-
Design Status of BCC Cryomodule for LCLS-II HE
Authors:
C. Narug,
T. Arkan,
S. Cheban,
M. Chen,
B. Hartsell,
J. Kaluzny,
Y. Orlov,
V. Kashikhin
Abstract:
A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vac…
▽ More
A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.
△ Less
Submitted 11 July, 2023;
originally announced July 2023.
-
200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab
Authors:
T. Arkan,
J. Kaluzny,
D. Bafia,
D. Bice,
J. Blowers,
A. Cravatta,
M. Checchin,
B. Giaccone,
C. Grimm,
B. Hartsell,
M. Martinello,
T. Nicol,
Y. Orlov,
S. Posen
Abstract:
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It…
▽ More
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.
△ Less
Submitted 26 August, 2022;
originally announced August 2022.
-
Tests Of The Extended Range SRF Cavity Tuners For The LCLS-II-HE Project*
Authors:
C. Contreras-Martinez,
T. Arkan,
A. Cravatta,
B. Hartsell,
J. Kaluzny,
T. Khabiboulline,
Y. Pischalnikov,
S. Posen,
G. Romanov,
JC. Yun
Abstract:
The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in the verification cryomodule (vCM) and CM 1 at Fermilab at 2 K. In both cases, the tuners achieved a frequency shift of -565$\pm$80 kHz. This…
▽ More
The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in the verification cryomodule (vCM) and CM 1 at Fermilab at 2 K. In both cases, the tuners achieved a frequency shift of -565$\pm$80 kHz. This study will discuss cavity frequency during each step as it is being assembled in the cryomodule string and finally when it is being tested at 2 K. Tracking the cavity frequency helped enable the tuners to reach this large frequency shift. The specific procedures of tuner setting during assembly will be presented.
△ Less
Submitted 12 August, 2022;
originally announced August 2022.
-
Accelerated Lifetime Test of The SRF Dressed Cavity/Tuner System for LCLS II HE Project
Authors:
Y. Pischalnikov,
T. Arkan,
C. Contreras-Martinez,
B. Hartsell,
J. Kaluzny,
R. Pilipenko,
J. C. Yun,
W. Lahmadi
Abstract:
The off-frequency detune method is being considered for application in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously [1]. Design of the tuner has been changed to deliver roughly 3 times larger frequency tuning range. Working requirements for off-frequency operation (OFO) state that cavities be tuned at least twice…
▽ More
The off-frequency detune method is being considered for application in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously [1]. Design of the tuner has been changed to deliver roughly 3 times larger frequency tuning range. Working requirements for off-frequency operation (OFO) state that cavities be tuned at least twice a month. This specification requires the in-crease of the tuner longevity by 20 times compared with LCLS-II demands. Accelerated longevity tests of the LCLS-II HE dressed cavity with tuner were conducted at FNAL's HTS. Detail analysis of wearing and impacts on performances of the tuner's piezo and stepper motor actuators will be presented. Additionally, results of longevity testing of the dressed cavity bellow, when cooled down to 2 K and compressed by 2.6 mm for roughly 2000 cycles, will be presented.
△ Less
Submitted 8 August, 2022;
originally announced August 2022.
-
Plasma Cleaning of LCLS-II-HE verification cryomodule cavities
Authors:
Bianca Giaccone,
Paolo Berrutti,
Martina Martinello,
Sam Posen,
Andrew Cravatta,
Alexandr Netepenko,
Tug Arkan,
Anna Grassellino,
Brian Hartsell,
Joshua Kaluzny,
Andrew Penhollow,
Dan Gonnella,
Marc Ross,
James Maniscalco,
Joel Fuerst,
Greg Hays,
Marc Doleans
Abstract:
Plasma cleaning is a technique that can be applied in superconducting radio-frequency (SRF) cavities in situ in cryomodules in order to decrease their level of field emission. We developed the technique for the Linac Coherent Light Source II (LCLS-II) cavities and we present in this paper the full development and application of plasma processing to the LCLS-II High Energy (HE) verification cryomod…
▽ More
Plasma cleaning is a technique that can be applied in superconducting radio-frequency (SRF) cavities in situ in cryomodules in order to decrease their level of field emission. We developed the technique for the Linac Coherent Light Source II (LCLS-II) cavities and we present in this paper the full development and application of plasma processing to the LCLS-II High Energy (HE) verification cryomodule (vCM). We validated our plasma processing procedure on the vCM, fully processing four out of eight cavities of this CM, demonstrating that cavities performance were preserved in terms of both accelerating field and quality factor. Applying plasma processing to this clean, record breaking cryomodule also showed that no contaminants were introduced in the string, maintaining the vCM field emission-free up to the maximum field reached by each cavity. We also found that plasma processing eliminates multipacting (MP) induced quenches that are typically observed frequently within the MP band field range. This suggests that plasma processing could be employed in situ in CMs to mitigate both field emission and multipacting, significantly decreasing the testing time of cryomodules, the linac commissioning time and cost and increasing the accelerator reliability.
△ Less
Submitted 1 June, 2022; v1 submitted 24 January, 2022;
originally announced January 2022.
