Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Authors:
Kazuro Furukawa,
Mitsuo Akemoto,
Dai Arakawa,
Yoshio Arakida,
Yusei Bando,
Hiroyasu Ego,
Yoshinori Enomoto,
Toshiyasu Higo,
Hiroyuki Honma,
Naoko Iida,
Kazuhisa Kakihara,
Takuya Kamitani,
Hiroaki Katagiri,
Masato Kawamura,
Shuji Matsumoto,
Toshihiro Matsumoto,
Hideki Matsushita,
Katsuhiko Mikawa,
Takako Miura,
Fusashi Miyahara,
Hiromitsu Nakajima,
Takuya Natsui,
Yujiro Ogawa,
Satoshi Ohsawa,
Yuichi Okayasu
, et al. (17 additional authors not shown)
Abstract:
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construc…
▽ More
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
△ Less
Submitted 4 July, 2022;
originally announced July 2022.
-
A New Approach for Measuring the Muon Anomalous Magnetic Moment and Electric Dipole Moment
Authors:
M. Abe,
S. Bae,
G. Beer,
G. Bunce,
H. Choi,
S. Choi,
M. Chung,
W. da Silva,
S. Eidelman,
M. Finger,
Y. Fukao,
T. Fukuyama,
S. Haciomeroglu,
K. Hasegawa,
K. Hayasaka,
N. Hayashizaki,
H. Hisamatsu,
T. Iijima,
H. Iinuma,
K. Inami,
H. Ikeda,
M. Ikeno,
K. Ishida,
T. Itahashi,
M. Iwasaki
, et al. (71 additional authors not shown)
Abstract:
This paper introduces a new approach to measure the muon magnetic moment anomaly $a_μ = (g-2)/2$, and the muon electric dipole moment (EDM) $d_μ$ at the J-PARC muon facility. The goal of our experiment is to measure $a_μ$ and $d_μ$ using an independent method with a factor of 10 lower muon momentum, and a factor of 20 smaller diameter storage-ring solenoid compared with previous and ongoing muon…
▽ More
This paper introduces a new approach to measure the muon magnetic moment anomaly $a_μ = (g-2)/2$, and the muon electric dipole moment (EDM) $d_μ$ at the J-PARC muon facility. The goal of our experiment is to measure $a_μ$ and $d_μ$ using an independent method with a factor of 10 lower muon momentum, and a factor of 20 smaller diameter storage-ring solenoid compared with previous and ongoing muon $g-2$ experiments with unprecedented quality of the storage magnetic field. Additional significant differences from the present experimental method include a factor of 1,000 smaller transverse emittance of the muon beam (reaccelerated thermal muon beam), its efficient vertical injection into the solenoid, and tracking each decay positron from muon decay to obtain its momentum vector. The precision goal for $a_μ$ is statistical uncertainty of 450 part per billion (ppb), similar to the present experimental uncertainty, and a systematic uncertainty less than 70 ppb. The goal for EDM is a sensitivity of $1.5\times 10^{-21}~e\cdot\mbox{cm}$.
△ Less
Submitted 10 March, 2019; v1 submitted 10 January, 2019;
originally announced January 2019.
-
Development of an intense positron source using a crystal--amorphous hybrid target for linear colliders
Authors:
Y. Uesugi,
T. Akagi,
R. Chehab,
O. Dadoun,
K. Furukawa,
T. Kamitani,
S. Kawada,
T. Omori,
T. Takahashi,
K. Umemori,
J. Urakawa,
M. Satoh,
V. Strakhovenko,
T. Suwada,
A. Variola
Abstract:
In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the…
▽ More
In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the crystal, was proposed as a scheme which could overcome the problem.This paper describes the development of an intense positron source with the hybrid target. A series of experiments on positron generation with the hybrid target has been carried out with a 8--GeV electron beam at the KEKB linac. We observed that positron yield from the hybrid target increased when the incident electron beam was aligned to the crystal axis and exceeded the one from the conventional target with the converter target of the same thickness, when its thickness is less than about 2 radiation length. The measurements in the temperature rise of the amorphous converter target was successfully carried out by use of thermocouples. These results lead to establishment to the evaluation of the hybrid target as an intense positron source.
△ Less
Submitted 16 October, 2013; v1 submitted 15 October, 2013;
originally announced October 2013.
-
Belle II Technical Design Report
Authors:
T. Abe,
I. Adachi,
K. Adamczyk,
S. Ahn,
H. Aihara,
K. Akai,
M. Aloi,
L. Andricek,
K. Aoki,
Y. Arai,
A. Arefiev,
K. Arinstein,
Y. Arita,
D. M. Asner,
V. Aulchenko,
T. Aushev,
T. Aziz,
A. M. Bakich,
V. Balagura,
Y. Ban,
E. Barberio,
T. Barvich,
K. Belous,
T. Bergauer,
V. Bhardwaj
, et al. (387 additional authors not shown)
Abstract:
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been pr…
▽ More
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.
△ Less
Submitted 1 November, 2010;
originally announced November 2010.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.
-
Beam Switching and Beam Feedback Systems at KEKB Linac
Authors:
K. Furukawa,
A. Enomoto,
N. Kamikubota,
T. Kamitani,
T. Matsumoto,
Y. Ogawa,
S. Ohsawa,
K. Oide,
T. Suwada
Abstract:
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is execut…
▽ More
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is executed in about two minutes. Most items in a sequence are simple operations followed by failure recoveries. The magnet standardization part consumes most of the time. The sequence can be re-arranged easily by accelerator operators. Linac beam modes are switched about fifty times a day using this software.
In order to stabilize linac beam energy and orbits, as well as some accelerator equipment, about thirty software beam feedback loops have been installed. They have been utilized routinely in all beam modes, and have improved its beam quality. Since its software interfaces are standardized, it is easy to add new feedback loops simply defining monitors and actuators.
△ Less
Submitted 11 September, 2000; v1 submitted 18 August, 2000;
originally announced August 2000.