-
Ion Coulomb Crystals in Storage Rings for Quantum Information Science
Authors:
S. Brooks,
K. Brown,
F. Méot,
A. Nomerotski,
S. Peggs,
M. Palmer,
T. Roser,
T. Shaftan,
G. H. Hoffstaetter,
S. Nagaitsev,
J. Lykken,
J. Jarvis,
V. Lebedev,
G. Stancari,
A. Valishev,
A. Taylor,
A. Hurd,
N. Moody,
P. Muggli,
A. Aslam,
S. G. Biedron,
T. Bolin,
S. Sosa Guitron,
C. Gonzalez-Zacarias,
M. Larsson
, et al. (7 additional authors not shown)
Abstract:
Quantum information science is a growing field that promises to take computing into a new age of higher performance and larger scale computing as well as being capable of solving problems classical computers are incapable of solving. The outstanding issue in practical quantum computing today is scaling up the system while maintaining interconnectivity of the qubits and low error rates in qubit ope…
▽ More
Quantum information science is a growing field that promises to take computing into a new age of higher performance and larger scale computing as well as being capable of solving problems classical computers are incapable of solving. The outstanding issue in practical quantum computing today is scaling up the system while maintaining interconnectivity of the qubits and low error rates in qubit operations to be able to implement error correction and fault-tolerant operations. Trapped ion qubits offer long coherence times that allow error correction. However, error correction algorithms require large numbers of qubits to work properly. We can potentially create many thousands (or more) of qubits with long coherence states in a storage ring. For example, a circular radio-frequency quadrupole, which acts as a large circular ion trap and could enable larger scale quantum computing. Such a Storage Ring Quantum Computer (SRQC) would be a scalable and fault tolerant quantum information system, composed of qubits with very long coherence lifetimes. With computing demands potentially outpacing the supply of high-performance systems, quantum computing could bring innovation and scientific advances to particle physics and other DOE supported programs. Increased support of R$\&$D in large scale ion trap quantum computers would allow the timely exploration of this exciting new scalable quantum computer. The R$\&$D program could start immediately at existing facilities and would include the design and construction of a prototype SRQC. We invite feedback from and collaboration with the particle physics and quantum information science communities.
△ Less
Submitted 15 March, 2022; v1 submitted 13 March, 2022;
originally announced March 2022.
-
Measurement of the Per Cavity Energy Recovery Efficiency in the Single Turn CBETA Configuration
Authors:
C. Gulliford,
N. Banerjee,
A. Bartnik,
J. Crittenden,
K. Deitrick,
G. H. Hoffstaetter,
P. Quigley,
K. Smolenski,
J. S. Berg,
R. Michnoff,
S. Peggs,
D. Trbojevic
Abstract:
Prior to establishing operation of the world's first mulit-turn superconducting Energy Recovery Linac, (ERL) the Cornell-BNL Energy Recovery Test Accelerator (CBETA) was configured for one turn energy recovery. In this setup, direct measurement of the beam loading in each of the main linac cavities demonstrated high energy recovery efficiency. Specifically, a total one-turn power balance efficienc…
▽ More
Prior to establishing operation of the world's first mulit-turn superconducting Energy Recovery Linac, (ERL) the Cornell-BNL Energy Recovery Test Accelerator (CBETA) was configured for one turn energy recovery. In this setup, direct measurement of the beam loading in each of the main linac cavities demonstrated high energy recovery efficiency. Specifically, a total one-turn power balance efficiency of 99.4%, with per cavity power balances ranging from 99.2-99.8%, was measured. When accounting for small particle losses occurring in the path length adjustment sections of the return loop, this corresponds to per cavity single particle energy recovery efficiencies ranging from 99.8 to 100.5%. A maximum current of 70 microamps was energy recovered, limited by radiation shielding of the beam stop in its preliminary installation.
△ Less
Submitted 28 October, 2020;
originally announced October 2020.
