COMET Phase-I Technical Design Report
Authors:
The COMET Collaboration,
R. Abramishvili,
G. Adamov,
R. R. Akhmetshin,
A. Allin,
J. C. Angélique,
V. Anishchik,
M. Aoki,
D. Aznabayev,
I. Bagaturia,
G. Ban,
Y. Ban,
D. Bauer,
D. Baygarashev,
A. E. Bondar,
C. Cârloganu,
B. Carniol,
T. T. Chau,
J. K. Chen,
S. J. Chen,
Y. E. Cheung,
W. da Silva,
P. D. Dauncey,
C. Densham,
G. Devidze
, et al. (170 additional authors not shown)
Abstract:
The Technical Design for the COMET Phase-I experiment is presented in this paper. COMET is an experiment at J-PARC, Japan, which will search for neutrinoless conversion of muons into electrons in the field of an aluminium nucleus ($μ-e$ conversion, $μ^- N \to e^- N$); a lepton flavor violating process. The experimental sensitivity goal for this process in the Phase-I experiment is…
▽ More
The Technical Design for the COMET Phase-I experiment is presented in this paper. COMET is an experiment at J-PARC, Japan, which will search for neutrinoless conversion of muons into electrons in the field of an aluminium nucleus ($μ-e$ conversion, $μ^- N \to e^- N$); a lepton flavor violating process. The experimental sensitivity goal for this process in the Phase-I experiment is $3.1\times10^{-15}$, or 90 % upper limit of branching ratio of $7\times 10^{-15}$, which is a factor of 100 improvement over the existing limit. The expected number of background events is 0.032. To achieve the target sensitivity and background level, the 3.2 kW 8 GeV proton beam from J-PARC will be used. Two types of detectors, CyDet and StrECAL, will be used for detecting the \mue conversion events, and for measuring the beam-related background events in view of the Phase-II experiment, respectively. Results from simulation on signal and background estimations are also described.
△ Less
Submitted 19 May, 2020; v1 submitted 21 December, 2018;
originally announced December 2018.
Development of the analog ASIC for multi-channel readout X-ray CCD camera
Authors:
Hiroshi Nakajima,
Daisuke Matsuura,
Toshihiro Idehara,
Naohisa Anabuki,
Hiroshi Tsunemi,
John P. Doty,
Hirokazu Ikeda,
Haruyoshi Katayama,
Hisashi Kitamura,
Yukio Uchihori
Abstract:
We report on the performance of an analog application-specific integrated circuit (ASIC) developed aiming for the front-end electronics of the X-ray CCDcamera system onboard the next X-ray astronomical satellite, ASTRO-H. It has four identical channels that simultaneously process the CCD signals. Distinctive capability of analog-to-digital conversion enables us to construct a CCD camera body that…
▽ More
We report on the performance of an analog application-specific integrated circuit (ASIC) developed aiming for the front-end electronics of the X-ray CCDcamera system onboard the next X-ray astronomical satellite, ASTRO-H. It has four identical channels that simultaneously process the CCD signals. Distinctive capability of analog-to-digital conversion enables us to construct a CCD camera body that outputs only digital signals. As the result of the front-end electronics test, it works properly with low input noise of =<30 uV at the pixel rate below 100 kHz. The power consumption is sufficiently low of about 150 mW/chip. The input signal range of 720 mV covers the effective energy range of the typical X-ray photon counting CCD (up to 20 keV). The integrated non-linearity is 0.2% that is similar as those of the conventional CCDs in orbit. We also performed a radiation tolerance test against the total ionizing dose (TID) effect and the single event effect. The irradiation test using 60Co and proton beam showed that the ASIC has the sufficient tolerance against TID up to 200 krad, which absolutely exceeds the expected amount of dose during the period of operating in a low-inclination low-earth orbit. The irradiation of Fe ions with the fluence of 5.2x10^8 Ion/cm2 resulted in no single event latchup (SEL), although there were some possible single event upsets. The threshold against SEL is higher than 1.68 MeV cm^2/mg, which is sufficiently high enough that the SEL event should not be one of major causes of instrument downtime in orbit.
△ Less
Submitted 11 February, 2011;
originally announced February 2011.