Skip to main content

Showing 1–45 of 45 results for author: Shemyakin, A

.
  1. arXiv:2312.07785  [pdf

    physics.acc-ph

    Scheme for quantitative description of longitudinal drifts in the Fermilab Linac and their correction

    Authors: Sheldon Rego, Ralitsa Sharankova, Alexander Shemyakin

    Abstract: The Fermilab Linac accepts the 0.75 MeV H- ions from the front end and accelerates them to 400 MeV for injection into the Booster. Day-to-day drifts of the longitudinal trajectory in the Linac, reconstructed from phase readings of Beam Position Monitors, are at the level of several degrees. They are believed to cause additional losses both in the Linac and Booster, and are addressed by empirically… ▽ More

    Submitted 12 December, 2023; originally announced December 2023.

    Report number: FERMILAB-TM-2816-AD-STUDENT

  2. arXiv:2310.13520  [pdf

    physics.acc-ph

    Status of the IOTA Proton Injector

    Authors: D. Edstrom Jr., A. Romanov, D. Broemmelsiek, K. Carlson, J. -P. Carneiro, H. Piekarz, A. Shemyakin, A. Valishev

    Abstract: The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of 2024, when it will operate alongside the existing electron injector beamline to… ▽ More

    Submitted 20 October, 2023; originally announced October 2023.

    Comments: 68th ICFA Advanced Beam Dynamics workshop on high-Intensity and High-Brightness Hadron Beams (HB2023). arXiv admin note: substantial text overlap with arXiv:2305.09830

    Report number: FERMILAB-CONF-23-568-AD

  3. arXiv:2305.09830  [pdf

    physics.acc-ph

    IOTA Proton Injector Beamline Installation

    Authors: D. Edstrom Jr, D. Broemmelsiek, K. Carlson, J. -P. Carneiro, H. Piekarz, A. Romanov, A. Shemyakin, A. Valishev

    Abstract: The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fund… ▽ More

    Submitted 16 May, 2023; originally announced May 2023.

    Report number: FERMILAB-CONF-23-178-AD

  4. arXiv:2209.01227  [pdf

    physics.acc-ph

    Experience With Machine Protection Systems At PIP2IT

    Authors: PIP-II Collaboration, :, A. Warner, M. Austin, L. Carmichael, J. -P. Carneiro, B. Hanna, E. Harms, R. Neswold, L. Prost, R. Rivera, A. Shemyakin, M. Ibrahim, J. Wu

    Abstract: The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. T… ▽ More

    Submitted 8 September, 2022; v1 submitted 2 September, 2022; originally announced September 2022.

    Comments: 11th International Beam Instrumentation Conference (IBIC 2022)

    Report number: FERMILAB-CONF-22-644-AD-PPD-SCD

  5. arXiv:2208.11753  [pdf, other

    physics.acc-ph

    Beam Dynamics Studies at the PIP-II Injector Test Facility

    Authors: J. -P. Carneiro, B. Hanna, E. Podzeyev, L. Prost, A. Saini, A. Shemyakin

    Abstract: A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules… ▽ More

    Submitted 24 August, 2022; originally announced August 2022.

    Report number: FERMILAB-CONF-22-630-AD-PIP2

  6. arXiv:2208.04386  [pdf

    physics.acc-ph

    Finding Beam Loss Locations at PIP2IT Accelerator With Oscillating Dipole Correctors

    Authors: A. Shemyakin

    Abstract: The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H- beam to 16 MeV. To determine location of the beam loss in the accelerators low-energy part, where radiation monitors are ineffective, a method using oscilla… ▽ More

    Submitted 7 September, 2022; v1 submitted 8 August, 2022; originally announced August 2022.