-
LCLS-II-HE verification cryomodule high gradient performance and quench behavior
Authors:
S. Posen,
A. Cravatta,
M. Checchin,
S. Aderhold,
C. Adolphsen,
T. Arkan,
D. Bafia,
A. Benwell,
D. Bice,
B. Chase,
C. Contreras-Martinez,
L. Dootlittle,
J. Fuerst,
D. Gonnella,
A. Grassellino,
C. Grimm,
B. Hansen,
E. Harms,
B. Hartsell,
G. Hays,
J. Holzbauer,
S. Hoobler,
J. Kaluzny,
T. Khabiboulline,
M. Kucera
, et al. (21 additional authors not shown)
Abstract:
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipac…
▽ More
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen do** treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in LCLS-II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0x10^10) also exceeded its specification (2.7x10^10). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.
△ Less
Submitted 27 October, 2021;
originally announced October 2021.
-
Design Of The LBNF Beamline
Authors:
V. Papadimitriou,
K. Ammigan,
J. Anderson Jr.,
K. E. Anderson,
R. Andrews,
V. Bocean,
C. F. Crowley,
N. Eddy,
B. D. Hartsell,
S. Hays,
P. Hurh,
J. Hylen,
J. A. Johnstone,
P. Kasper,
T. Kobilarcik,
G. E. Krafczyk,
B. Lundberg,
A. Marchionni,
N. V. Mokhov,
C. D. Moore,
D. Pushka,
I. Rakhno,
S. D. Reitzner,
P. Schlabach,
V. Sidorov
, et al. (9 additional authors not shown)
Abstract:
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's…
▽ More
The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos will be produced when the protons interact with a solid target to produce mesons which will be subsequently focused by magnetic horns into a 194m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.
△ Less
Submitted 14 April, 2017;
originally announced April 2017.
-
Installation Progress At The PIP-II Injector Test At Fermilab
Authors:
C. Baffes,
M. Alvarez,
R. Andrews,
A. Chen,
J. Czajkowski,
P. Derwent,
J. Edelen,
B. Hanna,
B. Hartsell,
K. Kendziora,
D. Mitchell,
L. Prost,
V. Scarpine,
A. Shemyakin,
J. Steimel,
T. Zuchnik,
A. Edelen
Abstract:
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr…
▽ More
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
△ Less
Submitted 4 January, 2017;
originally announced January 2017.
-
Design of the LBNF Beamline Target Station
Authors:
S. Tariq,
K. Ammigan,
K. Anderson,
S. A. Buccellato,
C. F. Crowley,
B. D. Hartsell,
P. Hurh,
J. Hylen,
P. Kasper,
G. E. Krafczyk,
A. Lee,
B. Lundberg,
A. Marchionni,
N. V. Mokhov,
C. D. Moore,
V. Papadimitriou,
D. Pushka,
I. Rakhno,
S. D. Reitzner,
V. Sidorov,
A. M. Stefanik,
I. S . Tropin,
K. Vaziri,
K. Williams,
R. M. Zwaska
, et al. (1 additional authors not shown)
Abstract:
The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructu…
▽ More
The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructure. Protons hit the target producing mesons which are then focused by the horns into a helium-filled decay pipe where they decay into muons and neutrinos. The target and horns are encased in actively cooled steel and concrete shielding in a chamber called the target chase. The reference design chase is filled with air, but nitrogen and helium are being evaluated as alternatives. A replaceable beam window separates the decay pipe from the target chase. The facility is designed for initial operation at 1.2 MW, with the ability to upgrade to 2.4 MW, and is taking advantage of the experience gained by operating Fermilab's NuMI facility. We discuss here the design status, associated challenges, and ongoing R&D and physics-driven component optimization of the Target Station.
△ Less
Submitted 21 December, 2016;
originally announced December 2016.
-
Mu2e Technical Design Report
Authors:
L. Bartoszek,
E. Barnes,
J. P. Miller,
J. Mott,
A. Palladino,
J. Quirk,
B. L. Roberts,
J. Crnkovic,
V. Polychronakos,
V. Tishchenko,
P. Yamin,
C. -h. Cheng,
B. Echenard,
K. Flood,
D. G. Hitlin,
J. H. Kim,
T. S. Miyashita,
F. C. Porter,
M. Röhrken,
J. Trevor,
R. -Y. Zhu,
E. Heckmaier,
T. I. Kang,
G. Lim,
W. Molzon
, et al. (238 additional authors not shown)
Abstract:
The Mu2e experiment at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better than the current world's best limits for this process. The experiment's sensitivity offers discovery potential over a wide array of new physics models and probes mass scales well beyond the reach of the L…
▽ More
The Mu2e experiment at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better than the current world's best limits for this process. The experiment's sensitivity offers discovery potential over a wide array of new physics models and probes mass scales well beyond the reach of the LHC. We describe herein the preliminary design of the proposed Mu2e experiment. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-2 approval.
△ Less
Submitted 16 March, 2015; v1 submitted 21 January, 2015;
originally announced January 2015.