-
Beam Commissioning Results from the CBETA Fractional Arc Test
Authors:
C. Gulliford,
N. Banerjee,
A. Bartnik,
J. S. Berg,
J. Crittenden,
J. Dobbins,
R. Hulsart,
J. Jones,
D. J. Kelliher,
B. Kuske,
W. Lou,
M. McAteer,
R. Michnoff,
S. Peggs,
P. Quigley,
D. Sagan,
K. Smolenski,
V. Vesherevich,
D. Widger,
G. H. Hoffstaetter,
D. Trbojevic
Abstract:
This work describes first commissioning results from the Cornell Brookhaven Energy Recovery Test Accelerator Fractional Arc Test. These include the recommissioning of the Cornell photo-injector, the first full energy operation of the main linac with beam, as well as commissioning of the lowest energy matching beamline (splitter) and a partial section of the Fixed Field Alternating gradient (FFA) r…
▽ More
This work describes first commissioning results from the Cornell Brookhaven Energy Recovery Test Accelerator Fractional Arc Test. These include the recommissioning of the Cornell photo-injector, the first full energy operation of the main linac with beam, as well as commissioning of the lowest energy matching beamline (splitter) and a partial section of the Fixed Field Alternating gradient (FFA) return loop featuring first production Halbach style permanent magnets. Achieving these tasks required characterization of the injection beam, calibration and phasing of the main linac cavities, demonstration of the required 36 MeV energy gain, and measurement of the splitter line horizontal dispersion and R56 at the nominal 42 MeV. In addition, a procedure for determining the BPM offsets, as well as the tune per cell in the FFA section via scanning the linac energy and inducing betatron oscillations around the periodic orbit in the fractional arc was developed and tested. A detailed comparison of these measurements to simulation is discussed.
△ Less
Submitted 11 February, 2019; v1 submitted 8 February, 2019;
originally announced February 2019.
-
CBETA Design Report, Cornell-BNL ERL Test Accelerator
Authors:
G. H. Hoffstaetter,
D. Trbojevic,
C. Mayes,
N. Banerjee,
J. Barley,
I. Bazarov,
A. Bartnik,
J. S. Berg,
S. Brooks,
D. Burke,
J. Crittenden,
L. Cultrera,
J. Dobbins,
D. Douglas,
B. Dunham,
R. Eichhorn,
S. Full,
F. Furuta,
C. Franck,
R. Gallagher,
M. Ge,
C. Gulliford,
B. Heltsley,
D. Jusic,
R. Kaplan
, et al. (29 additional authors not shown)
Abstract:
This design report describes the construction plans for the world's first multi-pass SRF ERL. It is a 4-pass recirculating linac that recovers the beam's energy by 4 additional, decelerating passes. All beams are returned for deceleration in a single beam pipe with a large-momentum-aperture permanent magnet FFAG optics. Cornell University has been pioneering a new class of accelerators, Energy Rec…
▽ More
This design report describes the construction plans for the world's first multi-pass SRF ERL. It is a 4-pass recirculating linac that recovers the beam's energy by 4 additional, decelerating passes. All beams are returned for deceleration in a single beam pipe with a large-momentum-aperture permanent magnet FFAG optics. Cornell University has been pioneering a new class of accelerators, Energy Recovery Linacs (ERLs), with a new characteristic set of beam parameters. Technology has been prototyped that is essential for any high brightness electron ERL. This includes a DC electron source and an SRF injector Linac with world-record current and normalized brightness in a bunch train, a high-current linac cryomodule, and a high-power beam stop, and several diagnostics tools for high-current and high-brightness beams. All these are now being used to construct a novel one-cryomodule ERL in Cornell's Wilson Lab. Brookhaven National Laboratory (BNL) has designed a multi-turn ERL for eRHIC, where beam is transported more than 20 times around the 4km long RHIC tunnel. The number of transport lines is minimized by using two arcs with strongly-focusing permanent magnets that can control many beams of different energies. A collaboration between BNL and Cornell has been formed to investigate this multi-turn eRHIC ERL design by building a 4-turn, one-cryomodule ERL at Cornell. It also has a return loop built with strongly focusing permanent magnets and is meant to accelerate 40mA beam to 150MeV. This high-brightness beam will have applications beyond accelerator research, in industry, in nuclear physics, and in X-ray science.
△ Less
Submitted 13 June, 2017;
originally announced June 2017.