    Report number: FERMILAB-CONF-22-562-AD

  7. arXiv:2109.11589  [pdf

    physics.acc-ph

    Orbit response measurements with oscillating trajectories

    Authors: Alexander Shemyakin

    Abstract: Optical properties of components in a linac can be reconstructed from analysis of the orbit response matrix, composed from responses of BPMs to changes in currents of dipole correctors. An efficient way to record such response, discussed in this note, is to excite the corrector current with a sine wave and record its Fourier component of the BPM spectrum. Because of a narrow band of the excitation… ▽ More

    Submitted 23 September, 2021; originally announced September 2021.

  8. arXiv:2107.13041  [pdf

    physics.acc-ph

    Energy gain in a two-gap RF cavity

    Authors: Alexander Shemyakin

    Abstract: Velocity of a deeply non-relativistic particle can change during its acceleration inside an RF cavity significantly enough to cause a deviation of the energy gain from a linear model. This paper derives formulae for corrections to the energy gain in a two-gap RF cavity calculated by taking into account this velocity change in the next approximation. Then, the results are compared with direct parti… ▽ More

    Submitted 27 July, 2021; originally announced July 2021.

  9. arXiv:1912.03291  [pdf

    physics.acc-ph

    Measurements of a 2.1 MeV H$^-$ beam with an Allison scanner

    Authors: C. Richard, J. -P. Carneiro, B. Hanna, L. Prost, A. Saini, V. Scarpine, A. Shemyakin

    Abstract: Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action… ▽ More

    Submitted 6 December, 2019; originally announced December 2019.

  10. arXiv:1912.03180  [pdf

    physics.acc-ph

    Experience with Long-pulse Operation of the PIP2IT Warm Front End

    Authors: A. Shemyakin, J. -P. Carneiro, A. Chen, D. Frolov, B. Hanna, R. Neswold, L. Prost, G. Saewert, A. Saini, V. Scarpine, A. Warner, J. -Y. Wu, C. Richard

    Abstract: The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the prop… ▽ More

    Submitted 6 December, 2019; originally announced December 2019.

    Comments: 4 pages, NAPAC2019

    Report number: FERMILAB-CONF-19-439-AD

  11. arXiv:1912.02897  [pdf

    physics.acc-ph

    Test Results of PIP2IT MEBT Vacuum Protection System

    Authors: A. Chen, R. Andrews, C. Baffes, D. Lambert, L. Prost, A. Shemyakin, T. Zuchnik

    Abstract: The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a v… ▽ More

    Submitted 5 December, 2019; originally announced December 2019.

    Comments: 3 pages, NAPAC2019

    Report number: FERMILAB-PUB-19-443-AD

  12. arXiv:1905.00363  [pdf

    physics.acc-ph

    Finding beam loss locations in a linac with oscillating dipole correctors

    Authors: Alexander Shemyakin

    Abstract: The paper proposes a method of finding the beam loss locations in a linac. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync produces a line at the corresponding frequency in spectra of current-sensitive devices downstream of the loss point. The phase of this signal contains information about the location of th… ▽ More

    Submitted 1 May, 2019; originally announced May 2019.

  13. arXiv:1810.04548  [pdf

    physics.acc-ph

    Effect of image charges on differential trajectories measurements

    Authors: Alexander Shemyakin

    Abstract: Effect of image charges on reconstruction of focusing elements calibration with differential trajectory method is estimated and found negligible for measurements at the PIP2IT MEBT.

    Submitted 10 October, 2018; originally announced October 2018.

  14. arXiv:1808.08283  [pdf

    physics.acc-ph

    Experimental Study of Beam Dynamics In The PIP-II MEBT Prototype

    Authors: A. Shemyakin, J. -P. Carneiro, B. Hanna, V. Lebedev, L. Prost, A. Saini, V. Scarpine, V. L. S. Sista, C. Richard

    Abstract: The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a… ▽ More

    Submitted 24 August, 2018; originally announced August 2018.

    Comments: 6 pp

    Report number: Fermilab-Conf-18-228-AD

  15. arXiv:1806.05708  [pdf

    physics.acc-ph

    PIP-II Injector Test Warm Front End: Commissioning Update

    Authors: L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista

    Abstract: The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,… ▽ More

    Submitted 14 June, 2018; originally announced June 2018.

