-
High-speed odour sensing using miniaturised electronic nose
Authors:
Nik Dennler,
Damien Drix,
Tom P. A. Warner,
Shavika Rastogi,
Cecilia Della Casa,
Tobias Ackels,
Andreas T. Schaefer,
André van Schaik,
Michael Schmuker
Abstract:
Animals have evolved to rapidly detect and recognise brief and intermittent encounters with odour packages, exhibiting recognition capabilities within milliseconds. Artificial olfaction has faced challenges in achieving comparable results -- existing solutions are either slow; or bulky, expensive, and power-intensive -- limiting applicability in real-world scenarios for mobile robotics. Here we in…
▽ More
Animals have evolved to rapidly detect and recognise brief and intermittent encounters with odour packages, exhibiting recognition capabilities within milliseconds. Artificial olfaction has faced challenges in achieving comparable results -- existing solutions are either slow; or bulky, expensive, and power-intensive -- limiting applicability in real-world scenarios for mobile robotics. Here we introduce a miniaturised high-speed electronic nose; characterised by high-bandwidth sensor readouts, tightly controlled sensing parameters and powerful algorithms. The system is evaluated on a high-fidelity odour delivery benchmark. We showcase successful classification of tens-of-millisecond odour pulses, and demonstrate temporal pattern encoding of stimuli switching with up to 60 Hz. Those timescales are unprecedented in miniaturised low-power settings, and demonstrably exceed the performance observed in mice. For the first time, it is possible to match the temporal resolution of animal olfaction in robotic systems. This will allow for addressing challenges in environmental and industrial monitoring, security, neuroscience, and beyond.
△ Less
Submitted 5 June, 2024; v1 submitted 3 June, 2024;
originally announced June 2024.
-
Software and Firmware-logic Design for the PIP-II Machine Protection System Mode and Configuration Control at Fermilab
Authors:
L. Carmichael,
M. Austin,
J. Eisch,
E. Harms,
R. Neswold,
A. Prosser,
A. Warner,
J. Wu
Abstract:
The PIP-II Machine Protection System (MPS) requires a dedicated set of tools for configuration control and management of the machine modes and beam modes of the accelerator. The protection system reacts to signals from various elements of the machine according to rules established in a setup database in the form of a Look-Up-Table filtered by the program Mode Controller. This is achieved in accord…
▽ More
The PIP-II Machine Protection System (MPS) requires a dedicated set of tools for configuration control and management of the machine modes and beam modes of the accelerator. The protection system reacts to signals from various elements of the machine according to rules established in a setup database in the form of a Look-Up-Table filtered by the program Mode Controller. This is achieved in accordance with commands from the operator and governed by the firmware logic of the MPS. This paper describes the architecture, firmware logic, and implementation of the program mode controller.
△ Less
Submitted 31 January, 2024;
originally announced January 2024.
-
Worst-Case Misidentification Control in Sequential Change Diagnosis using the min-CuSum
Authors:
Austin Warner,
Georgios Fellouris
Abstract:
The problem of sequential change diagnosis is considered, where a sequence of independent random elements is accessed sequentially, there is an abrupt change in its distribution at some unknown time, and there are two main operational goals: to quickly detect the change and, upon stop**, to accurately identify the post-change distribution among a finite set of alternatives. The algorithm that ra…
▽ More
The problem of sequential change diagnosis is considered, where a sequence of independent random elements is accessed sequentially, there is an abrupt change in its distribution at some unknown time, and there are two main operational goals: to quickly detect the change and, upon stop**, to accurately identify the post-change distribution among a finite set of alternatives. The algorithm that raises an alarm as soon as the CuSum statistic that corresponds to one of the post-change alternatives exceeds a certain threshold is studied. When the data are generated over independent channels and the change can occur in only one of them, its worst-case with respect to the change point conditional probability of misidentification, given that there was not a false alarm, is shown to decay exponentially fast in the threshold. As a corollary, in this setup, this algorithm is shown to asymptotically minimize Lorden's detection delay criterion, simultaneously for every possible post-change distribution, within the class of schemes that satisfy prescribed bounds on the false alarm rate and the worst-case conditional probability of misidentification, as the former goes to zero sufficiently faster than the latter. Finally, these theoretical results are also illustrated in simulation studies.
