-
Design of Muon Campus full flow purifier for varying operational conditions and horizontal ship**
Authors:
J. Subedi,
T. Tope,
B. Hansen,
Y. Jia,
J. Makara,
J. Tillman,
Z. Tang
Abstract:
Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 60 g/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 240 g/s of Helium throughput of 4 compressors through charcoal bed at 80 K…
▽ More
Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 60 g/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 240 g/s of Helium throughput of 4 compressors through charcoal bed at 80 K and returns ambient Helium back to the system. The purifier is designed to be operated near liquid Nitrogen temperature during cold operations and up to 400 K during regeneration. Both warm and cold operational range of the purifier has required use of appropriate clearances in design due to expansion and contraction. The vessel of around 16 ft height which is designed to be operated vertically is to be shipped horizontally. The asymmetrical position of heavy stainless steel heat exchanger in the purifier support frame and 5g vertical load design consideration for ship** has required use of ship** supports and heat exchanger rotational stops to comply with design requirements. FEA of purifier system is performed in cold, warm and ship** cases to verify that the purifier satisfies the design requirements.
△ Less
Submitted 29 August, 2023;
originally announced August 2023.
-
Nitrogen Precooling Heat Exchanger replacement and control system upgrade in Superfluid Cryoplant at CMTF
Authors:
J. Subedi,
B. Hansen,
M. White,
V. Patel,
J. Makara,
O. Atassi,
G. Johnson
Abstract:
Liquid Nitrogen precooling is used in most Cryoplants to achieve cooldown to 80 K temperature range. In one such system at Fermilab's CMTF Superfluid Cryoplant, where the Helium supply directly exchanges heat with liquid Nitrogen, freezing of Nitrogen occurred inside the heat exchanger due to heat exchanger imbalance during a Cryoplant trip. Trapped vapor pockets of N2 within the frozen heat excha…
▽ More
Liquid Nitrogen precooling is used in most Cryoplants to achieve cooldown to 80 K temperature range. In one such system at Fermilab's CMTF Superfluid Cryoplant, where the Helium supply directly exchanges heat with liquid Nitrogen, freezing of Nitrogen occurred inside the heat exchanger due to heat exchanger imbalance during a Cryoplant trip. Trapped vapor pockets of N2 within the frozen heat exchanger channels were formed while warming up the heat exchanger, creating high localized pressure and subsequent damage/rupture of the heat exchanger. Replacement of the heat exchanger was done, and modifications were made in the system to rectify future occurrences. The control system was updated to bypass the heat exchanger entirely if the incoming Helium stream temperature drops below 76 K. This was done by repurposing two control valves as heat exchanger bypass valves that were previously used for a redundant 80 K adsorber in the coldbox. Additional modifications were made to further prevent return of large amount of cold Helium gas from cold end during abrupt Cryoplant shutdown. This modification has ensured high reliability of heat exchanger with prevention of freezing of Nitrogen which can damage the heat exchanger.
△ Less
Submitted 29 August, 2023;
originally announced August 2023.
-
Installation, commissioning, and testing of the HB650 CM at PIP2IT
Authors:
M White,
J Makara,
S Ranpariya,
L Pei,
M Barba,
J Subedi,
J Dong,
B Hansen,
A E T Akintola,
J Holzbauer,
J Ozelis,
S Chandrasekaran,
V Roger
Abstract:
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand fo…
▽ More
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab's Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.
△ Less
Submitted 21 August, 2023;
originally announced August 2023.
-
LCLS-II and HE Cryomodule Microphonics at CMTF in Fermilab*
Authors:
C. Contreras-Martinez,
E. Harms,
C. Cravatta,
J. Holzbauer,
S. Posen,
L. Doolittle,
B. Chase,
J. Einstein-Curtis,
J. Makara,
R. Wang
Abstract:
Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data c…
▽ More
Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data capture taken was 30 minutes or longer and sampled at 1 kHz.
△ Less
Submitted 12 August, 2022;
originally announced August 2022.
-
LCLS-II-HE verification cryomodule high gradient performance and quench behavior
Authors:
S. Posen,
A. Cravatta,
M. Checchin,
S. Aderhold,
C. Adolphsen,
T. Arkan,
D. Bafia,
A. Benwell,
D. Bice,
B. Chase,
C. Contreras-Martinez,
L. Dootlittle,
J. Fuerst,
D. Gonnella,
A. Grassellino,
C. Grimm,
B. Hansen,
E. Harms,
B. Hartsell,
G. Hays,
J. Holzbauer,
S. Hoobler,
J. Kaluzny,
T. Khabiboulline,
M. Kucera
, et al. (21 additional authors not shown)
Abstract:
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipac…
▽ More
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.
△ Less
Submitted 27 October, 2021;
originally announced October 2021.