-
JUNO Conceptual Design Report
Authors:
T. Adam,
F. An,
G. An,
Q. An,
N. Anfimov,
V. Antonelli,
G. Baccolo,
M. Baldoncini,
E. Baussan,
M. Bellato,
L. Bezrukov,
D. Bick,
S. Blyth,
S. Boarin,
A. Brigatti,
T. Brugière,
R. Brugnera,
M. Buizza Avanzini,
J. Busto,
A. Cabrera,
H. Cai,
X. Cai,
A. Cammi,
D. Cao,
G. Cao
, et al. (372 additional authors not shown)
Abstract:
The Jiangmen Underground Neutrino Observatory (JUNO) is proposed to determine the neutrino mass hierarchy using an underground liquid scintillator detector. It is located 53 km away from both Yangjiang and Taishan Nuclear Power Plants in Guangdong, China. The experimental hall, spanning more than 50 meters, is under a granite mountain of over 700 m overburden. Within six years of running, the dete…
▽ More
The Jiangmen Underground Neutrino Observatory (JUNO) is proposed to determine the neutrino mass hierarchy using an underground liquid scintillator detector. It is located 53 km away from both Yangjiang and Taishan Nuclear Power Plants in Guangdong, China. The experimental hall, spanning more than 50 meters, is under a granite mountain of over 700 m overburden. Within six years of running, the detection of reactor antineutrinos can resolve the neutrino mass hierarchy at a confidence level of 3-4$σ$, and determine neutrino oscillation parameters $\sin^2θ_{12}$, $Δm^2_{21}$, and $|Δm^2_{ee}|$ to an accuracy of better than 1%. The JUNO detector can be also used to study terrestrial and extra-terrestrial neutrinos and new physics beyond the Standard Model. The central detector contains 20,000 tons liquid scintillator with an acrylic sphere of 35 m in diameter. $\sim$17,000 508-mm diameter PMTs with high quantum efficiency provide $\sim$75% optical coverage. The current choice of the liquid scintillator is: linear alkyl benzene (LAB) as the solvent, plus PPO as the scintillation fluor and a wavelength-shifter (Bis-MSB). The number of detected photoelectrons per MeV is larger than 1,100 and the energy resolution is expected to be 3% at 1 MeV. The calibration system is designed to deploy multiple sources to cover the entire energy range of reactor antineutrinos, and to achieve a full-volume position coverage inside the detector. The veto system is used for muon detection, muon induced background study and reduction. It consists of a Water Cherenkov detector and a Top Tracker system. The readout system, the detector control system and the offline system insure efficient and stable data acquisition and processing.
△ Less
Submitted 28 September, 2015; v1 submitted 28 August, 2015;
originally announced August 2015.
-
A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper
Authors:
E. Baussan,
M. Blennow,
M. Bogomilov,
E. Bouquerel,
J. Cederkall,
P. Christiansen,
P. Coloma,
P. Cupial,
H. Danared,
C. Densham,
M. Dracos,
T. Ekelof,
M. Eshraqi,
E. Fernandez Martinez,
G. Gaudiot,
R. Hall-Wilton,
J. -P. Koutchouk,
M. Lindroos,
R. Matev,
D. McGinnis,
M. Mezzetto,
R. Miyamoto,
L. Mosca,
T. Ohlsson,
H. Ohman
, et al. (10 additional authors not shown)
Abstract:
Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseli…
▽ More
Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseline program for the European Spallation Source linac is that it will be fully operational at 5 MW average power by 2022, producing 2 GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron production and 14 pulses/s for neutrino production. Furthermore, because of the high current required in the pulsed neutrino horn, the length of the pulses used for neutrino production needs to be compressed to a few $μ$s with the aid of an accumulator ring. A long baseline experiment using this Super Beam and a megaton underground Water Cherenkov detector located in existing mines 300-600 km from Lund will make it possible to discover leptonic CP violation at 5 $σ$ significance level in up to 50% of the leptonic Dirac CP-violating phase range. This experiment could also determine the neutrino mass hierarchy at a significance level of more than 3 $σ$ if this issue will not already have been settled by other experiments by then. The mass hierarchy performance could be increased by combining the neutrino beam results with those obtained from atmospheric neutrinos detected by the same large volume detector. This detector will also be used to measure the proton lifetime, detect cosmological neutrinos and neutrinos from supernova explosions. Results on the sensitivity to leptonic CP violation and the neutrino mass hierarchy are presented.
△ Less
Submitted 12 November, 2013; v1 submitted 26 September, 2013;
originally announced September 2013.
