-
Test Beam Performance Measurements for the Phase I Upgrade of the CMS Pixel Detector
Authors:
M. Dragicevic,
M. Friedl,
J. Hrubec,
H. Steininger,
A. Gädda,
J. Härkönen,
T. Lampén,
P. Luukka,
T. Peltola,
E. Tuominen,
E. Tuovinen,
A. Winkler,
P. Eerola,
T. Tuuva,
G. Baulieu,
G. Boudoul,
L. Caponetto,
C. Combaret,
D. Contardo,
T. Dupasquier,
G. Gallbit,
N. Lumb,
L. Mirabito,
S. Perries,
M. Vander Donckt
, et al. (462 additional authors not shown)
Abstract:
A new pixel detector for the CMS experiment was built in order to cope with the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking with a reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and allows operation at low comparator…
▽ More
A new pixel detector for the CMS experiment was built in order to cope with the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking with a reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and allows operation at low comparator thresholds. In this paper, comprehensive test beam studies are presented, which have been conducted to verify the design and to quantify the performance of the new detector assemblies in terms of tracking efficiency and spatial resolution. Under optimal conditions, the tracking efficiency is $99.95\pm0.05\,\%$, while the intrinsic spatial resolutions are $4.80\pm0.25\,μ\mathrm{m}$ and $7.99\pm0.21\,μ\mathrm{m}$ along the $100\,μ\mathrm{m}$ and $150\,μ\mathrm{m}$ pixel pitch, respectively. The findings are compared to a detailed Monte Carlo simulation of the pixel detector and good agreement is found.
△ Less
Submitted 1 June, 2017;
originally announced June 2017.
-
Trap** in irradiated p-on-n silicon sensors at fluences anticipated at the HL-LHC outer tracker
Authors:
W. Adam,
T. Bergauer,
M. Dragicevic,
M. Friedl,
R. Fruehwirth,
M. Hoch,
J. Hrubec,
M. Krammer,
W. Treberspurg,
W. Waltenberger,
S. Alderweireldt,
W. Beaumont,
X. Janssen,
S. Luyckx,
P. Van Mechelen,
N. Van Remortel,
A. Van Spilbeeck,
P. Barria,
C. Caillol,
B. Clerbaux,
G. De Lentdecker,
D. Dobur,
L. Favart,
A. Grebenyuk,
Th. Lenzi
, et al. (663 additional authors not shown)
Abstract:
The degradation of signal in silicon sensors is studied under conditions expected at the CERN High-Luminosity LHC. 200 $μ$m thick n-type silicon sensors are irradiated with protons of different energies to fluences of up to $3 \cdot 10^{15}$ neq/cm$^2$. Pulsed red laser light with a wavelength of 672 nm is used to generate electron-hole pairs in the sensors. The induced signals are used to determi…
▽ More
The degradation of signal in silicon sensors is studied under conditions expected at the CERN High-Luminosity LHC. 200 $μ$m thick n-type silicon sensors are irradiated with protons of different energies to fluences of up to $3 \cdot 10^{15}$ neq/cm$^2$. Pulsed red laser light with a wavelength of 672 nm is used to generate electron-hole pairs in the sensors. The induced signals are used to determine the charge collection efficiencies separately for electrons and holes drifting through the sensor. The effective trap** rates are extracted by comparing the results to simulation. The electric field is simulated using Synopsys device simulation assuming two effective defects. The generation and drift of charge carriers are simulated in an independent simulation based on PixelAV. The effective trap** rates are determined from the measured charge collection efficiencies and the simulated and measured time-resolved current pulses are compared. The effective trap** rates determined for both electrons and holes are about 50% smaller than those obtained using standard extrapolations of studies at low fluences and suggests an improved tracker performance over initial expectations.
△ Less
Submitted 7 May, 2015;
originally announced May 2015.
-
Resolution Studies on Silicon Strip Sensors with fine Pitch
Authors:
S. Haensel,
T. Bergauer,
Z. Dolezal,
M. Dragicevic,
Z. Drasal,
M. Friedl,
J. Hrubec,
C. Irmler,
W. Kiesenhofer,
M. Krammer,
P. Kvasnicka
Abstract:
In June 2008 single-sided silicon strip sensors with 50 $μ$m readout pitch were tested in a highly energetic pion beam at the SPS at CERN. The purpose of the test was to evaluate characteristic detector properties by varying the strip width and the number of intermediate strips. The experimental setup and first results for the spatial resolution are discussed.
In June 2008 single-sided silicon strip sensors with 50 $μ$m readout pitch were tested in a highly energetic pion beam at the SPS at CERN. The purpose of the test was to evaluate characteristic detector properties by varying the strip width and the number of intermediate strips. The experimental setup and first results for the spatial resolution are discussed.
△ Less
Submitted 19 February, 2009; v1 submitted 30 January, 2009;
originally announced January 2009.
-
Silicon Detectors for the Large Prototype TPC test setup at DESY
Authors:
S. Haensel,
T. Bergauer,
M. Dragicevic,
J. Hrubec,
M. Krammer,
A. Dierlamm,
T. Barvich,
F. Hartmann,
Th. Müller
Abstract:
The Linear Collider TPC collaboration constructed a Large Prototype TPC (LPTPC) which is now installed at the EUDET facility, in DESY. The SiLC-collaboration (Silicon for the Linear Collider) will install position sensitive silicon strip sensors outside the field cage of the LPTPC, to provide precise tracking information. The data acquisition system (DAQ) is an adapted CMS readout system. The si…
▽ More
The Linear Collider TPC collaboration constructed a Large Prototype TPC (LPTPC) which is now installed at the EUDET facility, in DESY. The SiLC-collaboration (Silicon for the Linear Collider) will install position sensitive silicon strip sensors outside the field cage of the LPTPC, to provide precise tracking information. The data acquisition system (DAQ) is an adapted CMS readout system. The silicon modules are tested and ready to be installed, the mechanical module support and the DAQ system are in preparation.
△ Less
Submitted 19 February, 2009; v1 submitted 30 January, 2009;
originally announced January 2009.