△ Less
Submitted 1 October, 2023;
originally announced October 2023.
-
The SPARC Toroidal Field Model Coil Program
Authors:
Zachary Hartwig,
Rui Vieira,
Darby Dunn,
Theodore Golfinopoulos,
Brian LaBombard,
Christopher Lammi,
Phil Michael,
Susan Agabian,
David Arsenault,
Raheem Barnett,
Mike Barry,
Larry Bartoszek,
William Beck,
David Bellofatto,
Daniel Brunner,
William Burke,
Jason Burrows,
William Byford,
Charles Cauley,
Sarah Chamberlain,
David Chavarria,
JL Cheng,
James Chicarello,
Karen Cote,
Corinne Cotta
, et al. (75 additional authors not shown)
Abstract:
The SPARC Toroidal Field Model Coil (TFMC) Program was a three-year effort between 2018 and 2021 that developed novel Rare Earth Yttrium Barium Copper Oxide (REBCO) superconductor technologies and then successfully utilized these technologies to design, build, and test a first-in-class, high-field (~20 T), representative-scale (~3 m) superconducting toroidal field coil. With the principal objectiv…
▽ More
The SPARC Toroidal Field Model Coil (TFMC) Program was a three-year effort between 2018 and 2021 that developed novel Rare Earth Yttrium Barium Copper Oxide (REBCO) superconductor technologies and then successfully utilized these technologies to design, build, and test a first-in-class, high-field (~20 T), representative-scale (~3 m) superconducting toroidal field coil. With the principal objective of demonstrating mature, large-scale, REBCO magnets, the project was executed jointly by the MIT Plasma Science and Fusion Center (PSFC) and Commonwealth Fusion Systems (CFS). The TFMC achieved its programmatic goal of experimentally demonstrating a large-scale high-field REBCO magnet, achieving 20.1 T peak field-on-conductor with 40.5 kA of terminal current, 815 kN/m of Lorentz loading on the REBCO stacks, and almost 1 GPa of mechanical stress accommodated by the structural case. Fifteen internal demountable pancake-to-pancake joints operated in the 0.5 to 2.0 nOhm range at 20 K and in magnetic fields up to 12 T. The DC and AC electromagnetic performance of the magnet, predicted by new advances in high-fidelity computational models, was confirmed in two test campaigns while the massively parallel, single-pass, pressure-vessel style coolant scheme capable of large heat removal was validated. The REBCO current lead and feeder system was experimentally qualified up to 50 kA, and the crycooler based cryogenic system provided 600 W of cooling power at 20 K with mass flow rates up to 70 g/s at a maximum design pressure of 20 bar-a for the test campaigns. Finally, the feasibility of using passive, self-protection against a quench in a fusion-scale NI TF coil was experimentally assessed with an intentional open-circuit quench at 31.5 kA terminal current.
△ Less
Submitted 18 August, 2023;
originally announced August 2023.
-
A Novel Alternating Joint Longitudinal Model for Post-ICU Hemoglobin Prediction
Authors:
Gabriel Demuth,
Curtis Storlie,
Matthew A. Warner,
Daryl J. Kor,
Phillip J. Shulte,
Andrew C. Hanson
Abstract:
Anemia is common in patients post-ICU discharge. However, which patients will develop or recover from anemia remains unclear. Prediction of anemia in this population is complicated by hospital readmissions, which can have substantial impacts on hemoglobin levels due to surgery, blood transfusions, or being a proxy for severe illness. We therefore introduce a novel Bayesian joint longitudinal model…
▽ More
Anemia is common in patients post-ICU discharge. However, which patients will develop or recover from anemia remains unclear. Prediction of anemia in this population is complicated by hospital readmissions, which can have substantial impacts on hemoglobin levels due to surgery, blood transfusions, or being a proxy for severe illness. We therefore introduce a novel Bayesian joint longitudinal model for hemoglobin over time, which includes specific parametric effects for hospital admission and discharge. These effects themselves depend on a patient's hemoglobin at time of hospitalization; therefore hemoglobin at a given time is a function of that patient's complete history of admissions and discharges up until that time. However, because the effects of an admission or discharge do not depend on themselves, the model remains well defined. We validate our model on a retrospective cohort of 6,876 patients from the Rochester Epidemiology Project using cross-validation, and find it accurately estimates hemoglobin and predicts anemic status and hospital readmission in the 30 days post-discharge with AUCs of .82 and .72, respectively.
