On the complexity of open shop scheduling with time lags
Authors:
Wieslaw Kubiak
Abstract:
The minimization of makespan in open shop with time lags has been shown NP-hard in the strong sense even for the case of two machines and unit-time operations. The minimization of total completion time however has remained open for that case though it has been shown NP-hard in the strong sense for weighted total completion time or for jobs with release dates. This note shows that the minimization…
▽ More
The minimization of makespan in open shop with time lags has been shown NP-hard in the strong sense even for the case of two machines and unit-time operations. The minimization of total completion time however has remained open for that case though it has been shown NP-hard in the strong sense for weighted total completion time or for jobs with release dates. This note shows that the minimization of total completion time for two machines and unit-time operations is NP-hard in the strong sense which answers the long standing open question.
△ Less
Submitted 24 March, 2022; v1 submitted 16 July, 2021;
originally announced July 2021.
-
On a Conjecture for a Hypergraph Edge Coloring Problem
Authors:
Wieslaw Kubiak
Abstract:
Let $H =(\mathcal{M} \cup \mathcal{J} ,E \cup \mathcal{E})$ be a hypergraph with two hypervertices $\mathcal{G}_1$ and $\mathcal{G}_2$ where $\mathcal{M} =\mathcal{G}_{1} \cup \mathcal{G}_{2}$ and $\mathcal{G}_{1} \cap \mathcal{G}_{2} =\varnothing $. An edge $\{h ,j\} \in E$ in a bi-partite multigraph graph $(\mathcal{M} \cup \mathcal{J} ,E)$ has an integer multiplicity $b_{j h}$, and a hyperedge…
▽ More
Let $H =(\mathcal{M} \cup \mathcal{J} ,E \cup \mathcal{E})$ be a hypergraph with two hypervertices $\mathcal{G}_1$ and $\mathcal{G}_2$ where $\mathcal{M} =\mathcal{G}_{1} \cup \mathcal{G}_{2}$ and $\mathcal{G}_{1} \cap \mathcal{G}_{2} =\varnothing $. An edge $\{h ,j\} \in E$ in a bi-partite multigraph graph $(\mathcal{M} \cup \mathcal{J} ,E)$ has an integer multiplicity $b_{j h}$, and a hyperedge $\{\mathcal{G}_{\ell } ,j\} \in \mathcal{E}$, $\ell=1,2$, has an integer multiplicity $a_{j \ell }$. It has been conjectured in [5] that $χ\prime (H) =\lceil χ\prime _{f} (H)\rceil $, where $χ\prime (H)$ and $χ\prime _{f} (H)$ are the edge chromatic number of $H$ and the fractional edge chromatic number of $H$ respectively. Motivation to study this hyperedge coloring conjecture comes from the University timetabling, and open shop scheduling with multiprocessors. We prove this conjecture in this paper.
△ Less
Submitted 11 June, 2020;
originally announced June 2020.
-
Shared Processor Scheduling of Multiprocessor Jobs
Authors:
Dariusz Dereniowski,
Wieslaw Kubiak
Abstract:
We study shared processor scheduling of $\textit{multiprocessor}$ weighted jobs where each job can be executed on its private processor and simultaneously on possibly $\textit{many}$ processors shared by all jobs in order to reduce their completion times due to processing time overlap. Each of $m$ shared processors may charge different fee but otherwise the processors are identical. The total weig…
▽ More
We study shared processor scheduling of $\textit{multiprocessor}$ weighted jobs where each job can be executed on its private processor and simultaneously on possibly $\textit{many}$ processors shared by all jobs in order to reduce their completion times due to processing time overlap. Each of $m$ shared processors may charge different fee but otherwise the processors are identical. The total weighted overlap of all jobs is to be maximized. This problem is key to subcontractor scheduling in extended enterprises and supply chains, and divisible load scheduling in computing. We prove that, quite surprisingly, $\textit{synchronized}$ schedules that complete each job using shared processors at the same time on its private and shared processors include optimal schedules. We show that optimal $α$-$\textit{private}$ schedules that require each job to use its private processor for at least $α=1/2+1/(4(m+1))$ of the time required by the job guarantee more than an $α$ fraction of the total weighted overlap of the optimal schedules. This gives an $α$-approximation algorithm that runs in strongly polynomial time for the problem, and improves the $1/2$-approximation reported recently in the literature to $5/8$-approximation for a single shared processor problem. The computational complexity of the problem, both single and multi-shared processor, remains open. We show however an LP-based optimal algorithm for $\textit{antithetical}$ instances where for any pair of jobs $j$ and $i$, if the processing time of $j$ is smaller than or equal to the processing time of $i$, then the weight of $j$ is greater than or equal to the weight of $i$.
△ Less
Submitted 20 July, 2018;
originally announced July 2018.
-
Shared processor scheduling
Authors:
Dariusz Dereniowski,
Wieslaw Kubiak
Abstract:
We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been given for the problem with equal weights in the literature. This paper extends that result by showing an $O(n \log n)$ optimization algorithm for a class of instan…
▽ More
We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been given for the problem with equal weights in the literature. This paper extends that result by showing an $O(n \log n)$ optimization algorithm for a class of instances in which non-decreasing order of jobs with respect to processing times provides a non-increasing order with respect to weights --- this instance generalizes the unweighted case of the problem. This algorithm also leads to a $\frac{1}{2}$-approximation algorithm for the general weighted problem. The complexity of the weighted problem remains open.
