-
Quality Control of Mass-Produced GEM Detectors for the CMS GE1/1 Muon Upgrade
Authors:
M. Abbas,
M. Abbrescia,
H. Abdalla,
A. Abdelalim,
S. AbuZeid,
A. Agapitos,
A. Ahmad,
A. Ahmed,
W. Ahmed,
C. Aimè,
C. Aruta,
I. Asghar,
P. Aspell,
C. Avila,
J. Babbar,
Y. Ban,
R. Band,
S. Bansal,
L. Benussi,
T. Beyrouthy,
V. Bhatnagar,
M. Bianco,
S. Bianco,
K. Black,
L. Borgonovi
, et al. (157 additional authors not shown)
Abstract:
The series of upgrades to the Large Hadron Collider, culminating in the High Luminosity Large Hadron Collider, will enable a significant expansion of the physics program of the CMS experiment. However, the accelerator upgrades will also make the experimental conditions more challenging, with implications for detector operations, triggering, and data analysis. The luminosity of the proton-proton co…
▽ More
The series of upgrades to the Large Hadron Collider, culminating in the High Luminosity Large Hadron Collider, will enable a significant expansion of the physics program of the CMS experiment. However, the accelerator upgrades will also make the experimental conditions more challenging, with implications for detector operations, triggering, and data analysis. The luminosity of the proton-proton collisions is expected to exceed $2-3\times10^{34}$~cm$^{-2}$s$^{-1}$ for Run 3 (starting in 2022), and it will be at least $5\times10^{34}$~cm$^{-2}$s$^{-1}$ when the High Luminosity Large Hadron Collider is completed for Run 4. These conditions will affect muon triggering, identification, and measurement, which are critical capabilities of the experiment. To address these challenges, additional muon detectors are being installed in the CMS endcaps, based on Gas Electron Multiplier technology. For this purpose, 161 large triple-Gas Electron Multiplier detectors have been constructed and tested. Installation of these devices began in 2019 with the GE1/1 station and will be followed by two additional stations, GE2/1 and ME0, to be installed in 2023 and 2026, respectively. The assembly and quality control of the GE1/1 detectors were distributed across several production sites around the world. We motivate and discuss the quality control procedures that were developed to standardize the performance of the detectors, and we present the final results of the production. Out of 161 detectors produced, 156 detectors passed all tests, and 144 detectors are now installed in the CMS experiment. The various visual inspections, gas tightness tests, intrinsic noise rate characterizations, and effective gas gain and response uniformity tests allowed the project to achieve this high success rate.
△ Less
Submitted 22 March, 2022;
originally announced March 2022.
-
Performance of a Triple-GEM Demonstrator in $pp$ Collisions at the CMS Detector
Authors:
M. Abbas,
M. Abbrescia,
H. Abdalla,
A. Abdelalim,
S. AbuZeid,
A. Agapitos,
A. Ahmad,
A. Ahmed,
W. Ahmed,
C. Aimè,
C. Aruta,
I. Asghar,
P. Aspell,
C. Avila,
J. Babbar,
Y. Ban,
R. Band,
S. Bansal,
L. Benussi,
V. Bhatnagar,
M. Bianco,
S. Bianco,
K. Black,
L. Borgonovi,
O. Bouhali
, et al. (156 additional authors not shown)
Abstract:
After the Phase-2 high-luminosity upgrade to the Large Hadron Collider (LHC), the collision rate and therefore the background rate will significantly increase, particularly in the high $η$ region. To improve both the tracking and triggering of muons, the Compact Muon Solenoid (CMS) Collaboration plans to install triple-layer Gas Electron Multiplier (GEM) detectors in the CMS muon endcaps. Demonstr…
▽ More
After the Phase-2 high-luminosity upgrade to the Large Hadron Collider (LHC), the collision rate and therefore the background rate will significantly increase, particularly in the high $η$ region. To improve both the tracking and triggering of muons, the Compact Muon Solenoid (CMS) Collaboration plans to install triple-layer Gas Electron Multiplier (GEM) detectors in the CMS muon endcaps. Demonstrator GEM detectors were installed in CMS during 2017 to gain operational experience and perform a preliminary investigation of detector performance. We present the results of triple-GEM detector performance studies performed in situ during normal CMS and LHC operations in 2018. The distribution of cluster size and the efficiency to reconstruct high $p_T$ muons in proton--proton collisions are presented as well as the measurement of the environmental background rate to produce hits in the GEM detector.