    Comments: 4 pp

    Report number: Fermilab-Conf-18-017-AD

  16. arXiv:1805.01920  [pdf

    physics.acc-ph

    Low Emittance Growth in a LEBT with Un-Neutralized Section

    Authors: L. Prost, J. -P. Carneiro, A. Shemyakin

    Abstract: In a Low Energy Beam Transport line (LEBT), the emittance growth due to the beam's space charge is typically suppressed by way of neutralization from either electrons or ions, which originate from ionization of the background gas. In cases where the beam is chopped, the neutralization pattern usually changes throughout the beginning of the pulse, causing the Twiss parameters to differ significantl… ▽ More

    Submitted 4 May, 2018; originally announced May 2018.

    Comments: 10 pp

    Report number: Fermilab-Pub-17-599-AD

  17. arXiv:1803.08940  [pdf

    physics.acc-ph

    Status of the warm front end of PIP-II injector test

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, J. -P. Carneiro, A. Chen, P. F. Derwent, J. P. Edelen, D. Frolov, B. Hanna, L. Prost, A. Saini, G. Saewert, V. Scarpine, V. L. S. Sista, J. Steimel, D. Sun, A. Warner

    Abstract: The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T… ▽ More

    Submitted 23 March, 2018; originally announced March 2018.

    Comments: 4 pp. 8th International Particle Accelerator Conference (IPAC 2017) 14-19 May 2017. Copenhagen, Denmark

    Report number: Fermilab-Conf-17-146-AD

  18. arXiv:1709.07516  [pdf

    physics.acc-ph

    Characterization of the beam from the RFQ of the PIP-II Injector Test

    Authors: A. Shemyakin, J. -P. Carneiro, B. Hanna, L. Prost, A. Saini, V. Scarpine, V. L. S. Sista, J. Steimel

    Abstract: A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and emittance.

    Submitted 21 September, 2017; originally announced September 2017.

    Comments: 4 pp. Submitted to IPAC 2017

    Report number: Fermilab-Conf-17-147-AD

  19. arXiv:1704.08744  [pdf

    physics.acc-ph

    PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, J. -P. Carneiro, A. Chen, R. D'Arcy, B. Hanna, L. Prost, V. Scarpine, C. Wiesner

    Abstract: The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

    Submitted 27 April, 2017; originally announced April 2017.

    Comments: 11 p

    Report number: Fermilab-Conf-16-350-AD

  20. arXiv:1704.05523  [pdf

    physics.acc-ph

    Low Emittance Growth In a LEBT With Un-Neutralized Section

    Authors: L. Prost, J. -P. Carneiro, A. Shemyakin

    Abstract: In a Low Energy Beam Transport line (LEBT), the emittance growth due to the beam's own space charge is typically suppressed by way of neutralization from either electrons or ions, which originate from ionization of the background gas. In cases where the beam is chopped, the neutralization pattern changes throughout the beginning of the pulse, causing the Twiss parameters to differ significantly fr… ▽ More

    Submitted 18 April, 2017; originally announced April 2017.

    Comments: 3 pp

    Report number: Fermilab-Conf-16-065-AD

  21. arXiv:1704.04466  [pdf

    physics.acc-ph

    The PXIE LEBT Design Choices

    Authors: L. Prost, A. Shemyakin

    Abstract: Typical front-ends of modern light-ion high-intensity accelerators typically consist of an ion source, a Low Energy Beam Transport (LEBT), a Radiofrequency Quadrupole (RFQ) and a Medium Energy Beam Transport (MEBT), which is followed by the main linac accelerating structures. Over the years, many LEBTs have been designed, constructed and operated very successfully. In this paper, we present the gu… ▽ More

    Submitted 14 April, 2017; originally announced April 2017.

