-
The CLIC project
Authors:
O. Brunner,
P. N. Burrows,
S. Calatroni,
N. Catalan Lasheras,
R. Corsini,
G. D'Auria,
S. Doebert,
A. Faus-Golfe,
A. Grudiev,
A. Latina,
T. Lefevre,
G. Mcmonagle,
J. Osborne,
Y. Papaphilippou,
A. Robson,
C. Rossi,
R. Ruber,
D. Schulte,
S. Stapnes,
I. Syratchev,
W. Wuensch
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e$^+$e$^-$-collider under development by the CLIC accelerator collaboration, hosted by CERN. The CLIC accelerator has been optimised for three energy stages at centre-of-mass energies 380 GeV, 1.5 TeV and 3 TeV. CLIC uses a novel two-beam acceleration technique, with normal-conducting accelerating structures operating in the…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e$^+$e$^-$-collider under development by the CLIC accelerator collaboration, hosted by CERN. The CLIC accelerator has been optimised for three energy stages at centre-of-mass energies 380 GeV, 1.5 TeV and 3 TeV. CLIC uses a novel two-beam acceleration technique, with normal-conducting accelerating structures operating in the range of 70-100 MV/m.
The report describes recent achievements in accelerator design, technology development and prototy**, system tests and beam tests. Large-scale CLIC-specific beam tests have taken place, for example, at the CLIC Test Facility CTF3 at CERN, at the Accelerator Test Facility ATF2 at KEK, at the FACET facility at SLAC and at the FERMI facility in Trieste. Together, they demonstrate that all implications of the CLIC design parameters are well understood and reproducible in beam tests and prove that the CLIC performance goals are realistic. The implementation of CLIC near CERN has been investigated. Focusing on a staged approach starting at 380 GeV, this includes civil engineering aspects, electrical networks, cooling and ventilation and installation scheduling, transport. All CLIC studies have put emphasis on optimising cost and energy efficiency, and the resulting power and cost estimates are reported. The report follows very closely the accelerator project description in the CLIC Summary Report for the European Particle Physics Strategy update 2018-19.
Detailed studies of the physics potential and detector for CLIC, and R&D on detector technologies, have been carried out by the CLIC detector and physics (CLICdp) collaboration. CLIC provides excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.
△ Less
Submitted 18 April, 2022; v1 submitted 17 March, 2022;
originally announced March 2022.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.
-
EuPRAXIA@SPARC_LAB Design study towards a compact FEL facility at LNF
Authors:
M. Ferrario,
D. Alesini,
M. P. Anania,
M. Artioli,
A. Bacci,
S. Bartocci,
R. Bedogni,
M. Bellaveglia,
A. Biagioni,
F. Bisesto,
F. Brandi,
E. Brentegani,
F. Broggi,
B. Buonomo,
P. L. Campana,
G. Campogiani,
C. Cannaos,
S. Cantarella,
F. Cardelli,
M. Carpanese,
M. Castellano,
G. Castorina,
N. Catalan Lasheras,
E. Chiadroni,
A. Cianchi
, et al. (95 additional authors not shown)
Abstract:
On the wake of the results obtained so far at the SPARC\_LAB test-facility at the Laboratori Nazionali di Frascati (Italy), we are currently investigating the possibility to design and build a new multi-disciplinary user-facility, equipped with a soft X-ray Free Electron Laser (FEL) driven by a $\sim$1 GeV high brightness linac based on plasma accelerator modules. This design study is performed in…
▽ More
On the wake of the results obtained so far at the SPARC\_LAB test-facility at the Laboratori Nazionali di Frascati (Italy), we are currently investigating the possibility to design and build a new multi-disciplinary user-facility, equipped with a soft X-ray Free Electron Laser (FEL) driven by a $\sim$1 GeV high brightness linac based on plasma accelerator modules. This design study is performed in synergy with the EuPRAXIA design study. In this paper we report about the recent progresses in the on going design study of the new facility.
△ Less
Submitted 26 January, 2018;
originally announced January 2018.
-
Updated baseline for a staged Compact Linear Collider
Authors:
The CLIC,
CLICdp collaborations,
:,
M. J. Boland,
U. Felzmann,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
C. Balazs,
T. K. Charles,
K. Afanaciev,
I. Emeliantchik,
A. Ignatenko,
V. Makarenko,
N. Shumeiko,
A. Patapenka,
I. Zhuk,
A. C. Abusleme Hoffman,
M. A. Diaz Gutierrez,
M. Vogel Gonzalez,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu
, et al. (493 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-q…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
△ Less
Submitted 27 March, 2017; v1 submitted 26 August, 2016;
originally announced August 2016.
-
The FaBrE Project at Trieste
Authors:
G. D'Auria,
C. Rossi,
M. Danailov,
M. Ferrario,
N. Piovella,
L. Serafini
Abstract:
A program to design a high brilliance electron source suitable for a short wavelength Linac-based FEL is presented. The goal of the project is to develop a multi-cell integrated photoinjector capable of delivering 1 nC bunches with emittance below 1 mm mrad. This will be the first step toward a possible development of a IV generation light source test facility based on the existing Trieste Linac…
▽ More
A program to design a high brilliance electron source suitable for a short wavelength Linac-based FEL is presented. The goal of the project is to develop a multi-cell integrated photoinjector capable of delivering 1 nC bunches with emittance below 1 mm mrad. This will be the first step toward a possible development of a IV generation light source test facility based on the existing Trieste Linac. For this purpose a common program between Sincrotrone Trieste and INFN-Milano has been undertaken. Here a brief description of the program and the first results of the RF Gun electromagnetic structure with the beam dynamics on the ELETTRA Linac are presented.
△ Less
Submitted 22 August, 2000; v1 submitted 18 August, 2000;
originally announced August 2000.