△ Less
Submitted 22 September, 2021; v1 submitted 20 July, 2021;
originally announced July 2021.
-
Modeling the triple-GEM detector response to background particles for the CMS Experiment
Authors:
M. Abbas,
M. Abbrescia,
H. Abdalla,
A. Abdelalim,
S. AbuZeid,
A. Agapitos,
A. Ahmad,
A. Ahmed,
W. Ahmed,
C. Aimè,
C. Aruta,
I. Asghar,
P. Aspell,
C. Avila,
I. Azhgirey,
J. Babbar,
Y. Ban,
R. Band,
S. Bansal,
L. Benussi,
V. Bhatnagar,
M. Bianco,
S. Bianco,
K. Black,
L. Borgonovi
, et al. (164 additional authors not shown)
Abstract:
An estimate of environmental background hit rate on triple-GEM chambers is performed using Monte Carlo (MC) simulation and compared to data taken by test chambers installed in the CMS experiment (GE1/1) during Run-2 at the Large Hadron Collider (LHC). The hit rate is measured using data collected with proton-proton collisions at 13 TeV and a luminosity of 1.5$\times10^{34}$ cm$^{-2}$ s$^{-1}$. The…
▽ More
An estimate of environmental background hit rate on triple-GEM chambers is performed using Monte Carlo (MC) simulation and compared to data taken by test chambers installed in the CMS experiment (GE1/1) during Run-2 at the Large Hadron Collider (LHC). The hit rate is measured using data collected with proton-proton collisions at 13 TeV and a luminosity of 1.5$\times10^{34}$ cm$^{-2}$ s$^{-1}$. The simulation framework uses a combination of the FLUKA and Geant4 packages to obtain the hit rate. FLUKA provides the radiation environment around the GE1/1 chambers, which is comprised of the particle flux with momentum direction and energy spectra ranging from $10^{-11}$ to $10^{4}$ MeV for neutrons, $10^{-3}$ to $10^{4}$ MeV for $γ$'s, $10^{-2}$ to $10^{4}$ MeV for $e^{\pm}$, and $10^{-1}$ to $10^{4}$ MeV for charged hadrons. Geant4 provides an estimate of detector response (sensitivity) based on an accurate description of detector geometry, material composition and interaction of particles with the various detector layers. The MC simulated hit rate is estimated as a function of the perpendicular distance from the beam line and agrees with data within the assigned uncertainties of 10-14.5%. This simulation framework can be used to obtain a reliable estimate of background rates expected at the High Luminosity LHC.
△ Less
Submitted 8 July, 2021;
originally announced July 2021.
-
Interstrip Capacitances of the Readout Board used in Large Triple-GEM Detectors for the CMS Muon Upgrade
Authors:
M. Abbas,
M. Abbrescia,
H. Abdalla,
A. Abdelalim,
S. AbuZeid,
A. Agapitos,
A. Ahmad,
A. Ahmed,
W. Ahmed,
C. Aimè,
C. Aruta,
I. Asghar,
P. Aspell,
C. Avila,
J. Babbar,
Y. Ban,
R. Band,
S. Bansal,
L. Benussi,
V. Bhatnagar,
M. Bianco,
S. Bianco,
K. Black,
L. Borgonovi,
O. Bouhali
, et al. (156 additional authors not shown)
Abstract:
We present analytical calculations, Finite Element Analysis modeling, and physical measurements of the interstrip capacitances for different potential strip geometries and dimensions of the readout boards for the GE2/1 triple-Gas Electron Multiplier detector in the CMS muon system upgrade. The main goal of the study is to find configurations that minimize the interstrip capacitances and consequent…
▽ More
We present analytical calculations, Finite Element Analysis modeling, and physical measurements of the interstrip capacitances for different potential strip geometries and dimensions of the readout boards for the GE2/1 triple-Gas Electron Multiplier detector in the CMS muon system upgrade. The main goal of the study is to find configurations that minimize the interstrip capacitances and consequently maximize the signal-to-noise ratio for the detector. We find agreement at the 1.5--4.8% level between the two methods of calculations and on the average at the 17% level between calculations and measurements. A configuration with halved strip lengths and doubled strip widths results in a measured 27--29% reduction over the original configuration while leaving the total number of strips unchanged. We have now adopted this design modification for all eight module types of the GE2/1 detector and will produce the final detector with this new strip design.
△ Less
Submitted 20 September, 2020;
originally announced September 2020.
