The LHCb upgrade I
Authors:
LHCb collaboration,
R. Aaij,
A. S. W. Abdelmotteleb,
C. Abellan Beteta,
F. Abudinén,
C. Achard,
T. Ackernley,
B. Adeva,
M. Adinolfi,
P. Adlarson,
H. Afsharnia,
C. Agapopoulou,
C. A. Aidala,
Z. Ajaltouni,
S. Akar,
K. Akiba,
P. Albicocco,
J. Albrecht,
F. Alessio,
M. Alexander,
A. Alfonso Albero,
Z. Aliouche,
P. Alvarez Cartelle,
R. Amalric,
S. Amato
, et al. (1298 additional authors not shown)
Abstract:
The LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their select…
▽ More
The LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software.
△ Less
Submitted 17 May, 2023;
originally announced May 2023.
The ABC130 barrel module prototy** programme for the ATLAS strip tracker
Authors:
Luise Poley,
Craig Sawyer,
Sagar Addepalli,
Anthony Affolder,
Bruno Allongue,
Phil Allport,
Eric Anderssen,
Francis Anghinolfi,
Jean-François Arguin,
Jan-Hendrik Arling,
Olivier Arnaez,
Nedaa Alexandra Asbah,
Joe Ashby,
Eleni Myrto Asimakopoulou,
Naim Bora Atlay,
Ludwig Bartsch,
Matthew J. Basso,
James Beacham,
Scott L. Beaupré,
Graham Beck,
Carl Beichert,
Laura Bergsten,
Jose Bernabeu,
Prajita Bhattarai,
Ingo Bloch
, et al. (224 additional authors not shown)
Abstract:
For the Phase-II Upgrade of the ATLAS Detector, its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100 % silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000…
▽ More
For the Phase-II Upgrade of the ATLAS Detector, its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100 % silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototy** programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-25) and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototy** program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests.
△ Less
Submitted 7 September, 2020;
originally announced September 2020.