    Comments: 3 pp

    Report number: FERMILAB-CONF-16-066-AD

  22. arXiv:1701.01078  [pdf

    physics.acc-ph

    Installation Progress At The PIP-II Injector Test At Fermilab

    Authors: C. Baffes, M. Alvarez, R. Andrews, A. Chen, J. Czajkowski, P. Derwent, J. Edelen, B. Hanna, B. Hartsell, K. Kendziora, D. Mitchell, L. Prost, V. Scarpine, A. Shemyakin, J. Steimel, T. Zuchnik, A. Edelen

    Abstract: A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr… ▽ More

    Submitted 4 January, 2017; originally announced January 2017.

    Comments: 4 pp

    Report number: Fermilab-Conf-16-434-AD

  23. arXiv:1612.09539  [pdf

    physics.acc-ph

    Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed

    Authors: A. Shemyakin

    Abstract: Deviation of the Fast Faraday Cup signal from the longitudinal shape of the measured bunch is estimated, and a simple formula for the increase of the signal rms width is suggested.

    Submitted 30 December, 2016; originally announced December 2016.

  24. arXiv:1511.01479  [pdf

    physics.acc-ph

    Pxie low energy beam transport commissioning

    Authors: L. Prost, M. Alvarez, R. Andrews, J. -P. Carneiro, B. Hanna, V. Scarpine, A. Shemyakin, R. D'Arcy, C. Wiesner

    Abstract: The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (… ▽ More

    Submitted 4 November, 2015; originally announced November 2015.

    Comments: 3 pp

    Report number: FERMILAB-CONF-15-176-AD

  25. arXiv:1504.06302  [pdf

    physics.acc-ph

    Scheme for Low Energy Beam Transport with a non-neutralized section

    Authors: A. Shemyakin, L. Prost

    Abstract: A typical Low Energy Beam Transport (LEBT) design relies on dynamics with nearly complete beam space charge neutralization over the entire length of the LEBT. This paper argues that, for a beam with modest perveance and uniform current density distribution when generated at the source, a downstream portion of the LEBT can be un-neutralized without significant emittance growth.

    Submitted 23 April, 2015; originally announced April 2015.

  26. arXiv:1503.06055  [pdf, other

    physics.acc-ph

    Calculation of the effect of slit size on emittance measurements made by a two-slit scanner

    Authors: Richard D'Arcy, Alexander Shemyakin

    Abstract: Parallel slit-slit devices are commonly used to measure the transverse emittance of a particle beam, selecting a portion of the beam with the front slit and measuring the angular distribution with the rear. This paper calculates the effect of finite slit sizes on measured emittance and Twiss functions in the case of Gaussian spatial and angular distributions of the oncoming beam. A formula for rec… ▽ More

    Submitted 11 January, 2016; v1 submitted 20 March, 2015; originally announced March 2015.

  27. arXiv:1502.01709  [pdf

    physics.acc-ph

    High power density test of PXIE MEBT absorber prototype

    Authors: A. Shemyakin, C. Baffes

    Abstract: One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a… ▽ More

    Submitted 5 February, 2015; originally announced February 2015.

    Comments: 3 pp. arXiv admin note: text overlap with arXiv:1501.07568

    Report number: FERMILAB-CONF-14-302-AD

  28. arXiv:1502.01703  [pdf

    physics.acc-ph

    Status of the warm front end of PXIE

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, A. Chen, B. Hanna, L. Prost, G. Saewert, V. Scarpine, J. Steimel, D. Sun, D. Li, R. D'Arcy

    Abstract: A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creati… ▽ More

    Submitted 5 February, 2015; originally announced February 2015.

    Comments: 3 pp

    Report number: FERMILAB-CONF-14-301-AD

  29. arXiv:1501.07568  [pdf

    physics.acc-ph

    Testing Results of the Prototype Beam Absorber for the PXIE MEBT

    Authors: Curtis Baffes, Alexander Shemyakin

    Abstract: One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H^{-} bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused ont… ▽ More

    Submitted 29 January, 2015; originally announced January 2015.

