Showing 1–3 of 3 results for author: Salassa, F

Searching in archive cs. Search in all archives.
.
  1. arXiv:2307.14876  [pdf, ps, other

    cs.DM

    Single machine rescheduling for new orders: properties and complexity results

    Authors: Elena Rener, Fabio Salassa, Vincent T'kindt

    Abstract: Rescheduling problems arise in a variety of situations where a previously planned schedule needs to be adjusted to deal with unforeseen events. A common problem is the arrival of new orders, i.e. jobs, which have to be integrated into the schedule of the so-called old jobs. The maximum and total absolute time deviations of the completion times of these jobs are modeled as a disruption constraint t… ▽ More

    Submitted 27 July, 2023; originally announced July 2023.

  2. arXiv:1709.00252  [pdf, other

    cs.DS

    MILP and Max-Clique based heuristics for the Eternity II puzzle

    Authors: Fabio Salassa, Wim Vancroonenburg, Tony Wauters, Federico Della Croce, Greet Vanden Berghe

    Abstract: The present paper considers a hybrid local search approach to the Eternity II puzzle and to unsigned, rectangular, edge matching puzzles in general. Both an original mixed-integer linear programming (MILP) formulation and a novel Max-Clique formulation are presented for this NP-hard problem. Although the presented formulations remain computationally intractable for medium and large sized instances… ▽ More

    Submitted 5 October, 2017; v1 submitted 1 September, 2017; originally announced September 2017.

  3. arXiv:1707.02849  [pdf, other

    cs.DM

    No-idle, no-wait: when shop scheduling meets dominoes, eulerian and hamiltonian paths

    Authors: Jean-Charles Billaut, Federico Della Croce, Fabio Salassa, Vincent T'kindt

    Abstract: In shop scheduling, several applications exist where it is required that some components perform consecutively. We refer to no-idle schedules if machines are required to operate with no inserted idle time and no-wait schedules if tasks cannot wait between the end of an operation and the start of the following one. We consider here no-idle/no-wait shop scheduling problems with makespan as performan… ▽ More

    Submitted 10 July, 2017; originally announced July 2017.