-
Integrating the PanDA Workload Management System with the Vera C. Rubin Observatory
Authors:
Edward Karavakis,
Wen Guan,
Zhaoyu Yang,
Tadashi Maeno,
Torre Wenaus,
Jennifer Adelman-McCarthy,
Fernando Barreiro Megino,
Kaushik De,
Richard Dubois,
Michelle Gower,
Tim Jenness,
Alexei Klimentov,
Tatiana Korchuganova,
Mikolaj Kowalik,
Fa-Hui Lin,
Paul Nilsson,
Sergey Padolski,
Wei Yang,
Shuwei Ye
Abstract:
The Vera C. Rubin Observatory will produce an unprecedented astronomical data set for studies of the deep and dynamic universe. Its Legacy Survey of Space and Time (LSST) will image the entire southern sky every three to four days and produce tens of petabytes of raw image data and associated calibration data over the course of the experiment's run. More than 20 terabytes of data must be stored ev…
▽ More
The Vera C. Rubin Observatory will produce an unprecedented astronomical data set for studies of the deep and dynamic universe. Its Legacy Survey of Space and Time (LSST) will image the entire southern sky every three to four days and produce tens of petabytes of raw image data and associated calibration data over the course of the experiment's run. More than 20 terabytes of data must be stored every night, and annual campaigns to reprocess the entire dataset since the beginning of the survey will be conducted over ten years. The Production and Distributed Analysis (PanDA) system was evaluated by the Rubin Observatory Data Management team and selected to serve the Observatory's needs due to its demonstrated scalability and flexibility over the years, for its Directed Acyclic Graph (DAG) support, its support for multi-site processing, and its highly scalable complex workflows via the intelligent Data Delivery Service (iDDS). PanDA is also being evaluated for prompt processing where data must be processed within 60 seconds after image capture. This paper will briefly describe the Rubin Data Management system and its Data Facilities (DFs). Finally, it will describe in depth the work performed in order to integrate the PanDA system with the Rubin Observatory to be able to run the Rubin Science Pipelines using PanDA.
△ Less
Submitted 8 December, 2023;
originally announced December 2023.
-
Overview of the distributed image processing infrastructure to produce the Legacy Survey of Space and Time
Authors:
Fabio Hernandez,
George Beckett,
Peter Clark,
Matt Doidge,
Tim Jenness,
Edward Karavakis,
Quentin Le Boulc'h,
Peter Love,
Gabriele Mainetti,
Timothy Noble,
Brandon White,
Wei Yang
Abstract:
The Vera C. Rubin Observatory is preparing to execute the most ambitious astronomical survey ever attempted, the Legacy Survey of Space and Time (LSST). Currently the final phase of construction is under way in the Chilean Andes, with the Observatory's ten-year science mission scheduled to begin in 2025. Rubin's 8.4-meter telescope will nightly scan the southern hemisphere collecting imagery in th…
▽ More
The Vera C. Rubin Observatory is preparing to execute the most ambitious astronomical survey ever attempted, the Legacy Survey of Space and Time (LSST). Currently the final phase of construction is under way in the Chilean Andes, with the Observatory's ten-year science mission scheduled to begin in 2025. Rubin's 8.4-meter telescope will nightly scan the southern hemisphere collecting imagery in the wavelength range 320-1050 nm covering the entire observable sky every 4 nights using a 3.2 gigapixel camera, the largest imaging device ever built for astronomy. Automated detection and classification of celestial objects will be performed by sophisticated algorithms on high-resolution images to progressively produce an astronomical catalog eventually composed of 20 billion galaxies and 17 billion stars and their associated physical properties.
In this article we present an overview of the system currently being constructed to perform data distribution as well as the annual campaigns which reprocess the entire image dataset collected since the beginning of the survey. These processing campaigns will utilize computing and storage resources provided by three Rubin data facilities (one in the US and two in Europe). Each year a Data Release will be produced and disseminated to science collaborations for use in studies comprising four main science pillars: probing dark matter and dark energy, taking inventory of solar system objects, exploring the transient optical sky and map** the Milky Way.
Also presented is the method by which we leverage some of the common tools and best practices used for management of large-scale distributed data processing projects in the high energy physics and astronomy communities. We also demonstrate how these tools and practices are utilized within the Rubin project in order to overcome the specific challenges faced by the Observatory.
△ Less
Submitted 23 November, 2023;
originally announced November 2023.
-
Convolutional LSTM models to estimate network traffic
Authors:
Joanna Waczynska,
Edoardo Martelli,
Sofia Vallecorsa,
Edward Karavakis,
TonyCass
Abstract:
Network utilisation efficiency can, at least in principle, often be improved by dynamically re-configuring routing policies to better distribute on-going large data transfers. Unfortunately, the information necessary to decide on an appropriate reconfiguration - details of on-going and upcoming data transfers such as their source and destination and, most importantly, their volume and duration - i…
▽ More
Network utilisation efficiency can, at least in principle, often be improved by dynamically re-configuring routing policies to better distribute on-going large data transfers. Unfortunately, the information necessary to decide on an appropriate reconfiguration - details of on-going and upcoming data transfers such as their source and destination and, most importantly, their volume and duration - is usually lacking. Fortunately, the increased use of scheduled transfer services, such as FTS, makes it possible to collect the necessary information. However, the mere detection and characterisation of larger transfers is not sufficient to predict with confidence the likelihood a network link will become overloaded. In this paper we present the use of LSTM-based models (CNN-LSTM and Conv-LSTM) to effectively estimate future network traffic and so provide a solid basis for formulating a sensible network configuration plan.