-
The EUROnu Project
Authors:
T. R. Edgecock,
O. Caretta,
T. Davenne,
C. Densham,
M. Fitton,
D. Kelliher,
P. Loveridge,
S. Machida,
C. Prior,
C. Rogers,
M. Rooney,
J. Thomason,
D. Wilcox,
E. Wildner,
I. Efthymiopoulos,
R. Garoby,
S. Gilardoni,
C. Hansen,
E. Benedetto,
E. Jensen,
A. Kosmicki,
M. Martini,
J. Osborne,
G. Prior,
T. Stora
, et al. (146 additional authors not shown)
Abstract:
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the…
▽ More
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ- beams in a storage ring. The far detector in this case is a 100 kt Magnetised Iron Neutrino Detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular 6He and 18Ne, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive.
△ Less
Submitted 17 May, 2013;
originally announced May 2013.
-
Study of the pulse power supply unit for the four-horn system of the CERN to Frejus neutrino super beam
Authors:
E Baussan,
E Bouquerel,
M Dracos,
G Gaudiot,
F Osswald,
P Poussot,
N Vassilopoulos,
J Wurtz,
V Zeter
Abstract:
The power supply studies for the four-horn system for the CERN to Fréjus neutrino Super Beam oscillation experiment are discussed here. The power supply is being studied to meet the physics potential and the mega-watt (MW) power requirements of the proton driver of the Super Beam. A one-half sinusoid current waveform with a 350 kA maximum current and pulse length of 100 μs at 50 Hz frequency is ge…
▽ More
The power supply studies for the four-horn system for the CERN to Fréjus neutrino Super Beam oscillation experiment are discussed here. The power supply is being studied to meet the physics potential and the mega-watt (MW) power requirements of the proton driver of the Super Beam. A one-half sinusoid current waveform with a 350 kA maximum current and pulse length of 100 μs at 50 Hz frequency is generated and distributed to four-horns. In order to provide the necessary current needed to focus the charged mesons producing the neutrino beam, a bench of capacitors is charged at 50 Hz frequency to a +12 kV reference voltage and then discharged through a large switch to each horn via a set of strip-lines at the same rate. A current recovery stage allows to invert rapidly the negative voltage of the capacitor after the discharging stage in order to recuperate large part of the injected energy and thus to limit the power consuption. The energy recovery efficiency of that system is very high at 97%. For feasibility reasons, a modular architecture has been adopted with 8 modules connected in parallel to deliver 44 kA peak currents into the four-horn system.
△ Less
Submitted 18 May, 2013; v1 submitted 26 April, 2013;
originally announced April 2013.
-
The SPL-based Neutrino Super Beam
Authors:
E. Baussan,
J. Bielski,
C. Bobeth,
E. Bouquerel,
O. Caretta,
P. Cupial,
T. Davenne,
C. Densham,
M. Dracos,
M. Fitton,
G. Gaudiot,
M. Kozien,
L. Lacny,
B. Lepers,
A. Longhin,
P. Loveridge,
F. Osswald,
P. Poussot,
M. Rooney,
B. Skoczen,
B. Szybinski,
A. Ustrzycka,
N. Vassilopoulos,
D. Wilcox,
A. Wroblewski
, et al. (3 additional authors not shown)
Abstract:
The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fréjus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector.
In the study reported here, we have developed the conceptual design…
▽ More
The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fréjus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector.
In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam present several unprecedented challenges, like the high primary proton beam power (4 MW), the high repetition rate (50 Hz) and the low energy of the protons (4.5 GeV). The design is completed by a study of all the main component of the system, starting from the transport system to guide the beam to the target up to the beam dump.
△ Less
Submitted 4 December, 2012;
originally announced December 2012.
-
Target, magnetic horn and safety studies for the CERN to Frejus Super Beam
Authors:
E. Baussan,
M. Dracos,
G. Gaudiot,
B. Lepers,
F. Osswald,
P. Poussot,
N. Vassilopoulos,
J. Wurtz,
V. Zeter for EUROnu WP2 group
Abstract:
In the framework of the EUROnu design study, a new design for the CERN to Frejus neutrino beam based on the SPL is under development by the WP2 group. The main challenge of this project lies with the design of a multi-MW neutrino beam facility. The horn and the decay tunnel parameters have been optimized to maximize any potential discovery. The target design, thermo-mechanical analysis, and power…
▽ More
In the framework of the EUROnu design study, a new design for the CERN to Frejus neutrino beam based on the SPL is under development by the WP2 group. The main challenge of this project lies with the design of a multi-MW neutrino beam facility. The horn and the decay tunnel parameters have been optimized to maximize any potential discovery. The target design, thermo-mechanical analysis, and power supply design of the horn system as well as any safety issues are being studied to meet the MW power requirements for the proton-beam.
△ Less
Submitted 7 October, 2011;
originally announced October 2011.