-
On the Benefits And Problems Related to Using Definition of Done -- A Survey Study
Authors:
Sylwia Kopczynska,
Jakub Piechowiak,
Miroslaw Ochodek,
Jerzy Nawrocki
Abstract:
Context: Definition of Done (DoD) is one of the fundamental concepts of Scrum. It expresses a shared view of a Scrum Team on what makes an increment of their product complete. DoDs are often defined as checklists with items being requirements towards software (e.g., quality requirements) or towards activities performed to make the increment shippable (e.g., code reviews, testing). Unfortunately, t…
▽ More
Context: Definition of Done (DoD) is one of the fundamental concepts of Scrum. It expresses a shared view of a Scrum Team on what makes an increment of their product complete. DoDs are often defined as checklists with items being requirements towards software (e.g., quality requirements) or towards activities performed to make the increment shippable (e.g., code reviews, testing). Unfortunately, the knowledge about the usefulness of DoD is still very limited.
Objective: The goal is to study what benefits using the DoD practice can bring to an agile project, what problems it may trigger, and how it is created and maintained.
Method: In the survey among members of agile software development projects, 137 practitioners from all over the globe shared their experience with us.
Results: 93% of the respondents perceive DoD as at least valuable for their ventures. It helps them to make work items complete, assure product quality, and ensure the needed activities are executed. However, they indicated that every second project struggles with infeasible, incorrect, unavailable, or cree** DoD.
Conclusions: It follows from the study that DoD is important but not easy to use and more empirical studies are needed to identify best practices in this area.
△ Less
Submitted 8 August, 2022;
originally announced August 2022.
-
Fibre-optic delivery of time and frequency to VLBI station
Authors:
P. Krehlik,
Ł. Buczek,
J. Kołodziej,
M. Lipiński,
Ł. Śliwczyński,
J. Nawrocki,
P. Nogaś,
A. Marecki,
E. Pazderski,
P. Ablewski,
M. Bober,
R. Ciuryło,
A. Cygan,
D. Lisak,
P. Masłowski,
P. Morzyński,
M. Zawada,
R. M. Campbell,
J. Pieczerak,
A. Binczewski,
K. Turza
Abstract:
The quality of Very Long Baseline Interferometry (VLBI) radio observations predominantly relies on precise and ultra-stable time and frequency (T&F) standards, usually hydrogen masers (HM), maintained locally at each VLBI station. Here, we present an operational solution in which the VLBI observations are routinely carried out without use of a local HM, but using remote synchronization via a stabi…
▽ More
The quality of Very Long Baseline Interferometry (VLBI) radio observations predominantly relies on precise and ultra-stable time and frequency (T&F) standards, usually hydrogen masers (HM), maintained locally at each VLBI station. Here, we present an operational solution in which the VLBI observations are routinely carried out without use of a local HM, but using remote synchronization via a stabilized, long-distance fibre-optic link. The T&F reference signals, traceable to international atomic timescale (TAI), are delivered to the VLBI station from a dedicated timekee** laboratory. Moreover, we describe a proof-of-concept experiment where the VLBI station is synchronized to a remote strontium optical lattice clock during the observation.
△ Less
Submitted 7 July, 2017; v1 submitted 28 March, 2017;
originally announced March 2017.
-
Absolute measurement of the ${}^{1}S_{0}$ - ${}^{3}P_{0}$ clock transition in neutral ${}^{88}$Sr over the 330 km-long stabilized fibre optic link
Authors:
Piotr Morzynski,
Marcin Bober,
Dobroslawa Bartoszek-Bober,
Jerzy Nawrocki,
Przemyslaw Krehlik,
Lukasz Sliwczynski,
Marcin Lipinski,
Piotr Maslowski,
Agata Cygan,
Piotr Dunst,
Michal Garus,
Daniel Lisak,
Jerzy Zachorowski,
Wojciech Gawlik,
Czeslaw Radzewicz,
Roman Ciurylo,
Michal Zawada
Abstract:
We report a stability below $7\times 10{}^{-17}$ of two independent optical lattice clocks operating with bosonic ${}^{88}$Sr isotope. The value (429228066418008.3(1.9)${}_{syst}$(0.9)${}_{stat}$~Hz) of the absolute frequency of the ${}^{1}S_{0}$ - ${}^{3}P_{0}$ transition was measured with an optical frequency comb referenced to the local representation of the UTC by the 330 km-long stabilized fi…
▽ More
We report a stability below $7\times 10{}^{-17}$ of two independent optical lattice clocks operating with bosonic ${}^{88}$Sr isotope. The value (429228066418008.3(1.9)${}_{syst}$(0.9)${}_{stat}$~Hz) of the absolute frequency of the ${}^{1}S_{0}$ - ${}^{3}P_{0}$ transition was measured with an optical frequency comb referenced to the local representation of the UTC by the 330 km-long stabilized fibre optical link. The result was verified by series of measurements on two independent optical lattice clocks and agrees with recommendation of Bureau International des Poids et Mesures.
△ Less
Submitted 7 December, 2015;
originally announced December 2015.