    Comments: 3 pp. 5th International Particle Accelerator Conference (IPAC 2014) 16-20 Jun 2014. Dresden, Germany

    Report number: fermilab-conf-14-168-AD

  30. Fermilab 4.3-MeV Electron Cooler

    Authors: Sergei Nagaitsev, Lionel Prost, Alexander Shemyakin

    Abstract: The Recycler Electron Cooler (REC) was the first cooler working at a relativistic energy (gamma = 9.5). It was successfully developed in 1995-2004 and was in operation at Fermilab in 2005-2011, providing cooling of antiprotons in the Recycler ring. After introducing the physics of electron cooling and the REC system, this paper describes measurements carried out to tune the electron beam and optim… ▽ More

    Submitted 25 November, 2014; originally announced November 2014.

    Report number: FERMILAB-PUB-14-486-AD

  31. arXiv:1409.5470  [pdf

    physics.acc-ph

    The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab

    Authors: S. Nagaitsev, S. Holmes, D. Johnson, M. Kaducak, R. Kephart, V. Lebedev, S. Mishra, A. Shemyakin, N. Solyak, R. Stanek, V. Yakovlev, P. Ostroumov, D. Li, P. Singh, M. Pande, S. Malhotra

    Abstract: A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program… ▽ More

    Submitted 18 September, 2014; originally announced September 2014.

    Comments: 4 p. Presented at North American Particle Accelerator Conference (PAC13) Conference

    Report number: FERMILAB-CONF-13-415-AD-APC-TD

  32. arXiv:1306.5022  [pdf

    physics.acc-ph

    Project X: Accelerator Reference Design

    Authors: S. D. Holmes, R. Alber, B. Chase, K. Gollwitzer, D. Johnson, M. Kaducak, A. Klebaner, I. Kourbanis, V. Lebedev, A. Leveling, D. Li, S. Nagaitsev, P. Ostroumov, R. Pasquinelli, J. Patrick, L. Prost, V. Scarpine, A. Shemyakin, N. Solyak, J. Steimel, V. Yakovlev, R. Zwaska

    Abstract: Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator… ▽ More

    Submitted 15 July, 2013; v1 submitted 20 June, 2013; originally announced June 2013.

    Comments: Edited by S. D. Holmes 212 pp. with many figures; prepared in part for the DPF Community Summer Study; v2 corrects typos and conforms with the version being printed

    Report number: FERMILAB-TM-2557; ANL/PHY-13/2; BNL-101116-2013-BC/81834; JLAB-ACP-13-1725; LBNL-6334E; PNNL-22523; UASLP-IF-13-001; SLAC-R-1029

  33. arXiv:1306.3175  [pdf

    physics.acc-ph

    The Recycler Electron Cooler

    Authors: A. Shemyakin, L. R. Prost

    Abstract: The Recycler Electron cooler was the first (and so far, the only) cooler working at a relativistic energy (γ = 9.5). It was successfully developed in 1995-2004 and was in operation at Fermilab in 2005-2011, providing cooling of antiprotons in the Recycler ring. This paper describes the cooler, difficulties in achieving the required electron beam parameters and the ways to overcome them, cooling me… ▽ More

    Submitted 13 June, 2013; originally announced June 2013.

  34. arXiv:1301.7698  [pdf

    physics.acc-ph

    Design of MEBT for the Project X Injector Experiment at Fermilab

    Authors: A. Shemyakin, C. Baffes, A. Chen, Y. Eidelman, B. Hanna, V. Lebedev, S. Nagaitsev, J. -F. Ostiguy, R. Pasquinelli, D. Peterson, L. Prost, G. Saewert, V. Scarpine, B. Shteynas, N. Solyak, D. Sun, M. Wendt, V. Yakovlev, T. Tang

    Abstract: The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert… ▽ More

    Submitted 31 January, 2013; originally announced January 2013.