△ Less
Submitted 17 February, 2023;
originally announced February 2023.
-
Sequential Change Diagnosis Revisited and the Adaptive Matrix CuSum
Authors:
Austin Warner,
Georgios Fellouris
Abstract:
The problem of sequential change diagnosis is considered, where observations are obtained on-line, an abrupt change occurs in their distribution, and the goal is to quickly detect the change and accurately identify the post-change distribution, while controlling the false alarm rate. A finite set of alternatives is postulated for the post-change regime, but no prior information is assumed for the…
▽ More
The problem of sequential change diagnosis is considered, where observations are obtained on-line, an abrupt change occurs in their distribution, and the goal is to quickly detect the change and accurately identify the post-change distribution, while controlling the false alarm rate. A finite set of alternatives is postulated for the post-change regime, but no prior information is assumed for the unknown change-point. A drawback of many algorithms that have been proposed for this problem is the implicit use of pre-change data for determining the post-change distribution. This can lead to very large conditional probabilities of misidentification, given that there was no false alarm, unless the change occurs soon after monitoring begins. A novel, recursive algorithm is proposed and shown to resolve this issue without the use of additional tuning parameters and without sacrificing control of the worst-case delay in Lorden's sense. A theoretical analysis is conducted for a general family of sequential change diagnosis procedures, which supports the proposed algorithm and revises certain state-of-the-art results. Additionally, a novel, comprehensive method is proposed for the design and evaluation of sequential change diagnosis algorithms. This method is illustrated with simulation studies, where existing procedures are compared to the proposed.
△ Less
Submitted 23 November, 2022;
originally announced November 2022.
-
Experience With Machine Protection Systems At PIP2IT
Authors:
PIP-II Collaboration,
:,
A. Warner,
M. Austin,
L. Carmichael,
J. -P. Carneiro,
B. Hanna,
E. Harms,
R. Neswold,
L. Prost,
R. Rivera,
A. Shemyakin,
M. Ibrahim,
J. Wu
Abstract:
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. T…
▽ More
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$μ$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.
△ Less
Submitted 8 September, 2022; v1 submitted 2 September, 2022;
originally announced September 2022.
-
Experience with Long-pulse Operation of the PIP2IT Warm Front End
Authors:
A. Shemyakin,
J. -P. Carneiro,
A. Chen,
D. Frolov,
B. Hanna,
R. Neswold,
L. Prost,
G. Saewert,
A. Saini,
V. Scarpine,
A. Warner,
J. -Y. Wu,
C. Richard
Abstract:
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the prop…
▽ More
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.
△ Less
Submitted 6 December, 2019;
originally announced December 2019.
-
Commissioning and Operation of FAST Electron Linac at Fermilab
Authors:
A. Romanov,
C. Baffes,
D. R. Broemmelsiek,
K. Carlson,
D. J. Crawford,
N. Eddy,
D. Edstrom Jr.,
E. R. Harms,
J. Hurd,
M. Kucera,
J. Leibfritz,
I. Rakhno,
J. Reid,
J. Ruan,
J. Santucci,
V. Shiltsev,
G. Stancari,
R. Thurman-Keup,
A. Valishev,
A. Warner
Abstract:
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF…
▽ More
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The photoinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commissioning such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation.
△ Less
Submitted 9 November, 2018;
originally announced November 2018.
