-
Design of a new SPS injection system via numerical optimisation
Authors:
E. Waagaard,
M. J. Barnes,
W. Bartmann,
J. Borburgh,
L. S. Ducimetière,
T. Kramer,
T. Stadlbauer,
P. Trubacova,
F. M. Velotti
Abstract:
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the de…
▽ More
The Super Proton Synchrotron (SPS) injection system plays a fundamental role to preserve the quality of injected high-brightness beams for the Large Hadron Collider (LHC) physics program and to maintain the maximum storable intensity. The present system is the result of years of upgrades and patches of a system not conceived for such intensities and beam qualities. In this study, we propose the design of a completely new injection system for the SPS using multi-level numerical optimisation, including realistic hardware assumptions. We also present how this hierarchical optimisation framework can be adapted to other situations for optimal accelerator system design.
△ Less
Submitted 29 June, 2022; v1 submitted 23 June, 2022;
originally announced June 2022.
-
Fast high-power thyristors triggered in impact-ionization wave mode
Authors:
A. Gusev,
S. Lyubutin,
V. Patrakov,
S. Rukin,
B. Slovikovsky,
M. J. Barnes,
T. Kramer,
V. Senaj
Abstract:
GTO-like thyristors 5STH-2045H0002 (4.5 kV, 18 kA/us) developed by ABB semiconductors are currently used at CERN in LHC Beam Dum** System (LBDS): high-power switches with high dI/dt capability and low turn-on delay time are required. Implementation of the impact-ionization triggering in GTO-like thyristor enhances its switching performance and gives new information about semiconductor physics. I…
▽ More
GTO-like thyristors 5STH-2045H0002 (4.5 kV, 18 kA/us) developed by ABB semiconductors are currently used at CERN in LHC Beam Dum** System (LBDS): high-power switches with high dI/dt capability and low turn-on delay time are required. Implementation of the impact-ionization triggering in GTO-like thyristor enhances its switching performance and gives new information about semiconductor physics. In this work thyristors of 5STH-2045H0002 type triggered in impact-ionization wave mode are investigated. An SOS generator providing a dV/dt of several kV/ns was used as a source of triggering pulses. A thyristor switching time of approximately 200-300 ps was observed. Maximum discharge parameters were obtained for two series connected thyristors at a charging voltage of 10 kV, and a capacitor stored energy of ~300 J: peak current of 43 kA, dI/dt of 120 kA/us (limited by the discharge circuit), FWHM of 1.5 us. A single thyristor was tested in the repetitive mode at the charging voltage of 4.2 kV, and the stored energy of 18 J: peak current of 5.5 kA, dI/dt of 40 kA/us, FWHM of 1.5 us were obtained. No thyristor degradation was observed after more than one million pulses at a PRF up to 1 kHz in burst mode. Thyristor recovery time was ~250 us. The switching efficiency was up to 98% depending on dV/dt and stored energy.
△ Less
Submitted 24 July, 2019;
originally announced July 2019.
-
A fast-switching magnet serving a spallation-driven ultracold neutron source
Authors:
S. Ahmed,
E. Altiere,
T. Andalib,
M. J. Barnes,
B. Bell,
C. P. Bidinosti,
Y. Bylinsky,
J. Chak,
M. Das,
C. A. Davis,
F. Fischer,
B. Franke,
M. T. W. Gericke,
P. Giampa,
M. Hahn,
S. Hansen-Romu,
K. Hatanaka,
T. Hayamizu,
B. Jamieson,
D. Jones,
K. Katsika,
S. Kawasaki,
T. Kikawa,
W. Klassen,
A. Konaka
, et al. (25 additional authors not shown)
Abstract:
A fast-switching, high-repetition-rate magnet and power supply have been developed for and operated at TRIUMF, to deliver a proton beam to the new ultracold neutron (UCN) facility. The facility possesses unique operational requirements: a time-averaged beam current of 40~$μ$A with the ability to switch the beam on or off for several minutes. These requirements are in conflict with the typical oper…
▽ More
A fast-switching, high-repetition-rate magnet and power supply have been developed for and operated at TRIUMF, to deliver a proton beam to the new ultracold neutron (UCN) facility. The facility possesses unique operational requirements: a time-averaged beam current of 40~$μ$A with the ability to switch the beam on or off for several minutes. These requirements are in conflict with the typical operation mode of the TRIUMF cyclotron which delivers nearly continuous beam to multiple users. To enable the creation of the UCN facility, a beam-sharing arrangement with another facility was made. The beam sharing is accomplished by the fast-switching (kicker) magnet which is ramped in 50~$μ$s to a current of 193~A, held there for approximately 1~ms, then ramped down in the same short period of time. This achieves a 12~mrad deflection which is sufficient to switch the proton beam between the two facilities. The kicker magnet relies on a high-current, low-inductance coil connected to a fast-switching power supply that is based on insulated-gate bipolar transistors (IGBTs). The design and performance of the kicker magnet system and initial beam delivery results are reported.
△ Less
Submitted 11 August, 2019; v1 submitted 21 May, 2019;
originally announced May 2019.
