-
Final Physics Design of Proton Improvement Plan-II At Fermilab
Authors:
Abhishek Pathak,
Arun Saini,
Eduard Pozdeyev
Abstract:
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice design, specifically targeting collective effects, parametric resonances, and space charge nonlinearities that impact beam stability and emittance control. The str…
▽ More
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice design, specifically targeting collective effects, parametric resonances, and space charge nonlinearities that impact beam stability and emittance control. The strategies implemented effectively mitigate space charge complexities, resulting in significant improvements in beam quality -- evidenced by reduced emittance growth, lower beam halo, decreased loss, and better energy spread management. This comprehensive study is pivotal for the PIP-II project's success, providing valuable insights and approaches for future accelerator designs, especially in managing nonlinearities and enhancing beam dynamics.
△ Less
Submitted 31 May, 2024;
originally announced May 2024.
-
PIII Project Overview and Status
Authors:
R. Stanek,
C. Boffo,
S. Chandrasekaran,
S. Dixon,
E. Harms,
L. Kokoska,
I. Kourbanis,
J. Leibfritz,
O. Napoly,
D. Passarelli,
E. Pozdeyev,
A. Rowe
Abstract:
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superco…
▽ More
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.
△ Less
Submitted 9 November, 2023;
originally announced November 2023.
-
Electron Cloud Measurements in Fermilab Booster
Authors:
S. A. K. Wijethunga,
N. Eddy,
J. Eldred,
C. Y. Tan,
B. Fellenz,
E. Pozdeyev,
R. V. Sharankova
Abstract:
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple t…
▽ More
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns inside the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is important to measure the presence of electron cloud. The presence or apparent absence of the electron cloud was investigated using two different methods: measuring bunch-by-bunch tune shift by changing the bunch train structure at different intensities and propagating a microwave carrier signal through the beampipe and analyzing the phase modulation of the signal. This paper presents the results of the two methods and corresponding simulation results conducted using PyECLOUD software.
△ Less
Submitted 19 July, 2023;
originally announced July 2023.
-
Optimization of Superconducting Linac for Proton Improvement Plan-II (PIP-II)
Authors:
Abhishek Pathak,
Eduard Pozdeyev
Abstract:
PIP-II is an essential upgrade of the Fermilab complex that will enable the worlds most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and support a broad physics program at Fermilab. Ultimately, the PIP-II superconducting linac will be capable of accelerating the $H-$ CW beam to 800 MeV with an average power of 1.6 MW. To operate the linac…
▽ More
PIP-II is an essential upgrade of the Fermilab complex that will enable the worlds most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and support a broad physics program at Fermilab. Ultimately, the PIP-II superconducting linac will be capable of accelerating the $H-$ CW beam to 800 MeV with an average power of 1.6 MW. To operate the linac with such high power, beam losses and beam emittance growth must be tightly controlled. In this paper, we present the results of global optimization of the Linac options towards a robust and efficient physics design for the superconducting section of the PIP-II linac. We also investigate the impact of the nonlinear field of the dipole correctors on the beam quality and derive the requirement on the field quality using statistical analysis. Finally, we assess the need to correct the quadrupole focusing produced by Half Wave, and Single Spoke accelerating cavities. We assess the feasibility of controlling the beam coupling in the machine by changing the polarity of the field of linac focusing solenoids
△ Less
Submitted 6 September, 2022;
originally announced September 2022.
-
An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade
Authors:
D. Neuffer,
S. Belomestnykh,
M. Checchin,
D. Johnson,
S. Posen,
E. Pozdeyev,
V. Pronskikh,
A. Saini,
N. Solyak,
V. Yakovlev
Abstract:
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-…
▽ More
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.
△ Less
Submitted 24 August, 2022;
originally announced August 2022.
-
Electron Cloud Measurements in Fermilab Booster
Authors:
S. A. K. Wijethunga,
J. Eldred,
C. Y. Tan,
E. Pozdeyev
Abstract:
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple tu…
▽ More
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns in the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is essential to discover any existence of an electron cloud. And if it does, its effects on the PIP-II era Booster and its mitigating techniques. As the first step, the presence or absence of the electron cloud was investigated using the clearing bunch technique. This paper presents experimental details and observations of the bunch-by-bunch tune shifts of beams with various bunch train structures at low and high intensities and simulation results conducted using PyECLOUD.
△ Less
Submitted 8 August, 2022;
originally announced August 2022.