-
The Cornell-BNL FFAG-ERL Test Accelerator: White Paper
Authors:
Ivan Bazarov,
John Dobbins,
Bruce Dunham,
Georg Hoffstaetter,
Christopher Mayes,
Ritchie Patterson,
David Sagan,
Ilan Ben-Zvi,
Scott Berg,
Michael Blaskiewicz,
Stephen Brooks,
Kevin Brown,
Wolfram Fischer,
Yue Hao,
Wuzheng Meng,
François Méot,
Michiko Minty,
Stephen Peggs,
Vadim Ptitsin,
Thomas Roser,
Peter Thieberger,
Dejan Trbojevic,
Nick Tsoupas
Abstract:
The Cornell-BNL FFAG-ERL Test Accelerator (C$β$) will comprise the first ever Energy Recovery Linac (ERL) based on a Fixed Field Alternating Gradient (FFAG) lattice. In particular, we plan to use a Non Scaling FFAG (NS-FFAG) lattice that is very compact and thus space- and cost- effective, enabling multiple passes of the electron beam in a single recirculation beam line, using the superconducting…
▽ More
The Cornell-BNL FFAG-ERL Test Accelerator (C$β$) will comprise the first ever Energy Recovery Linac (ERL) based on a Fixed Field Alternating Gradient (FFAG) lattice. In particular, we plan to use a Non Scaling FFAG (NS-FFAG) lattice that is very compact and thus space- and cost- effective, enabling multiple passes of the electron beam in a single recirculation beam line, using the superconducting RF (SRF) linac multiple times. The FFAG-ERL moves the cost optimized linac and recirculation lattice to a dramatically better optimum.
The prime accelerator science motivation for C$β$ is proving that the FFAG-ERL concept works. This is an important milestone for the Brookhaven National Laboratory (BNL) plans to build a major Nuclear Physics facility, eRHIC, based on producing 21 GeV electron beams to collide with the RHIC ion beams. A consequence of the C$β$ work would be the availability of significantly better, cost-effective, compact CW high-brightness electron beams for a plethora of scientific investigations and applications, such as X-ray sources, dark-matter and dark-energy searches, and industrial high-power Free-Electron Laser (FEL) applications.
C$β$ brings together the resources and expertise of a large DOE National Laboratory, BNL, and a leading research university, Cornell. C$β$ will be built in an existing building at Cornell, for the most part using components that have been developed under previous R&D programs, including a fully commissioned world-leading photoemission electron injector, a large SRF accelerator module, and a high-power beam stop. The only elements that require design and construction from scratch is the FFAG magnet transport lattice.
This white paper describes a project that promises to propel high-power, high-brightness electron beam science and applications to an exciting new level.
△ Less
Submitted 2 April, 2015;
originally announced April 2015.
-
A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper
Authors:
E. Baussan,
M. Blennow,
M. Bogomilov,
E. Bouquerel,
J. Cederkall,
P. Christiansen,
P. Coloma,
P. Cupial,
H. Danared,
C. Densham,
M. Dracos,
T. Ekelof,
M. Eshraqi,
E. Fernandez Martinez,
G. Gaudiot,
R. Hall-Wilton,
J. -P. Koutchouk,
M. Lindroos,
R. Matev,
D. McGinnis,
M. Mezzetto,
R. Miyamoto,
L. Mosca,
T. Ohlsson,
H. Ohman
, et al. (10 additional authors not shown)
Abstract:
Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseli…
▽ More
Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseline program for the European Spallation Source linac is that it will be fully operational at 5 MW average power by 2022, producing 2 GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron production and 14 pulses/s for neutrino production. Furthermore, because of the high current required in the pulsed neutrino horn, the length of the pulses used for neutrino production needs to be compressed to a few $μ$s with the aid of an accumulator ring. A long baseline experiment using this Super Beam and a megaton underground Water Cherenkov detector located in existing mines 300-600 km from Lund will make it possible to discover leptonic CP violation at 5 $σ$ significance level in up to 50% of the leptonic Dirac CP-violating phase range. This experiment could also determine the neutrino mass hierarchy at a significance level of more than 3 $σ$ if this issue will not already have been settled by other experiments by then. The mass hierarchy performance could be increased by combining the neutrino beam results with those obtained from atmospheric neutrinos detected by the same large volume detector. This detector will also be used to measure the proton lifetime, detect cosmological neutrinos and neutrinos from supernova explosions. Results on the sensitivity to leptonic CP violation and the neutrino mass hierarchy are presented.
△ Less
Submitted 12 November, 2013; v1 submitted 26 September, 2013;
originally announced September 2013.