    Comments: 3 pp

    Report number: FERMILAB-CONF-12-496-AD-APC-TD

  35. arXiv:1301.7344  [pdf

    physics.acc-ph

    PXIE Optics and Layout

    Authors: V. A. Lebedev, S. Nagaitsev, J. -F. Ostiguy, A. V. Shemyakin, B. G. Shteynas, N. Solyak, N. Solyak

    Abstract: The Project X Injector Experiment (PXIE) will serve as a prototype for the Project X front end. The aim is to validate the Project-X design and to decrease technical risks, known to be mainly related to the front end. PXIE will accelerate a 1 mA CW beam to about 25 MeV. It will consist of an ion source, LEBT, CW RFQ, MEBT, two SC cryomodules, a diagnostic section and a beam dump. A bunch-by-bunch… ▽ More

    Submitted 30 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-186-AD

  36. arXiv:1301.7342  [pdf

    physics.acc-ph

    PXIE: Project X Injector Experiment

    Authors: P. N. Ostroumov, S. D. Holmes, R. D. Kephart, J. S. Kerby, V. A. Lebedev, C. S. Mishra, S. Nagaitsev, A. V. Shemyakin, N. Solyak, R. P. Stanek, D. Li

    Abstract: A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. As part of this development program, we are constructing a prototype of the front end of the Project X linac at Fermilab. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element withi… ▽ More

    Submitted 30 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-172-AD

  37. arXiv:1301.6774  [pdf

    physics.acc-ph

    Fermilab PXIE Beam Diagnostics Development and Testing at the HINS Beam Facility

    Authors: V. A. Lebedev, A. V. Shemyakin, J. Steimel, M. Wendt, B. M. Hanna, L. R. Prost, V. E. Scarpine

    Abstract: Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw RFQ and H- source, a broadband bunch-by-bunch beam chopper and a low-energy superconducting linac. The successful characterization and operation of such an acce… ▽ More

    Submitted 28 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-239-AD

  38. arXiv:1301.5649  [pdf

    physics.acc-ph

    Progress with PXIE MEBT Chopper

    Authors: V. Lebedev, A. Chen, R Pasquinelli, D. Peterson, G. Saewert, A. Shemyakin, D. Sun, M. Wendt, T. Tang

    Abstract: A capability to provide a large variety of bunch patterns is crucial for the concept of the Project X serving MW-range beam to several experiments simultaneously. This capability will be realized by the Medium Energy Beam Transport's (MEBT) chop** system that will divert 80% of all bunches of the initially 5mA, 2.1 MeV CW 162.5 MHz beam to an absorber according to a pre-programmed bunch-by-bunch… ▽ More

    Submitted 23 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012. New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-187-AD

  39. arXiv:1301.5618  [pdf

    physics.acc-ph

    Summary of Fermilab's Recycler Electron Cooler Operation and Studies

    Authors: L. R. Prost, A. Shemyakin

    Abstract: Fermilab's Recycler ring was used as a storage ring for accumulation and subsequent manipulations of 8-GeV antiprotons destined for the Tevatron collider. To satisfy these missions, a unique electron cooling system was designed, developed and successfully implemented. The most important features that distinguish the Recycler cooler from other existing electron coolers are its relativistic energy (… ▽ More

    Submitted 23 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012. New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-143-AD

  40. arXiv:1209.2441  [pdf

    physics.acc-ph

    Low-Energy Run of Fermilab Electron Cooler's Beam Generation System

    Authors: L. R. Prost, A. Shemyakin, A. Fedotov, J. Kewisch

    Abstract: In the context of the evaluation of possibly using the Fermilab Electron Cooler for the proposed low-energy RHIC run at BNL, operating the cooler at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main conclusion of this feasibility study is that the cooler's beam generation system is suitable for BNL needs. The beam recirculation was stable for all tested parameter… ▽ More

    Submitted 11 September, 2012; originally announced September 2012.