-
Versatile Multi-MW Proton Facility with Synchrotron Upgrade of Fermilab Proton Complex
Authors:
J. Eldred,
R. Ainsworth,
Y. Alexahin,
C. Bhat,
S. Chattopadhyay,
P. Derwent,
D. Johnson,
C. Johnstone,
J. Johnstone,
I. Kourbanis,
V. Lebedev,
S. Nagaitsev,
W. Pellico,
E. Pozdeyev,
V. Shiltsev,
M. Syphers,
C. Y. Tan,
A. Valishev,
R. Zwaska
Abstract:
DUNE/LBNF constitutes an international multi-decadal physics program for leading-edge neutrino science and proton decay studies [1] and is expected to serve as the flagship particle experiment based at Fermilab.
DUNE/LBNF constitutes an international multi-decadal physics program for leading-edge neutrino science and proton decay studies [1] and is expected to serve as the flagship particle experiment based at Fermilab.
△ Less
Submitted 16 March, 2022;
originally announced March 2022.
-
An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade: a Snowmass 2021 White Paper
Authors:
S. Belomestnykh,
M. Checchin,
D. Johnson,
D. Neuffer,
H. Padamsee,
S. Posen,
E. Pozdeyev,
V. Pronskikh,
A. Saini,
N. Solyak,
V. Yakovlev
Abstract:
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experime…
▽ More
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experiments. In this white paper, we propose an 8 GeV Linac for that purpose. The Linac consists of an extension of the PIP-II Linac to ~2 GeV using PIP-II 650 MHz SRF cryomodules, followed by a 2 -->8.0 GeV Linac composed of 1300 MHz SRF cryomodules, based upon the LCLS-II cryomodules developed at Fermilab. The 8 GeV Linac will incorporate recent improvements in SRF technology. The research needed to implement this Linac is described.
△ Less
Submitted 2 June, 2023; v1 submitted 9 March, 2022;
originally announced March 2022.
-
An Upgrade Path for the Fermilab Accelerator Complex
Authors:
R. Ainsworth,
J. Dey,
J. Eldred,
R. Harnik,
J. Jarvis,
D. E. Johnson,
I. Kourbanis,
D. Neuffer,
E. Pozdeyev,
M. J. Syphers,
A. Valishev,
V. P. Yakovlev,
R. Zwaska
Abstract:
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further sign…
▽ More
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.
△ Less
Submitted 11 March, 2022; v1 submitted 3 June, 2021;
originally announced June 2021.
-
High-energy high-luminosity electron-ion collider eRHIC
Authors:
Vladimir N. Litvinenko,
Joanne Beebe-Wang,
Sergei Belomestnykh,
Ilan Ben-Zvi,
Michael M. Blaskiewicz,
Rama Calaga,
Xiangyun Chang,
Alexei Fedotov,
David Gassner,
Lee Hammons,
Harald Hahn,
Yue Hao,
** He,
William Jackson,
Animesh Jain,
Elliott C. Johnson,
Dmitry Kayran,
Jrg Kewisch,
Yun Luo,
George Mahler,
Gary McIntyre,
Wuzheng Meng,
Michiko Minty,
Brett Parker,
Alexander Pikin
, et al. (17 additional authors not shown)
Abstract:
In this paper, we describe a future electron-ion collider (EIC), based on the existing Relativistic Heavy Ion Collider (RHIC) hadron facility, with two intersecting superconducting rings, each 3.8 km in circumference. A new ERL accelerator, which provide 5-30 GeV electron beam, will ensure 10^33 to 10^34 cm^-2 s^-1 level luminosity.
In this paper, we describe a future electron-ion collider (EIC), based on the existing Relativistic Heavy Ion Collider (RHIC) hadron facility, with two intersecting superconducting rings, each 3.8 km in circumference. A new ERL accelerator, which provide 5-30 GeV electron beam, will ensure 10^33 to 10^34 cm^-2 s^-1 level luminosity.
△ Less
Submitted 13 September, 2011;
originally announced September 2011.