-
Channeling and Volume Reflection Based Crystal Collimation of Tevatron Circulating Beam Halo (T-980)
Authors:
V. Shiltsev,
G. Annala,
A. Drozhdin,
T. Johnson,
A. Legan,
N. Mokhov,
R. Reilly,
D. Still,
R. Tesarek,
J. Zagel,
S. Peggs,
R. Assmann,
V. Previtali,
W. Scandale,
Y. Chesnokov,
I. Yazynin,
V. Guidi,
Y. Ivanov
Abstract:
The T980 crystal collimation experiment is underway at the Tevatron to determine if this technique could increase 980 GeV beam-halo collimation efficiency at high-energy hadron colliders such as the Tevatron and the LHC. T980 also studies various crystal types and parameters. The setup has been substantially enhanced during the Summer 2009 shutdown by installing a new O-shaped crystal in the horiz…
▽ More
The T980 crystal collimation experiment is underway at the Tevatron to determine if this technique could increase 980 GeV beam-halo collimation efficiency at high-energy hadron colliders such as the Tevatron and the LHC. T980 also studies various crystal types and parameters. The setup has been substantially enhanced during the Summer 2009 shutdown by installing a new O-shaped crystal in the horizontal goniometer, as well as adding a vertical goniometer with two alternating crystals (O-shaped and multi-strip) and additional beam diagnostics. First measurements with the new system are quite encouraging, with channeled and volume-reflected beams observed on the secondary collimators as predicted. Investigation of crystal collimation efficiencies with crystals in volume reflection and channeling modes are described in comparison with an amorphous primary collimator. Results on the system performance are presented for the end-of-store studies and for entire collider stores. The first investigation of colliding beam collimation simultaneously using crystals in both the vertical and horizontal plane has been made in the regime with horizontally channeled and vertically volume-reflected beams. Planning is underway for significant hardware improvements during the FY10 summer shutdown and for dedicated studies during the final year of Tevatron operation and also for a "post-collider beam physics running" period.
△ Less
Submitted 7 February, 2012;
originally announced February 2012.
-
How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites
Authors:
P. Czarapata,
D. Hartill,
S. Myers,
S. Peggs,
N. Phinney,
M. Serio,
N. Toge,
F. Willeke,
C. Zhang
Abstract:
A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms th…
▽ More
A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms that most of these activities are already performed 'remotely'. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.
△ Less
Submitted 26 February, 2002;
originally announced February 2002.
-
Status Report of the Inter-Laboratory Task Force on Remote Operation
Authors:
Paul Czarapata,
Don Hartill,
Steve Myers,
Stephen Peggs,
Nan Phinney,
Mario Serio,
Nobu Toge,
Ferdinand Willeke,
Chuan Zhang
Abstract:
In February 2000, the International Committee for Future Accelerators initiated a study of a new model for international collaboration on a future large accelerator project, the Global Accelerator Network. The study is based on a model of a facility, which is remote from most of the collaborating institutions. It is designed, built and operated by a collaboration of equal partner institutions di…
▽ More
In February 2000, the International Committee for Future Accelerators initiated a study of a new model for international collaboration on a future large accelerator project, the Global Accelerator Network. The study is based on a model of a facility, which is remote from most of the collaborating institutions. It is designed, built and operated by a collaboration of equal partner institutions distributed around the world. According to this model, the expert-staff from each laboratory remains based at their home institution but continues to participate in the operation of the machine after construction. This report summarizes the conclusions of the Task Force on Remote Operation, which investigated the general and technical implications of far-remote operations.
△ Less
Submitted 8 January, 2002;
originally announced January 2002.
-
How to Commission, Operate and Maintain a Large Future Accelerator Complex from Far Remote
Authors:
P. Czarapata,
D. Hartill,
S. Myers,
S. Peggs,
N. Phinney,
M. Serio,
N. Toge,
F. Willeke,
C. Zhang
Abstract:
A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commi-ssioning, machine development, maintenance, trouble shooting and repair. Experience from existing accele-rators confirms…
▽ More
A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commi-ssioning, machine development, maintenance, trouble shooting and repair. Experience from existing accele-rators confirms that most of these activities are already performed 'remotely'. The large high-energy physics ex-periments and astronomy projects, already involve inter-national collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for par-ticularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.
△ Less
Submitted 4 January, 2002; v1 submitted 13 October, 2001;
originally announced October 2001.