△ Less
Submitted 20 April, 2017;
originally announced April 2017.
-
Shared multi-processor scheduling
Authors:
Dariusz Dereniowski,
Wieslaw Kubiak
Abstract:
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time overlap. The total weighted overlap of all jobs is to be maximized. The problem models subcontracting scheduling in supply chains and divisible load scheduling i…
▽ More
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time overlap. The total weighted overlap of all jobs is to be maximized. The problem models subcontracting scheduling in supply chains and divisible load scheduling in computing. We show that synchronized schedules that complete each job at the same time on its private processor and shared processors, if any is actually used by the job, include optimal schedules. We prove that the problem is NP-hard in the strong sense for jobs with arbitrary weights, and we give an efficient, polynomial-time algorithm for the problem with equal weights.
△ Less
Submitted 2 March, 2017; v1 submitted 20 July, 2016;
originally announced July 2016.
-
Structural Properties of an Open Problem in Preemptive Scheduling
Authors:
Bo Chen,
Ed Coffman,
Dariusz Dereniowski,
Wieslaw Kubiak
Abstract:
Structural properties of optimal preemptive schedules have been studied in a number of recent papers with a primary focus on two structural parameters: the minimum number of preemptions necessary, and a tight lower bound on `shifts', i.e., the sizes of intervals bounded by the times created by preemptions, job starts, or completions. So far only rough bounds for these parameters have been derived…
▽ More
Structural properties of optimal preemptive schedules have been studied in a number of recent papers with a primary focus on two structural parameters: the minimum number of preemptions necessary, and a tight lower bound on `shifts', i.e., the sizes of intervals bounded by the times created by preemptions, job starts, or completions. So far only rough bounds for these parameters have been derived for specific problems. This paper sharpens the bounds on these structural parameters for a well-known open problem in the theory of preemptive scheduling: Instances consist of in-trees of $n$ unit-execution-time jobs with release dates, and the objective is to minimize the total completion time on two processors. This is among the current, tantalizing `threshold' problems of scheduling theory: Our literature survey reveals that any significant generalization leads to an NP-hard problem, but that any significant simplification leads to tractable problem.
For the above problem, we show that the number of preemptions necessary for optimality need not exceed $2n-1$; that the number must be of order $Ω(\log n)$ for some instances; and that the minimum shift need not be less than $2^{-2n+1}$. These bounds are obtained by combinatorial analysis of optimal schedules rather than by the analysis of polytope corners for linear-program formulations, an approach to be found in earlier papers. The bounds immediately follow from a fundamental structural property called `normality', by which minimal shifts of a job are exponentially decreasing functions. In particular, the first interval between a preempted job's start and its preemption is a multiple of 1/2, the second such interval is a multiple of 1/4, and in general, the $i$-th preemption occurs at a multiple of $2^{-i}$. We expect the new structural properties to play a prominent role in finally settling a vexing, still-open question of complexity.
△ Less
Submitted 16 February, 2015;
originally announced February 2015.
-
On Transshipment Games with Identical Newsvendors
Authors:
Behzad Hezarkhani,
Wieslaw Kubiak,
Bruce Hartman
Abstract:
In a transshipment game, supply chain agents cooperate to transship surplus products. This note studies the effect of size of transshipment coalitions on the optimal production/order quantities. It characterizes these quantities for transshipment games with identical newsvendors and normally distributed market demands. It also gives a closed form formula for equal allocation in their cores.
In a transshipment game, supply chain agents cooperate to transship surplus products. This note studies the effect of size of transshipment coalitions on the optimal production/order quantities. It characterizes these quantities for transshipment games with identical newsvendors and normally distributed market demands. It also gives a closed form formula for equal allocation in their cores.
△ Less
Submitted 24 March, 2013;
originally announced March 2013.
-
Minimum length path decompositions
Authors:
Dariusz Dereniowski,
Wieslaw Kubiak,
Yori Zwols
Abstract:
We consider a bi-criteria generalization of the pathwidth problem, where, for given integers $k,l$ and a graph $G$, we ask whether there exists a path decomposition $\cP$ of $G$ such that the width of $\cP$ is at most $k$ and the number of bags in $\cP$, i.e., the \emph{length} of $\cP$, is at most $l$.
We provide a complete complexity classification of the problem in terms of $k$ and $l$ for ge…
▽ More
We consider a bi-criteria generalization of the pathwidth problem, where, for given integers $k,l$ and a graph $G$, we ask whether there exists a path decomposition $\cP$ of $G$ such that the width of $\cP$ is at most $k$ and the number of bags in $\cP$, i.e., the \emph{length} of $\cP$, is at most $l$.
We provide a complete complexity classification of the problem in terms of $k$ and $l$ for general graphs. Contrary to the original pathwidth problem, which is fixed-parameter tractable with respect to $k$, we prove that the generalized problem is NP-complete for any fixed $k\geq 4$, and is also NP-complete for any fixed $l\geq 2$. On the other hand, we give a polynomial-time algorithm that, for any (possibly disconnected) graph $G$ and integers $k\leq 3$ and $l>0$, constructs a path decomposition of width at most $k$ and length at most $l$, if any exists.
As a by-product, we obtain an almost complete classification of the problem in terms of $k$ and $l$ for connected graphs. Namely, the problem is NP-complete for any fixed $k\geq 5$ and it is polynomial-time for any $k\leq 3$. This leaves open the case $k=4$ for connected graphs.
△ Less
Submitted 12 February, 2013;
originally announced February 2013.