-
Gluons and the quark sea at high energies: distributions, polarization, tomography
Authors:
D. Boer,
M. Diehl,
R. Milner,
R. Venugopalan,
W. Vogelsang,
A. Accardi,
E. Aschenauer,
M. Burkardt,
R. Ent,
V. Guzey,
D. Hasch,
K. Kumar,
M. A. C. Lamont,
Y. Li,
W. J. Marciano,
C. Marquet,
F. Sabatie,
M. Stratmann,
F. Yuan,
S. Abeyratne,
S. Ahmed,
C. Aidala,
S. Alekhin,
M. Anselmino,
H. Avakian
, et al. (164 additional authors not shown)
Abstract:
This report is based on a ten-week program on "Gluons and the quark sea at high-energies", which took place at the Institute for Nuclear Theory in Seattle in Fall 2010. The principal aim of the program was to develop and sharpen the science case for an Electron-Ion Collider (EIC), a facility that will be able to collide electrons and positrons with polarized protons and with light to heavy nuclei…
▽ More
This report is based on a ten-week program on "Gluons and the quark sea at high-energies", which took place at the Institute for Nuclear Theory in Seattle in Fall 2010. The principal aim of the program was to develop and sharpen the science case for an Electron-Ion Collider (EIC), a facility that will be able to collide electrons and positrons with polarized protons and with light to heavy nuclei at high energies, offering unprecedented possibilities for in-depth studies of quantum chromodynamics. This report is organized around four major themes: i) the spin and flavor structure of the proton, ii) three-dimensional structure of nucleons and nuclei in momentum and configuration space, iii) QCD matter in nuclei, and iv) Electroweak physics and the search for physics beyond the Standard Model. Beginning with an executive summary, the report contains tables of key measurements, chapter overviews for each of the major scientific themes, and detailed individual contributions on various aspects of the scientific opportunities presented by an EIC.
△ Less
Submitted 28 November, 2011; v1 submitted 5 August, 2011;
originally announced August 2011.
-
RHIC Low-Energy Challenges and Plans
Authors:
T. Satogata,
L. Ahrens,
M. Bai,
J. M. Brennan,
D. Bruno,
J. Butler,
A. Drees,
A. Fedotov,
W. Fischer,
M. Harvey,
T. Hayes,
W. Jappe,
R. C. Lee,
W. W. MacKay,
N. Malitsky,
G. Marr,
R. Michnoff,
B. Oerter,
E. Pozdeyev,
T. Roser,
F. Severino,
K. Smith,
S. Tepikian,
N. Tsoupas
Abstract:
There is significant interest in RHIC heavy ion collisions at $\sqrt{s_{NN}}=$5--50 GeV, motivated by a search for the QCD phase transition critical point. The lowest energies for this search are well below the nominal RHIC gold injection collision energy of $\sqrt{s_{NN}}=19.6$ GeV. There are several operations challenges at RHIC in this regime, including longitudinal acceptance, magnet field q…
▽ More
There is significant interest in RHIC heavy ion collisions at $\sqrt{s_{NN}}=$5--50 GeV, motivated by a search for the QCD phase transition critical point. The lowest energies for this search are well below the nominal RHIC gold injection collision energy of $\sqrt{s_{NN}}=19.6$ GeV. There are several operations challenges at RHIC in this regime, including longitudinal acceptance, magnet field quality, lattice control, and luminosity monitoring. We report on the status of work to address these challenges, including results from beam tests of low energy RHIC operations with protons and gold, and potential improvements from different beam cooling scenarios.
△ Less
Submitted 12 October, 2007;
originally announced October 2007.
-
Analysis of a Cyclotron Based 400 MeV/u Driver System for a Radioactive Beam Facility
Authors:
F. Marti,
R. C. York,
H. Blosser,
M. M. Gordon,
D. Gorelov,
T. Grimm,
D. Johnson,
P. Miller,
E. Pozdeyev,
J. Vincent,
X. Wu,
A. Zeller
Abstract:
The creation of intense radioactive beams requires intense and energetic primary beams. A task force analysis of this subject recommended an acceleration system capable of 400 MeV/u uranium at 1 particle uA as an appropriate driver for such a facility. The driver system should be capable of accelerating lighter ions at higher intensity such that a constant final beam power (~100kW) is maintained…
▽ More
The creation of intense radioactive beams requires intense and energetic primary beams. A task force analysis of this subject recommended an acceleration system capable of 400 MeV/u uranium at 1 particle uA as an appropriate driver for such a facility. The driver system should be capable of accelerating lighter ions at higher intensity such that a constant final beam power (~100kW) is maintained. This document is a more detailed follow on to the previous analysis of such a system incorporating a cyclotron. The proposed driver pre-acceleration system consists of an ion source, radio frequency quadrupole, and linac chain capable of producing a final energy of 30 MeV/u and a charge (Q) to mass (A) of Q/A ~1/3. This acceleration system would be followed by a Separated Sector Cyclotron with a final output energy of 400 MeV/u. This system provides a more cost-effective solution in terms of initial capital investment as well as of operation compared to a fully linac system with the same primary beam output parameters.
△ Less
Submitted 20 August, 1999;
originally announced August 1999.