-
The Compact Linear Collider (CLIC) - 2018 Summary Report
Authors:
The CLIC,
CLICdp collaborations,
:,
T. K. Charles,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
M. Volpi,
C. Balazs,
K. Afanaciev,
V. Makarenko,
A. Patapenka,
I. Zhuk,
C. Collette,
M. J. Boland,
A. C. Abusleme Hoffman,
M. A. Diaz,
F. Garay,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu,
X. Wang,
J. Zhang
, et al. (671 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the…
▽ More
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
△ Less
Submitted 6 May, 2019; v1 submitted 14 December, 2018;
originally announced December 2018.
-
A beamline for fundamental neutron physics at TRIUMF
Authors:
S. Ahmed,
T. Andalib,
M. J. Barnes,
C. B. Bidinosti,
Y. Bylinsky,
J. Chak,
M. Das,
C. A. Davis,
B. Franke,
M. T. W. Gericke,
P. Giampa,
M. Hahn,
S. Hansen-Romu,
K. Hatanaka,
B. Jamieson,
D. Jones,
K. Katsika,
S. Kawasaki,
W. Klassen,
A. Konaka,
E. Korkmaz,
F. Kuchler,
L. Kurchaninov,
M. Lang,
L. Lee
, et al. (22 additional authors not shown)
Abstract:
This article describes the new primary proton beamline 1U at TRIUMF. The purpose of this beamline is to produce ultracold neutrons (UCN) for fundamental-physics experiments. It delivers up to 40 microA of 480 MeV protons from the TRIUMF cyclotron to a tungsten spallation target and uses a fast kicker to share the beam between the Center for Molecular and Materials Science and UCN. The beamline has…
▽ More
This article describes the new primary proton beamline 1U at TRIUMF. The purpose of this beamline is to produce ultracold neutrons (UCN) for fundamental-physics experiments. It delivers up to 40 microA of 480 MeV protons from the TRIUMF cyclotron to a tungsten spallation target and uses a fast kicker to share the beam between the Center for Molecular and Materials Science and UCN. The beamline has been successfully commissioned and operated with a beam current up to 10 microA, facilitating first large-scale UCN production in Canada.
△ Less
Submitted 26 December, 2018; v1 submitted 1 October, 2018;
originally announced October 2018.
-
Updated baseline for a staged Compact Linear Collider
Authors:
The CLIC,
CLICdp collaborations,
:,
M. J. Boland,
U. Felzmann,
P. J. Giansiracusa,
T. G. Lucas,
R. P. Rassool,
C. Balazs,
T. K. Charles,
K. Afanaciev,
I. Emeliantchik,
A. Ignatenko,
V. Makarenko,
N. Shumeiko,
A. Patapenka,
I. Zhuk,
A. C. Abusleme Hoffman,
M. A. Diaz Gutierrez,
M. Vogel Gonzalez,
Y. Chi,
X. He,
G. Pei,
S. Pei,
G. Shu
, et al. (493 additional authors not shown)
Abstract:
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-q…
▽ More
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
△ Less
Submitted 27 March, 2017; v1 submitted 26 August, 2016;
originally announced August 2016.
-
Injection and extraction magnets: kicker magnets
Authors:
M. J. Barnes,
L. Ducimetiére,
T. Fowler,
V. Senaj,
L. Sermeus
Abstract:
Each stage of an accelerator system has a limited dynamic range and therefore a chain of stages is required to reach high energy. A combination of septa and kicker magnets is frequently used to inject and extract beam from each stage. The kicker magnets typically produce rectangular field pulses with fast rise- and/or fall-times, however, the field strength is relatively low. To compensate for the…
▽ More
Each stage of an accelerator system has a limited dynamic range and therefore a chain of stages is required to reach high energy. A combination of septa and kicker magnets is frequently used to inject and extract beam from each stage. The kicker magnets typically produce rectangular field pulses with fast rise- and/or fall-times, however, the field strength is relatively low. To compensate for their relatively low field strength, the kicker magnets are generally combined with electromagnetic septa. The septa provide relatively strong field strength but are either DC or slow pulsed. This paper discusses injection and extraction systems with particular emphasis on the hardware required for the kicker magnet.
△ Less
Submitted 8 March, 2011;
originally announced March 2011.
-
Injection and extraction magnets: septa
Authors:
M. J. Barnes,
J. Borburgh,
B. Goddard,
M. Hourican
Abstract:
An accelerator has limited dynamic range: a chain of accelerators is required to reach high energy. A combination of septa and kicker magnets is frequently used to inject and extract beam from each stage. The kicker magnets typically produce rectangular field pulses with fast rise- and/or fall-times, however the field strength is relatively low. To compensate for their relatively low field strengt…
▽ More
An accelerator has limited dynamic range: a chain of accelerators is required to reach high energy. A combination of septa and kicker magnets is frequently used to inject and extract beam from each stage. The kicker magnets typically produce rectangular field pulses with fast rise- and/or fall-times, however the field strength is relatively low. To compensate for their relatively low field strength, the kicker magnets are generally combined with electromagnetic septa. The septa provide relatively strong field strength but are either DC or slow pulsed. This paper discusses injection and extraction systems with particular emphasis on the hardware required for the septa.
△ Less
Submitted 5 March, 2011;
originally announced March 2011.