-
PIP-II Injector Test Warm Front End: Commissioning Update
Authors:
L. Prost,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
B. Chase,
A. Chen,
E. Cullerton,
P. F. Derwent,
J. P. Edelen,
J. Einstein-Curtis,
D. Frolov,
B. Hanna,
D. Peterson,
G. Saewert,
A. Saini,
V. Scarpine,
A. Shemyakin,
J. Steimel,
D. Sun,
A. Warner,
C. Richard,
V. L. S. Sista
Abstract:
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,…
▽ More
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
△ Less
Submitted 14 June, 2018;
originally announced June 2018.
-
Status of the warm front end of PIP-II injector test
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
A. Chen,
P. F. Derwent,
J. P. Edelen,
D. Frolov,
B. Hanna,
L. Prost,
A. Saini,
G. Saewert,
V. Scarpine,
V. L. S. Sista,
J. Steimel,
D. Sun,
A. Warner
Abstract:
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T…
▽ More
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.
△ Less
Submitted 23 March, 2018;
originally announced March 2018.
-
Cryogenic loss monitors with FPGA TDC signal processing
Authors:
A. Warner,
J. Wu
Abstract:
Radiation hard helium gas ionization chambers capable of operating in vacuum at temperatures ranging from 5K to 350K have been designed, fabricated and tested and will be used inside the cryostats at Fermilab's Superconducting Radiofrequency beam test facility. The chamber vessels are made of stainless steel and all materials used including seals are known to be radiation hard and suitable for ope…
▽ More
Radiation hard helium gas ionization chambers capable of operating in vacuum at temperatures ranging from 5K to 350K have been designed, fabricated and tested and will be used inside the cryostats at Fermilab's Superconducting Radiofrequency beam test facility. The chamber vessels are made of stainless steel and all materials used including seals are known to be radiation hard and suitable for operation at 5K. The chambers are designed to measure radiation up to 30 kRad/hr with sensitivity of approximately 1.9 pA/(Rad/hr). The signal current is measured with a recycling integrator current-to-frequency converter to achieve a required measurement capability for low current and a wide dynamic range. A novel scheme of using an FPGA-based time-to-digital converter (TDC) to measure time intervals between pulses output from the recycling integrator is employed to ensure a fast beam loss response along with a current measurement resolution better than 10-bit. This paper will describe the results obtained and highlight the processing techniques used.
△ Less
Submitted 28 September, 2012;
originally announced September 2012.
-
Development of a machine protection system for the Superconducting Beam Test Facility at Fermilab
Authors:
A. Warner,
L. Carmichael,
M. Church,
R. Neswold
Abstract:
Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The accelerator is being designed with the capability to operate with up to 3000 bunches per macro-pulse, 5Hz repetition rate and 1.5 GeV beam energy. It will be abl…
▽ More
Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The accelerator is being designed with the capability to operate with up to 3000 bunches per macro-pulse, 5Hz repetition rate and 1.5 GeV beam energy. It will be able to sustain an average beam power of 72 KW at the bunch charge of 3.2 nC. Operation at full intensity will deposit enough energy in niobium material to approach the melting point of 2500 °C. In the early phase with only 3 cryomodules installed the facility will be capable of generating electron beam energies of 810 MeV and an average beam power that approaches 40 KW. In either case a robust Machine Protection System (MPS) is required to mitigate effects due to such large damage potentials. This paper will describe the MPS system being developed, the system requirements and the controls issues under consideration.
△ Less
Submitted 28 September, 2012;
originally announced September 2012.
-
Proceedings of the 35th Annual Australian/New Zealand Condensed Matter and Materials Meeting
Authors:
K. Radhanpura,
S. Hargreaves,
R. A. Lewis,
H. Krüger,
E. Rey,
P. -Z. Si,
T. Söhnel,
V. Jovic,
J. B. Metson,
G. I. N. Waterhouse,
A. A. Abiona,
W. J. Kemp,
A. P. Byrne,
M. C. Ridgeway,
H. Timmers,
J. D. Cashion,
W. P. Gates,
T. L. Greaves,
O. Dorjkhaidav,
E. Constable,
L. G. Gladkis,
J. M. Scarvell,
P. N. Smith,
C. J. Hamer,
O. Rojas
, et al. (20 additional authors not shown)
Abstract:
The 35th Australian/New Zealand Annual Condensed Matter and Materials Meeting was held at the Charles Sturt University campus in Wagga Wagga, NSW, Australia from the 1st to the 4th of February 2011. The conference was attended by 92 delegates from a range of universities across Australia, New Zealand and further afield.
