A strategy to identify breakdown location in MITICA test facility: results of high voltage test campaign
Authors:
Loris Zanotto,
Marco Boldrin,
Giuseppe Chitarin,
Mattia Dan,
Tommaso Patton,
Francesco Santoro,
Vanni Toigo,
Hiroyuki Tobari,
Atsushi Kojima,
Hans Decamps
Abstract:
The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Voltage equipment have been individually commissioned, whereas the integration tests are ongoing. It is a challenging process due to the unconventional application, to the variety of different electrical technologies involved…
▽ More
The Acceleration Grid Power Supply of the MITICA test facility in Padova (Italy) is currently under commissioning. The power conversion system, the DC generator, and the High Voltage equipment have been individually commissioned, whereas the integration tests are ongoing. It is a challenging process due to the unconventional application, to the variety of different electrical technologies involved and to the complexity of the interfaces. During the integrated tests of the power supplies the achievement of 700kV stable operation has been demonstrated for the first time in a Neutral Beam Injector, but an unexpected event occurred, most likely a breakdown in the HV part, which resulted in a fault of the DC generator. A subsequent test using an auxiliary power supply was performed to check the voltage withstanding capability of the HV plant, but another breakdown occurred at around 1MV. This paper describes the activity performed to identify the location of the breakdowns affecting the integrated tests. A test campaign has been devised with increased diagnostic capabilities and specific strategy conceived to trigger intentional breakdowns in specific locations and collect measurement patterns for different cases. The results of the campaign will be presented and the current understanding of the issue will be described, with a view on future tests and further improvements of diagnostics.
△ Less
Submitted 26 April, 2023;
originally announced April 2023.
-
Partial Discharges detection in 1 MV power supplies in MITICA experiment, the ITER Heating Neutral Beam Injector prototype
Authors:
Marco Boldrin,
Mattia Dan,
Vanni Toigo,
Loris Zanotto,
Paolo Barbato,
Lucio Baseggio,
Manola Carraro,
Raffaele Ghiraldelli,
Enrico Zerbetto,
Stefano Malgarotti,
Alberto Rizzi,
Giuseppe Rizzi,
Hans Decamps,
Hiroyuki Tobari
Abstract:
MITICA (Megavolt ITER Injector & Concept Advancement), the full scale prototype of ITER Heating Neutral Beam, is under realization at the Neutral Beam Test Facility (Padova, Italy). It is designed to deliver 16.5 MW to ITER plasma, obtained by accelerating negative Deuterium ions up to 1 MeV for a total ion current of 40 A and then neutralized. MITICA Acceleration Power Supply is composed of sever…
▽ More
MITICA (Megavolt ITER Injector & Concept Advancement), the full scale prototype of ITER Heating Neutral Beam, is under realization at the Neutral Beam Test Facility (Padova, Italy). It is designed to deliver 16.5 MW to ITER plasma, obtained by accelerating negative Deuterium ions up to 1 MeV for a total ion current of 40 A and then neutralized. MITICA Acceleration Power Supply is composed of several non-standard equipment, beyond industrial standard for insulation voltage level (-1 MVdc) and dimensions. Voltage withstand tests (up to 1.265 MVdc) have been performed in five subsequent steps (from 2018 to 2019), according to the installation progress, after connecting equipment belonging to different procurements. During integrated commissioning, started in 2021, two breakdowns occurred in a position of the HV plant not still identified, so they could be occurred either in air or in SF6. To identify the locations of possible weak insulation points, the existing diagnostics for partial discharge detection (the precursor of breakdowns) as a first step have been improved on air-insulated parts by consisting in a set of instrumentation, like capacitive probes and off-the-shelf instruments for AC application (acoustic and electromagnetic sensors). The paper deals with the instruments qualification to assess their suitability for DC usage and then with the investigation performed in MITICA, in particular: 1) sensitivity assessment campaign, with artificially produced corona effect to identify the minimum threshold of each diagnostics 2) voltage application to MITICA plant, moving the instrumentation around equipment and increasing progressively the voltage looking for corona phenomena to identify possible weak insulation points.
△ Less
Submitted 5 April, 2023;
originally announced April 2023.
-
Overview on electrical issues faced during the SPIDER experimental campaigns
Authors:
Alberto Maistrello,
Matteo Agostini,
Marco Bigi,
Matteo Brombin,
Mattia Dan,
Riccardo Casagrande,
Marco De Nardi,
Alberto Ferro,
Elena Gaio,
Palak Jain,
Francesco Lunardon,
Nicolò Marconato,
Diego Marcuzzi,
Mauro Recchia,
Tommaso Patton,
Mauro Pavei,
Francesco Santoro,
Vanni Toigo,
Loris Zanotto,
Marco Barbisan,
Lucio Baseggio,
Marco Bernardi,
Giovanni Berton,
Marco Boldrin,
Samuele Dal Bello
, et al. (17 additional authors not shown)
Abstract:
SPIDER is the full-scale prototype of the ion source of the ITER Heating Neutral Beam Injector, where negative ions of Hydrogen or Deuterium are produced by a RF generated plasma and accelerated with a set of grids up to ~100 keV. The Power Supply System is composed of high voltage dc power supplies capable of handling frequent grid breakdowns, high current dc generators for the magnetic filter fi…
▽ More
SPIDER is the full-scale prototype of the ion source of the ITER Heating Neutral Beam Injector, where negative ions of Hydrogen or Deuterium are produced by a RF generated plasma and accelerated with a set of grids up to ~100 keV. The Power Supply System is composed of high voltage dc power supplies capable of handling frequent grid breakdowns, high current dc generators for the magnetic filter field and RF generators for the plasma generation. During the first 3 years of SPIDER operation different electrical issues were discovered, understood and addressed thanks to deep analyses of the experimental results supported by modelling activities. The paper gives an overview on the observed phenomena and relevant analyses to understand them, on the effectiveness of the short-term modifications provided to SPIDER to face the encountered issues and on the design principle of long-term solutions to be introduced during the currently ongoing long shutdown.
△ Less
Submitted 5 April, 2023;
originally announced April 2023.
-
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
Authors:
D. Marcuzzi,
V. Toigo,
M. Boldrin,
G. Chitarin,
S. Dal Bello,
L. Grando,
A. Luchetta,
R. Pasqualotto,
M. Pavei,
G. Serianni,
L. Zanotto,
R. Agnello,
P. Agostinetti,
M. Agostini,
D. Aprile,
M. Barbisan,
M. Battistella,
G. Berton,
M. Bigi,
M. Brombin,
V. Candela,
V. Candeloro,
A. Canton,
R. Casagrande,
C. Cavallini
, et al. (117 additional authors not shown)
Abstract:
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedi…
▽ More
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to develo** and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.
△ Less
Submitted 4 April, 2023;
originally announced April 2023.