-
Total Completion Time Scheduling Under Scenarios
Authors:
Thomas Bosman,
Martijn van Ee,
Ekin Ergen,
Csanad Imreh,
Alberto Marchetti-Spaccamela,
Martin Skutella,
Leen Stougie
Abstract:
Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving scenarios. In our model, a scenario is defined as a subset of a predefined and fully specified set of jobs. The aim is to find an assignment of the whole set of…
▽ More
Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving scenarios. In our model, a scenario is defined as a subset of a predefined and fully specified set of jobs. The aim is to find an assignment of the whole set of jobs to identical parallel machines such that the schedule, obtained for the given scenarios by simply skip** the jobs not in the scenario, optimizes a function of the total completion times over all scenarios.
While the underlying scheduling problem without scenarios can be solved efficiently by a simple greedy procedure (SPT rule), scenarios, in general, make the problem NP-hard. We paint an almost complete picture of the evolving complexity landscape, drawing the line between easy and hard. One of our main algorithmic contributions relies on a deep structural result on the maximum imbalance of an optimal schedule, based on a subtle connection to Hilbert bases of a related convex cone.
△ Less
Submitted 29 February, 2024;
originally announced February 2024.
-
A 12/7-approximation algorithm for the discrete Bamboo Garden Trimming problem
Authors:
Martijn van Ee
Abstract:
We study the discrete Bamboo Garden Trimming problem (BGT), where we are given n bamboos with different growth rates. At the end of each day, one can cut down one bamboo to height zero. The goal in BGT is to make a perpetual schedule of cuts such that the height of the tallest bamboo ever is minimized. Here, we improve the current best approximation guarantee by designing a 12/7-approximation algo…
▽ More
We study the discrete Bamboo Garden Trimming problem (BGT), where we are given n bamboos with different growth rates. At the end of each day, one can cut down one bamboo to height zero. The goal in BGT is to make a perpetual schedule of cuts such that the height of the tallest bamboo ever is minimized. Here, we improve the current best approximation guarantee by designing a 12/7-approximation algorithm. This result is based on a reduction to the Pinwheel Scheduling problem. We show that a guarantee of 12/7 is essentially the best we can hope for if our algorithm is based on this type of reduction.
△ Less
Submitted 24 April, 2020;
originally announced April 2020.
-
Approximation Algorithms for Replenishment Problems with Fixed Turnover Times
Authors:
Thomas Bosman,
Martijn van Ee,
Yang Jiao,
Alberto Marchetti-Spaccamela,
R. Ravi,
Leen Stougie
Abstract:
We introduce and study a class of optimization problems we coin replenishment problems with fixed turnover times: a very natural model that has received little attention in the literature. Nodes with capacity for storing a certain commodity are located at various places; at each node the commodity depletes within a certain time, the turnover time, which is constant but can vary between locations.…
▽ More
We introduce and study a class of optimization problems we coin replenishment problems with fixed turnover times: a very natural model that has received little attention in the literature. Nodes with capacity for storing a certain commodity are located at various places; at each node the commodity depletes within a certain time, the turnover time, which is constant but can vary between locations. Nodes should never run empty, and to prevent this we may schedule nodes for replenishment every day. The natural feature that makes this problem interesting is that we may schedule a replenishment (well) before a node becomes empty, but then the next replenishment will be due earlier also. This added workload needs to be balanced against the cost of routing vehicles to do the replenishments. In this paper, we focus on the aspect of minimizing routing costs. However, the framework of recurring tasks, in which the next job of a task must be done within a fixed amount of time after the previous one is much more general and gives an adequate model for many practical situations.
Note that our problem has an infinite time horizon. However, it can be fully characterized by a compact input, containing only the location of each store and a turnover time. This makes determining its computational complexity highly challenging and indeed it remains essentially unresolved. We study the problem for two objectives: min-avg minimizes the average tour length and min-max minimizes the maximum tour length over all days. For min-max we derive a logarithmic factor approximation for the problem on general metrics and a 6-approximation for the problem on trees, for which we have a proof of NP-hardness. For min-avg we present a logarithmic approximation on general metrics, 2-approximation for trees, and a pseudopolynomial time algorithm for the line. Many intriguing problems remain open.
△ Less
Submitted 14 December, 2017;
originally announced December 2017.