There were a total of 9 invited and 21 contributed talks during the three da…
▽ More
The 35th Australian/New Zealand Annual Condensed Matter and Materials Meeting was held at the Charles Sturt University campus in Wagga Wagga, NSW, Australia from the 1st to the 4th of February 2011. The conference was attended by 92 delegates from a range of universities across Australia, New Zealand and further afield.
There were a total of 9 invited and 21 contributed talks during the three days of scientific sessions, as well as 2 poster sessions with a total of 49 poster presentations. All presenters were invited to submit a manuscript for publication in the conference proceedings. The length limits where six pages for invited papers and four pages for contributed papers. Each manuscript was reviewed by two anonymous referees and 18 papers were accepted for publication.
The accepted manuscripts are also available at the online publication section of the Australian Institute of Physics national web site (http://www.aip.org.au/).
△ Less
Submitted 18 July, 2011;
originally announced July 2011.
-
Comment on "Evidence for Neutrinoless Double Beta Decay"
Authors:
C. E. Aalseth,
F. T. Avignone III,
A. Barabash,
F. Boehm,
R. L. Brodzinski,
J. I. Collar,
P. J. Doe,
H. Ejiri,
S. R. Elliott,
E. Fiorini,
R. J. Gaitskell,
G. Gratta,
R. Hazama,
K. Kazkaz,
G. S. King III,
R. T. Kouzes,
H. S. Miley,
M. K. Moe,
A. Morales,
J. Morales,
A. Piepke,
R. G. H. Robertson,
W. Tornow,
P. Vogel,
R. A. Warner
, et al. (1 additional authors not shown)
Abstract:
We comment on the recent claim for the experimental observation of neutrinoless double-beta decay. We discuss several limitations in the analysis provided in that paper and conclude that there is no basis for the presented claim.
We comment on the recent claim for the experimental observation of neutrinoless double-beta decay. We discuss several limitations in the analysis provided in that paper and conclude that there is no basis for the presented claim.
△ Less
Submitted 22 May, 2002; v1 submitted 7 February, 2002;
originally announced February 2002.
-
The Majorana Ge-76 Double-Beta Decay Project
Authors:
The Majorana Collaboration,
C. E. Aalseth,
D. Anderson,
F. T. Avignone III,
A. Barabash,
T. W. Bowyer,
R. L. Brodzinski,
V. Brudanin,
J. I. Collar,
P. J. Doe,
S. Egorov,
S. R. Elliott,
H. A. Farach,
R. Gaitskell,
D. Jordan,
O. Kochetov,
S. Konovalov,
R. Kouzes,
H. S. Miley,
W. K. Pitts,
J. H. Reeves,
R. G. H. Robertson,
V. Sandukovsky,
E. Smith,
V. Stekhanov
, et al. (7 additional authors not shown)
Abstract:
The Majorana Experiment is a next-generation Ge-76 double-beta decay search. It will employ 500 kg of Ge, isotopically enriched to 86% in Ge-76, in the form of 200 detectors in a close-packed array for high granularity. Each crystal will be electronically segmented, with each region fitted with pulse-shape analysis electronics. A half-life sensitivity is predicted of 4.2e27 y or <m_nu> < 0.02-0.…
▽ More
The Majorana Experiment is a next-generation Ge-76 double-beta decay search. It will employ 500 kg of Ge, isotopically enriched to 86% in Ge-76, in the form of 200 detectors in a close-packed array for high granularity. Each crystal will be electronically segmented, with each region fitted with pulse-shape analysis electronics. A half-life sensitivity is predicted of 4.2e27 y or <m_nu> < 0.02-0.07 eV, depending on the nuclear matrix elements used to interpret the data.
△ Less
Submitted 10 January, 2002;
originally announced January 2002.