Skip to main content

Showing 1–6 of 6 results for author: Kamitani, T

Searching in archive physics. Search in all archives.
.
  1. Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac

    Authors: Kazuro Furukawa, Mitsuo Akemoto, Dai Arakawa, Yoshio Arakida, Yusei Bando, Hiroyasu Ego, Yoshinori Enomoto, Toshiyasu Higo, Hiroyuki Honma, Naoko Iida, Kazuhisa Kakihara, Takuya Kamitani, Hiroaki Katagiri, Masato Kawamura, Shuji Matsumoto, Toshihiro Matsumoto, Hideki Matsushita, Katsuhiko Mikawa, Takako Miura, Fusashi Miyahara, Hiromitsu Nakajima, Takuya Natsui, Yujiro Ogawa, Satoshi Ohsawa, Yuichi Okayasu , et al. (17 additional authors not shown)

    Abstract: KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construc… ▽ More

    Submitted 4 July, 2022; originally announced July 2022.

    Comments: 6 figures, contribution to IPAC2022, Bangkok, THPOST012

    Report number: KEK Preprint 2022-17

    Journal ref: J. Phys. Conf. Ser. 2420, 2023, 012021

  2. arXiv:1901.03047  [pdf, other

    physics.ins-det hep-ex physics.acc-ph

    A New Approach for Measuring the Muon Anomalous Magnetic Moment and Electric Dipole Moment

    Authors: M. Abe, S. Bae, G. Beer, G. Bunce, H. Choi, S. Choi, M. Chung, W. da Silva, S. Eidelman, M. Finger, Y. Fukao, T. Fukuyama, S. Haciomeroglu, K. Hasegawa, K. Hayasaka, N. Hayashizaki, H. Hisamatsu, T. Iijima, H. Iinuma, K. Inami, H. Ikeda, M. Ikeno, K. Ishida, T. Itahashi, M. Iwasaki , et al. (71 additional authors not shown)

    Abstract: This paper introduces a new approach to measure the muon magnetic moment anomaly $a_μ = (g-2)/2$, and the muon electric dipole moment (EDM) $d_μ$ at the J-PARC muon facility. The goal of our experiment is to measure $a_μ$ and $d_μ$ using an independent method with a factor of 10 lower muon momentum, and a factor of 20 smaller diameter storage-ring solenoid compared with previous and ongoing muon… ▽ More

    Submitted 10 March, 2019; v1 submitted 10 January, 2019; originally announced January 2019.

    Comments: 24 pages, 14 figures

  3. Development of an intense positron source using a crystal--amorphous hybrid target for linear colliders

    Authors: Y. Uesugi, T. Akagi, R. Chehab, O. Dadoun, K. Furukawa, T. Kamitani, S. Kawada, T. Omori, T. Takahashi, K. Umemori, J. Urakawa, M. Satoh, V. Strakhovenko, T. Suwada, A. Variola

    Abstract: In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the… ▽ More

    Submitted 16 October, 2013; v1 submitted 15 October, 2013; originally announced October 2013.

    Comments: 17pages, 10figures

    Journal ref: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms, Volume 319, 15 January 2014, Pages 17-23

  4. arXiv:1011.0352  [pdf

    physics.ins-det hep-ex

    Belle II Technical Design Report

    Authors: T. Abe, I. Adachi, K. Adamczyk, S. Ahn, H. Aihara, K. Akai, M. Aloi, L. Andricek, K. Aoki, Y. Arai, A. Arefiev, K. Arinstein, Y. Arita, D. M. Asner, V. Aulchenko, T. Aushev, T. Aziz, A. M. Bakich, V. Balagura, Y. Ban, E. Barberio, T. Barvich, K. Belous, T. Bergauer, V. Bhardwaj , et al. (387 additional authors not shown)

    Abstract: The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been pr… ▽ More

    Submitted 1 November, 2010; originally announced November 2010.

    Comments: Edited by: Z. Doležal and S. Uno

    Report number: KEK Report 2010-1

  5. arXiv:0706.3248  [pdf, other

    physics.ins-det

    Compensation of the Crossing Angle with Crab Cavities at KEKB

    Authors: T. Abe, K. Akai, M. Akemoto, A. Akiyama, M. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda , et al. (90 additional authors not shown)

    Abstract: Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than… ▽ More

    Submitted 21 June, 2007; originally announced June 2007.

    Comments: Submitted to Particle Accelerator Conference 2007, MOZAKI01, Albuquerque

    Journal ref: Conf.Proc.C070625:27,2007

  6. arXiv:physics/0008134  [pdf, ps, other

    physics.acc-ph

    Beam Switching and Beam Feedback Systems at KEKB Linac

    Authors: K. Furukawa, A. Enomoto, N. Kamikubota, T. Kamitani, T. Matsumoto, Y. Ogawa, S. Ohsawa, K. Oide, T. Suwada

    Abstract: The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning. A software panel is used to choose one of four beam modes and a switching sequence is execut… ▽ More

    Submitted 11 September, 2000; v1 submitted 18 August, 2000; originally announced August 2000.

    Comments: 3 pages, 3 figures, LaTeX, LINAC2000, TUE10, english correction

    Report number: KEK Preprint 2000-102

    Journal ref: eConf C000821 (2000) TUE10