    Comments: 3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, USA

    Report number: FERMILAB-CONF-11-054-AD

  41. arXiv:1208.3415  [pdf

    physics.acc-ph

    Effect of transverse electron velocities on the longitudinal cooling force in the Fermilab electron cooler

    Authors: Andrei Khilkevich, Lionel R. Prost, Alexander V. Shemyakin

    Abstract: In Fermilab's electron cooler, a 0.1A, 4.3MeV DC electron beam propagates through the 20 m cooling section, which is immersed in a weak longitudinal magnetic field. A proper adjustment of 200 dipole coils, installed in the cooling section for correction of the magnetic field imperfections, can create a helix-like trajectory with the wavelength of 1-10 m. The longitudinal cooling force is measured… ▽ More

    Submitted 16 August, 2012; originally announced August 2012.

    Comments: 3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, USA

    Report number: FERMILAB-CONF-11-076-AD

  42. arXiv:1208.2019  [pdf

    physics.acc-ph

    Transverse instability of the antiproton beam in the Recycler Ring

    Authors: L. R. Prost, C. M. Bhat, A. Burov, J. Crisp, N. Eddy, M. Hu, A. Shemyakin

    Abstract: The brightness of the antiproton beam in Fermilab's 8 GeV Recycler ring is limited by a transverse instability. This instability has occurred during the extraction process to the Tevatron for large stacks of antiprotons even with dampers in operation. This paper describes observed features of the instability, introduces the threshold phase density to characterize the beam stability, and finds the… ▽ More

    Submitted 9 August, 2012; originally announced August 2012.

    Comments: 3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, USA

    Report number: FERMILAB-CONF-11-055-AD

  43. arXiv:1207.5821  [pdf

    physics.acc-ph

    Low-energy run of Fermilab Electron Cooler's beam generation system

    Authors: Lionel Prost, Alexander Shemyakin, Alexei Fedotov, Jorg Kewisch

    Abstract: As a part of a feasibility study of using the Fermilab Electron Cooler for a low-energy Relativistic Heavy Ion Collider (RHIC) run at Brookhaven National Laboratory (BNL), the cooler operation at 1.6 MeV electron beam energy was tested in a short beam line configuration. The main result of the study is that the cooler beam generation system is suitable for BNL needs. In a striking difference with… ▽ More

    Submitted 24 July, 2012; originally announced July 2012.

    Comments: 25 pp

    Report number: FERMILAB-TM-2471-AD

  44. arXiv:1207.3819  [pdf

    physics.acc-ph

    Effect of secondary ions on the electron beam optics in the Recycler Electron Cooler

    Authors: A. Shemyakin, L. Prost, G. Saewert

    Abstract: Antiprotons in Fermilab's Recycler ring are cooled by a 4.3 MeV, 0.1 - 0.5 A DC electron beam (as well as by a stochastic cooling system). The unique combination of the relativistic energy (γ = 9.49), an Ampere - range DC beam, and a relatively weak focusing makes the cooling efficiency particularly sensitive to ion neutralization. A capability to clear ions was recently implemented by way of inte… ▽ More

    Submitted 16 July, 2012; originally announced July 2012.

    Comments: 3 pp. 1st International Particle Accelerator Conference: IPAC'10. 23-28 May 2010. Kyoto, Japan

    Report number: FERMILAB-CONF-10-107-AD

  45. arXiv:1201.4168  [pdf

    physics.acc-ph

    Transverse Instabilities in the FERMILAB Recycler

    Authors: L. R. Prost, A. Burov, A. Shemyakin, C. M. Bhat, J. Crisp, N. Eddy

    Abstract: Transverse instabilities of the antiproton beam have been observed in the Recycler ring soon after its commissioning. After installation of transverse dampers, the threshold for the instability limit increased significantly but the instability is still found to limit the brightness of the antiprotons extracted from the Recycler for Tevatron shots. In this paper, we describe observations of the ins… ▽ More

    Submitted 19 January, 2012; originally announced January 2012.

    Comments: 17 pages, 'Technical' Note, Use of 'internal' jargon and references

    Report number: FERMILAB-TM-2498