-
Performances of a resistive MicroMegas module for the Time Projection Chambers of the T2K Near Detector upgrade
Authors:
D. Attie,
M. Batkiewicz-Kwasniak,
J. Boix,
S. Bolognesi,
S. Bordoni,
D. Calvet,
M. G. Catanesi,
M. Cicerchia,
G. Cogo,
P. Colas,
G. Collazuol,
A. Dabrowska,
A. Delbart,
J. Dumarchez,
S. Emery-Schrenk,
C. Giganti,
F. Gramegna,
M. Guigue,
P. Hamacher-Baumann,
F. Iacob,
C. Jesus-Valls,
U. Kosed,
R. Kurjataj,
N. Lacalamita,
M. Lamoureux
, et al. (31 additional authors not shown)
Abstract:
An upgrade of the Near Detector of the T2K long baseline neutrino oscillation experiment, ND280, has been proposed. This upgrade will include two new Time Projection Chambers, each equipped with 16 resistive MicroMegas modules for gas amplification. A first prototype of resistive MicroMegas has been designed, built, installed in the HARP field cage, and exposed to a beam of charged particles at CE…
▽ More
An upgrade of the Near Detector of the T2K long baseline neutrino oscillation experiment, ND280, has been proposed. This upgrade will include two new Time Projection Chambers, each equipped with 16 resistive MicroMegas modules for gas amplification. A first prototype of resistive MicroMegas has been designed, built, installed in the HARP field cage, and exposed to a beam of charged particles at CERN. The data have been used to characterize the performances of the resistive MicroMegas module. A spatial resolution of 300 $μm$ and a deposited energy resolution of 9% were observed for horizontal electrons crossing the TPCs at 30 cm from the anode. Such performances fully satisfy the requirements for the upgrade of the ND280 TPC.
△ Less
Submitted 9 December, 2019; v1 submitted 16 July, 2019;
originally announced July 2019.
-
Status of the Cylindical-GEM project for the KLOE-2 Inner Tracker
Authors:
A. Balla,
G. Bencivenni,
S. Cerioni,
P. Ciambrone,
E. De Lucia,
G. De Robertis,
D. Domenici,
G. Felici,
M. Gatta,
M. Jacewicz,
N. Lacalamita,
S. Lauciani,
R. Liuzzi,
F. Loddo,
M. Mongelli,
G. Morello,
A. Pelosi,
M. Pistilli,
L. Quintieri,
A. Ranieri,
V. Valentino
Abstract:
The status of the R&D on the Cylindrical-GEM (CGEM) detector foreseen as Inner Tracker for KLOE-2, the upgrade of the KLOE experiment at the DAFNE phi-factory, will be presented. The R&D includes several activities: i) the construction and complete characterization of the full-size CGEM prototype, equipped with 650 microns pitch 1-D longitudinal strips; ii) the study of the 2-D readout with XV pat…
▽ More
The status of the R&D on the Cylindrical-GEM (CGEM) detector foreseen as Inner Tracker for KLOE-2, the upgrade of the KLOE experiment at the DAFNE phi-factory, will be presented. The R&D includes several activities: i) the construction and complete characterization of the full-size CGEM prototype, equipped with 650 microns pitch 1-D longitudinal strips; ii) the study of the 2-D readout with XV patterned strips and operation in magnetic field (up to 1.5T), performed with small planar prototypes in a dedicated test at the H4-SPS beam facility; iii) the characterization of the single-mask GEM technology for the realization of large-area GEM foils.
△ Less
Submitted 19 March, 2010;
originally announced March 2010.
-
Technical Design Report of the Inner Tracker for the KLOE-2 experiment
Authors:
KLOE-2 Collaboration,
:,
F. Archilli,
D. Badoni,
D. Babusci,
G. Bencivenni,
C. Bini,
C. Bloise,
V. Bocci,
F. Bossi,
P. Branchini,
A. Budano,
S. A. Bulychjev,
P. Campana,
G. Capon,
F. Ceradini,
P. Ciambrone,
E. Czerwinski,
E. Danè,
E. De Lucia,
G. De Robertis,
A. De Santis,
G. De Zorzi,
A. Di Domenico,
C. Di Donato
, et al. (59 additional authors not shown)
Abstract:
The technical design report of the Inner Tracker for the KLOE-2 experiment is presented
The technical design report of the Inner Tracker for the KLOE-2 experiment is presented
△ Less
Submitted 12 February, 2010;
originally announced February 2010.