LLRF controls in SuperKEKB Phase-1 commissioning
Authors:
T. Kobayashi,
K. Akai,
K. Ebihara,
A. Kabe,
K. Nakanishi,
M. Nishiwaki,
J. Odagiri,
S. Yoshimoto,
K. Hirosawa
Abstract:
First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the desired beam current for Phase-1 was achieved in both rings. This paper summarize the operation results related to low level RF (LLRF) control issues during the Ph…
▽ More
First beam commissioning of SuperKEKB (Phase-1), which is an asymmetry double ring collider of 7-GeV electron and 4-GeV positron beams, which had started from February, has been successfully accomplished at the end of June 2016, and the desired beam current for Phase-1 was achieved in both rings. This paper summarize the operation results related to low level RF (LLRF) control issues during the Phase-1 commissioning, including the system tuning, the coupled bunch instability and the bunch gap transient effect. RF system of SuperKEKB consists of about thirty klystron stations in both rings. Newly developed LLRF control systems were applied to the nine stations among the thirty for Phase-1. The RF reference signal distribution system has been also upgraded for SuperKEKB. These new systems worked well without serious problem and they contributed to smooth progress of the commissioning. The old existing systems, which had been used in the KEKB operation, were still reused for the most stations, and they also worked as soundly as performed in the KEKB operation.
△ Less
Submitted 23 March, 2018;
originally announced March 2018.
Accelerator Control System at KEKB and the Linac
Authors:
Kazuro Furukawa,
Atsuyoshi Akiyama,
Eiichi Kadokura,
Miho Kurashina,
Katsuhiko Mikawa,
Tatsuro Nakamura,
Jun-ichi Odagiri,
Masanori Satoh,
Tsuyoshi Suwada
Abstract:
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a combination of scripting languages at the operation layer and EPICS at the equipment layer. During the project many features were implemented to achieve extreme…
▽ More
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a combination of scripting languages at the operation layer and EPICS at the equipment layer. During the project many features were implemented to achieve extreme performance out of the machine. Especially the online linkage to the accelerator simulation played an essential role. In order to further improve the reliability and flexibility two major concepts were additionally introduced later in the project, namely the channel access everywhere and the dual-tier controls. Based on the improved control system a concept of virtual accelerators were realized that enables the single injector linac serve as three separate injectors to KEKB HER, LER and Photon Factory, respectively. Those control technologies are indispensable for the future particle accelerators.
△ Less
Submitted 28 December, 2012; v1 submitted 25 November, 2012;
originally announced November 2012.