-
Simulation tools, first results and experimental status of the MURAVES experiment
Authors:
Andrea Giammanco,
Yanwen Hong,
Marwa Al Moussawi,
Fabio Ambrosino,
Antonio Anastasio,
Samip Basnet,
Lorenzo Bonechi,
Massimo Bongi,
Diletta Borselli,
Alan Bross,
Antonio Caputo,
Roberto Ciaranfi,
Luigi Cimmino,
Vitaliano Ciulli,
Raffaello D'Alessandro,
Mariaelena D'Errico,
Catalin Frosin,
Flora Giudicepietro,
Sandro Gonzi,
Giovanni Macedonio,
Vincenzo Masone,
Massimo Orazi,
Andrea Paccagnella,
Rosario Peluso,
Anna Pla-Dalmau
, et al. (7 additional authors not shown)
Abstract:
The MUon RAdiography of VESuvius (MURAVES) project aims at the study of Mt. Vesuvius, an active and hazardous volcano near Naples, Italy, with the use of muons freely and abundantly produced by cosmic rays. In particular, the MURAVES experiment intends to perform muographic imaging of the internal structure of the summit of Mt. Vesuvius. The challenging measurement of the rock density distribution…
▽ More
The MUon RAdiography of VESuvius (MURAVES) project aims at the study of Mt. Vesuvius, an active and hazardous volcano near Naples, Italy, with the use of muons freely and abundantly produced by cosmic rays. In particular, the MURAVES experiment intends to perform muographic imaging of the internal structure of the summit of Mt. Vesuvius. The challenging measurement of the rock density distribution in its summit by muography, in conjunction with data from other geophysical techniques, can help model possible eruption dynamics. The MURAVES apparatus consists of an array of three independent and identical muon trackers, with a total sensitive area of 3 square meters. In each tracker, a sequence of 4 XY tracking planes made of plastic scintillators is complemented by a 60 cm thick lead wall inserted between the two downstream planes to improve rejection of background from low energy muons. The apparatus is currently acquiring data. This paper presents preliminary results from the analysis of the first data samples acquired with trackers pointing towards Mt. Vesuvius, including the first relative measurement of the density projection of two flanks of the volcano at three different altitudes; we also present the workflow of the simulation chain of the MURAVES experiment and its ongoing developments.
△ Less
Submitted 19 June, 2024; v1 submitted 22 November, 2023;
originally announced November 2023.
-
The MURAVES experiment: study of the Vesuvius Great Cone with Muon Radiography
Authors:
M. D'Errico,
F. Ambrosino,
A. Anastasio,
S. Basnet,
L. Bonechi,
M. Bongi,
A. Bross,
R. Ciaranfi,
L. Cimmino,
C. Ciulli,
R. D'Alessandro,
A. Giammanco,
F. Giudicepietro,
S. Gonzi,
R. Karnam,
G. Macedonio,
V. Masone,
N. Mori,
M. Moussawi,
M. Orazi,
G. Passeggio,
R. Peluso,
A. Pla-Dalmau,
C. Rendon,
A. Samalan
, et al. (6 additional authors not shown)
Abstract:
The MURAVES experiment aims at the muographic imaging of the internal structure of the summit of Mt. Vesuvius, exploiting muons produced by cosmic rays. Though presently quiescent, the volcano carries a dramatic hazard in its highly populated surroundings. The challenging measurement of the rock density distribution in its summit by muography, in conjunction with data from other geophysical techni…
▽ More
The MURAVES experiment aims at the muographic imaging of the internal structure of the summit of Mt. Vesuvius, exploiting muons produced by cosmic rays. Though presently quiescent, the volcano carries a dramatic hazard in its highly populated surroundings. The challenging measurement of the rock density distribution in its summit by muography, in conjunction with data from other geophysical techniques, can help the modeling of possible eruptive dynamics. The MURAVES apparatus consists of an array of three independent and identical muon trackers, with a total sensitive area of 3 square meters. In each tracker, a sequence of 4 XY tracking planes made of plastic scintillators is complemented by a 60 cm thick lead wall inserted between the two downstream planes to improve rejection of background from low energy muons. The apparatus is currently acquiring data. Preliminary results from the analysis of a first data sample are presented.
△ Less
Submitted 24 February, 2022;
originally announced February 2022.
-
The EU DataGrid Workload Management System: towards the second major release
Authors:
G. Avellino,
S. Barale,
S. Beco,
B. Cantalupo,
D. Colling,
F. Giacomini,
A. Gianelle,
A. Guarise,
A. Krenek,
D. Kouril,
A. Maraschini,
L. Matyska,
M. Mezzadri,
S. Monforte,
M. Mulac,
F. Pacini,
M. Pappalardo,
R. Peluso,
J. Pospisil,
F. Prelz,
E. Ronchieri,
M. Ruda,
L. Salconi,
Z. Salvet,
M. Sgaravatto
, et al. (4 additional authors not shown)
Abstract:
In the first phase of the European DataGrid project, the 'workload management' package (WP1) implemented a working prototype, providing users with an environment allowing to define and submit jobs to the Grid, and able to find and use the ``best'' resources for these jobs. Application users have now been experiencing for about a year now with this first release of the workload management system.…
▽ More
In the first phase of the European DataGrid project, the 'workload management' package (WP1) implemented a working prototype, providing users with an environment allowing to define and submit jobs to the Grid, and able to find and use the ``best'' resources for these jobs. Application users have now been experiencing for about a year now with this first release of the workload management system. The experiences acquired, the feedback received by the user and the need to plug new components implementing new functionalities, triggered an update of the existing architecture. A description of this revised and complemented workload management system is given.
△ Less
Submitted 13 June, 2003;
originally announced June 2003.
-
The first deployment of workload management services on the EU DataGrid Testbed: feedback on design and implementation
Authors:
G. Avellino,
S. Beco,
B. Cantalupo,
F. Pacini,
A. Terracina,
A. Maraschini,
D. Colling,
S. Monforte,
M. Pappalardo,
L. Salconi,
F. Giacomini,
E. Ronchieri,
D. Kouril,
A. Krenek,
L. Matyska,
M. Mulac,
J. Pospisil,
M. Ruda,
Z. Salvet,
J. Sitera,
M. Vocu,
M. Mezzadri,
F. Prelz,
A. Gianelle,
R. Peluso
, et al. (4 additional authors not shown)
Abstract:
Application users have now been experiencing for about a year with the standardized resource brokering services provided by the 'workload management' package of the EU DataGrid project (WP1). Understanding, sha** and pushing the limits of the system has provided valuable feedback on both its design and implementation. A digest of the lessons, and "better practices", that were learned, and that…
▽ More
Application users have now been experiencing for about a year with the standardized resource brokering services provided by the 'workload management' package of the EU DataGrid project (WP1). Understanding, sha** and pushing the limits of the system has provided valuable feedback on both its design and implementation. A digest of the lessons, and "better practices", that were learned, and that were applied towards the second major release of the software, is given.
△ Less
Submitted 31 May, 2003;
originally announced June 2003.