-
Beam Dynamics Issues in the SuperKEKB
Authors:
Demin Zhou,
Haruyo Koiso,
Akio Morita,
Kazuhito Ohmi,
Katsunobu Oide,
Hiroshi Sugimoto
Abstract:
This article reviews the beam dynamics issues, such as intra-beam scattering, beam-beam interaction, lattice nonlinearity, and space charge, in SuperKEKB before its commissioning.
This article reviews the beam dynamics issues, such as intra-beam scattering, beam-beam interaction, lattice nonlinearity, and space charge, in SuperKEKB before its commissioning.
△ Less
Submitted 13 January, 2024;
originally announced January 2024.
-
SuperKEKB Collider
Authors:
Kazunori Akai,
Kazuro Furukawa,
Haruyo Koiso
Abstract:
SuperKEKB, a 7 GeV electron - 4 GeV positron double-ring collider, is constructed by upgrading KEKB in order to seek new physics beyond the Standard Model. The design luminosity of SuperKEKB is 8 x 10^35 /cm^2 /s - 40 times higher than that achieved by KEKB. The greater part of the gain comes from significantly decreasing the beam sizes at the interaction point based on the nanobeam collision sche…
▽ More
SuperKEKB, a 7 GeV electron - 4 GeV positron double-ring collider, is constructed by upgrading KEKB in order to seek new physics beyond the Standard Model. The design luminosity of SuperKEKB is 8 x 10^35 /cm^2 /s - 40 times higher than that achieved by KEKB. The greater part of the gain comes from significantly decreasing the beam sizes at the interaction point based on the nanobeam collision scheme; the design beam currents in both rings are double those achieved in KEKB. Large-scale construction to upgrade both the collider rings and the injector was conducted, and beam commissioning without the Belle II detector and final-focus magnets was successfully carried out from February to June in 2016. Subsequently, renovation of the interaction region, including the installation of the final-focus magnets and Belle II, and construction in the final stage of a new positron dam** ring were conducted. Having completed the interaction region, beam collision tuning is scheduled from March till July in 2018. This paper reviews the design, construction, and beam commissioning of SuperKEKB.
△ Less
Submitted 10 September, 2018; v1 submitted 6 September, 2018;
originally announced September 2018.
-
The Physics of the B Factories
Authors:
A. J. Bevan,
B. Golob,
Th. Mannel,
S. Prell,
B. D. Yabsley,
K. Abe,
H. Aihara,
F. Anulli,
N. Arnaud,
T. Aushev,
M. Beneke,
J. Beringer,
F. Bianchi,
I. I. Bigi,
M. Bona,
N. Brambilla,
J. B rodzicka,
P. Chang,
M. J. Charles,
C. H. Cheng,
H. -Y. Cheng,
R. Chistov,
P. Colangelo,
J. P. Coleman,
A. Drutskoy
, et al. (2009 additional authors not shown)
Abstract:
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary…
▽ More
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary version of the Physics of the B Factories book. This uses the notation alpha, beta, gamma for the angles of the Unitarity Triangle. The nominal version uses the notation phi_1, phi_2 and phi_3. Please cite this work as Eur. Phys. J. C74 (2014) 3026.
△ Less
Submitted 31 October, 2015; v1 submitted 24 June, 2014;
originally announced June 2014.
-
First Look at the Physics Case of TLEP
Authors:
M. Bicer,
H. Duran Yildiz,
I. Yildiz,
G. Coignet,
M. Delmastro,
T. Alexopoulos,
C. Grojean,
S. Antusch,
T. Sen,
H. -J. He,
K. Potamianos,
S. Haug,
A. Moreno,
A. Heister,
V. Sanz,
G. Gomez-Ceballos,
M. Klute,
M. Zanetti,
L. -T. Wang,
M. Dam,
C. Boehm,
N. Glover,
F. Krauss,
A. Lenz,
M. Syphers
, et al. (106 additional authors not shown)
Abstract:
The discovery by the ATLAS and CMS experiments of a new boson with mass around 125 GeV and with measured properties compatible with those of a Standard-Model Higgs boson, coupled with the absence of discoveries of phenomena beyond the Standard Model at the TeV scale, has triggered interest in ideas for future Higgs factories. A new circular e+e- collider hosted in a 80 to 100 km tunnel, TLEP, is a…
▽ More
The discovery by the ATLAS and CMS experiments of a new boson with mass around 125 GeV and with measured properties compatible with those of a Standard-Model Higgs boson, coupled with the absence of discoveries of phenomena beyond the Standard Model at the TeV scale, has triggered interest in ideas for future Higgs factories. A new circular e+e- collider hosted in a 80 to 100 km tunnel, TLEP, is among the most attractive solutions proposed so far. It has a clean experimental environment, produces high luminosity for top-quark, Higgs boson, W and Z studies, accommodates multiple detectors, and can reach energies up to the t-tbar threshold and beyond. It will enable measurements of the Higgs boson properties and of Electroweak Symmetry-Breaking (EWSB) parameters with unequalled precision, offering exploration of physics beyond the Standard Model in the multi-TeV range. Moreover, being the natural precursor of the VHE-LHC, a 100 TeV hadron machine in the same tunnel, it builds up a long-term vision for particle physics. Altogether, the combination of TLEP and the VHE-LHC offers, for a great cost effectiveness, the best precision and the best search reach of all options presently on the market. This paper presents a first appraisal of the salient features of the TLEP physics potential, to serve as a baseline for a more extensive design study.
△ Less
Submitted 11 December, 2013; v1 submitted 28 August, 2013;
originally announced August 2013.
-
Belle II Technical Design Report
Authors:
T. Abe,
I. Adachi,
K. Adamczyk,
S. Ahn,
H. Aihara,
K. Akai,
M. Aloi,
L. Andricek,
K. Aoki,
Y. Arai,
A. Arefiev,
K. Arinstein,
Y. Arita,
D. M. Asner,
V. Aulchenko,
T. Aushev,
T. Aziz,
A. M. Bakich,
V. Balagura,
Y. Ban,
E. Barberio,
T. Barvich,
K. Belous,
T. Bergauer,
V. Bhardwaj
, et al. (387 additional authors not shown)
Abstract:
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been pr…
▽ More
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.
△ Less
Submitted 1 November, 2010;
originally announced November 2010.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.
-
Negative Momentum Compaction at KEKB
Authors:
H. Ikeda,
J. W. Flanagan,
H. Fukuma,
S. Hiramatsu,
T. Ieiri,
H. Koiso,
T. Mimashi,
T. Mitsuhashi
Abstract:
KEKB is a high luminosity e+e- collider for studying B mesons and has achieved the design luminosity of 1034cm-2s-1 in 2003. In order to get higher luminosity, we tested negative momentum compaction optics in the summer of 2003. We measured the bunch length using three methods at 0.7mA to 1.17mA bunch current and confirmed the length was shortened with the negative momentum compaction optics.
KEKB is a high luminosity e+e- collider for studying B mesons and has achieved the design luminosity of 1034cm-2s-1 in 2003. In order to get higher luminosity, we tested negative momentum compaction optics in the summer of 2003. We measured the bunch length using three methods at 0.7mA to 1.17mA bunch current and confirmed the length was shortened with the negative momentum compaction optics.
△ Less
Submitted 28 January, 2004;
originally announced January 2004.