△ Less
Submitted 6 July, 2021;
originally announced July 2021.
-
Dashboard Task Monitor for Managing ATLAS User Analysis on the Grid
Authors:
L Sargsyan,
J Andreeva,
M Jha,
E Karavakis,
L Kokoszkiewicz,
P Saiz,
J Schovancova,
D Tuckett
Abstract:
The organization of the distributed user analysis on the Worldwide LHC Computing Grid (WLCG) infrastructure is one of the most challenging tasks among the computing activities at the Large Hadron Collider. The Experiment Dashboard offers a solution that not only monitors but also manages (kill, resubmit) user tasks and jobs via a web interface. The ATLAS Dashboard Task Monitor provides analysis us…
▽ More
The organization of the distributed user analysis on the Worldwide LHC Computing Grid (WLCG) infrastructure is one of the most challenging tasks among the computing activities at the Large Hadron Collider. The Experiment Dashboard offers a solution that not only monitors but also manages (kill, resubmit) user tasks and jobs via a web interface. The ATLAS Dashboard Task Monitor provides analysis users with a tool that is independent of the operating system and Grid environment. This contribution describes the functionality of the application and its implementation details, in particular authentication, authorization and audit of the management operations.
△ Less
Submitted 30 May, 2019;
originally announced June 2019.
-
ATLAS job monitoring in the Dashboard Framework
Authors:
L Sargsyan,
J Andreeva,
S Campana,
E Karavakis,
L Kokoszkiewicz,
P Saiz,
J Schovancova,
D Tuckett
Abstract:
Monitoring of the large-scale data processing of the ATLAS experiment includes monitoring of production and user analysis jobs. The Experiment Dashboard provides a common job monitoring solution, which is shared by ATLAS and CMS experiments. This includes an accounting portal as well as real-time monitoring. Dashboard job monitoring for ATLAS combines information from the PanDA job processing data…
▽ More
Monitoring of the large-scale data processing of the ATLAS experiment includes monitoring of production and user analysis jobs. The Experiment Dashboard provides a common job monitoring solution, which is shared by ATLAS and CMS experiments. This includes an accounting portal as well as real-time monitoring. Dashboard job monitoring for ATLAS combines information from the PanDA job processing database, Production system database and monitoring information from jobs submitted through GANGA to Workload Management System (WMS) or local batch systems. Usage of Dashboard-based job monitoring applications will decrease load on the PanDA database and overcome scale limitations in PanDA monitoring caused by the short job rotation cycle in the PanDA database. Aggregation of the task/job metrics from different sources provides complete view of job processing activity in ATLAS scope.
△ Less
Submitted 30 May, 2019;
originally announced May 2019.
-
A Roadmap for HEP Software and Computing R&D for the 2020s
Authors:
Johannes Albrecht,
Antonio Augusto Alves Jr,
Guilherme Amadio,
Giuseppe Andronico,
Nguyen Anh-Ky,
Laurent Aphecetche,
John Apostolakis,
Makoto Asai,
Luca Atzori,
Marian Babik,
Giuseppe Bagliesi,
Marilena Bandieramonte,
Sunanda Banerjee,
Martin Barisits,
Lothar A. T. Bauerdick,
Stefano Belforte,
Douglas Benjamin,
Catrin Bernius,
Wahid Bhimji,
Riccardo Maria Bianchi,
Ian Bird,
Catherine Biscarat,
Jakob Blomer,
Kenneth Bloom,
Tommaso Boccali
, et al. (285 additional authors not shown)
Abstract:
Particle physics has an ambitious and broad experimental programme for the coming decades. This programme requires large investments in detector hardware, either to build new facilities and experiments, or to upgrade existing ones. Similarly, it requires commensurate investment in the R&D of software to acquire, manage, process, and analyse the shear amounts of data to be recorded. In planning for…
▽ More
Particle physics has an ambitious and broad experimental programme for the coming decades. This programme requires large investments in detector hardware, either to build new facilities and experiments, or to upgrade existing ones. Similarly, it requires commensurate investment in the R&D of software to acquire, manage, process, and analyse the shear amounts of data to be recorded. In planning for the HL-LHC in particular, it is critical that all of the collaborating stakeholders agree on the software goals and priorities, and that the efforts complement each other. In this spirit, this white paper describes the R&D activities required to prepare for this software upgrade.
△ Less
Submitted 19 December, 2018; v1 submitted 18 December, 2017;
originally announced December 2017.