically segmented high-purity germanium crystals. This technique requires the accurate determination of the energy, time and position of every interaction as a gamma ray deposits its energy within the detector volume. Reconstruction of the full interaction path results in a detector with very high efficiency and excellent spectral response. The realization of gamma-ray tracking and AGATA is a result of many technical advances. These include the development of encapsulated highly-segmented germanium detectors assembled in a triple cluster detector cryostat, an electronics system with fast digital sampling and a data acquisition system to process the data at a high rate. The full characterization of the crystals was measured and compared with detector-response simulations. This enabled pulse-shape analysis algorithms, to extract energy, time and position, to be employed. In addition, tracking algorithms for event reconstruction were developed. The first phase of AGATA is now complete and operational in its first physics campaign. In the future AGATA will be moved between laboratories in Europe and operated in a series of campaigns to take advantage of the different beams and facilities available to maximize its science output. The paper reviews all the achievements made in the AGATA project including all the necessary infrastructure to operate and support the spectrometer.
△ Less
Submitted 17 September, 2012; v1 submitted 24 November, 2011;
originally announced November 2011.