Skip to main content

Showing 1–6 of 6 results for author: Gaudiot, G

.
  1. arXiv:1508.07166  [pdf, other

    physics.ins-det hep-ex

    JUNO Conceptual Design Report

    Authors: T. Adam, F. An, G. An, Q. An, N. Anfimov, V. Antonelli, G. Baccolo, M. Baldoncini, E. Baussan, M. Bellato, L. Bezrukov, D. Bick, S. Blyth, S. Boarin, A. Brigatti, T. Brugière, R. Brugnera, M. Buizza Avanzini, J. Busto, A. Cabrera, H. Cai, X. Cai, A. Cammi, D. Cao, G. Cao , et al. (372 additional authors not shown)

    Abstract: The Jiangmen Underground Neutrino Observatory (JUNO) is proposed to determine the neutrino mass hierarchy using an underground liquid scintillator detector. It is located 53 km away from both Yangjiang and Taishan Nuclear Power Plants in Guangdong, China. The experimental hall, spanning more than 50 meters, is under a granite mountain of over 700 m overburden. Within six years of running, the dete… ▽ More

    Submitted 28 September, 2015; v1 submitted 28 August, 2015; originally announced August 2015.

    Comments: 328 pages, 211 figures

  2. arXiv:1309.7022  [pdf, other

    hep-ex hep-ph physics.acc-ph physics.ins-det

    A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper

    Authors: E. Baussan, M. Blennow, M. Bogomilov, E. Bouquerel, J. Cederkall, P. Christiansen, P. Coloma, P. Cupial, H. Danared, C. Densham, M. Dracos, T. Ekelof, M. Eshraqi, E. Fernandez Martinez, G. Gaudiot, R. Hall-Wilton, J. -P. Koutchouk, M. Lindroos, R. Matev, D. McGinnis, M. Mezzetto, R. Miyamoto, L. Mosca, T. Ohlsson, H. Ohman , et al. (10 additional authors not shown)

    Abstract: Very intense neutrino beams and large neutrino detectors will be needed in order to enable the discovery of CP violation in the leptonic sector. We propose to use the proton linac of the European Spallation Source currently under construction in Lund, Sweden to deliver, in parallel with the spallation neutron production, a very intense, cost effective and high performance neutrino beam. The baseli… ▽ More

    Submitted 12 November, 2013; v1 submitted 26 September, 2013; originally announced September 2013.

    Comments: 28 pages

    Journal ref: Nuclear Physics B, Volume 885, August 2014, Pages 127-149

  3. arXiv:1305.4067  [pdf

    physics.acc-ph hep-ex

    The EUROnu Project

    Authors: T. R. Edgecock, O. Caretta, T. Davenne, C. Densham, M. Fitton, D. Kelliher, P. Loveridge, S. Machida, C. Prior, C. Rogers, M. Rooney, J. Thomason, D. Wilcox, E. Wildner, I. Efthymiopoulos, R. Garoby, S. Gilardoni, C. Hansen, E. Benedetto, E. Jensen, A. Kosmicki, M. Martini, J. Osborne, G. Prior, T. Stora , et al. (146 additional authors not shown)

    Abstract: The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the… ▽ More

    Submitted 17 May, 2013; originally announced May 2013.

    Comments: Results from the Framework Programme 7 project EUROnu, which studied three possible accelerator facilities for future high intensity neutrino oscillation facilities in Europe

    Journal ref: Phys. Rev. ST Accel. Beams 16 021002 (2013)

  4. arXiv:1304.7111  [pdf, other

    physics.acc-ph physics.ins-det

    Study of the pulse power supply unit for the four-horn system of the CERN to Frejus neutrino super beam

    Authors: E Baussan, E Bouquerel, M Dracos, G Gaudiot, F Osswald, P Poussot, N Vassilopoulos, J Wurtz, V Zeter

    Abstract: The power supply studies for the four-horn system for the CERN to Fréjus neutrino Super Beam oscillation experiment are discussed here. The power supply is being studied to meet the physics potential and the mega-watt (MW) power requirements of the proton driver of the Super Beam. A one-half sinusoid current waveform with a 350 kA maximum current and pulse length of 100 μs at 50 Hz frequency is ge… ▽ More

    Submitted 18 May, 2013; v1 submitted 26 April, 2013; originally announced April 2013.

    Comments: latex options changes

    Journal ref: JINST 8 (2013) T07006

  5. arXiv:1212.0732  [pdf, other

    physics.acc-ph

    The SPL-based Neutrino Super Beam

    Authors: E. Baussan, J. Bielski, C. Bobeth, E. Bouquerel, O. Caretta, P. Cupial, T. Davenne, C. Densham, M. Dracos, M. Fitton, G. Gaudiot, M. Kozien, L. Lacny, B. Lepers, A. Longhin, P. Loveridge, F. Osswald, P. Poussot, M. Rooney, B. Skoczen, B. Szybinski, A. Ustrzycka, N. Vassilopoulos, D. Wilcox, A. Wroblewski , et al. (3 additional authors not shown)

    Abstract: The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fréjus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design… ▽ More

    Submitted 4 December, 2012; originally announced December 2012.

  6. arXiv:1110.1585  [pdf, other

    physics.acc-ph hep-ex physics.ins-det

    Target, magnetic horn and safety studies for the CERN to Frejus Super Beam

    Authors: E. Baussan, M. Dracos, G. Gaudiot, B. Lepers, F. Osswald, P. Poussot, N. Vassilopoulos, J. Wurtz, V. Zeter for EUROnu WP2 group

    Abstract: In the framework of the EUROnu design study, a new design for the CERN to Frejus neutrino beam based on the SPL is under development by the WP2 group. The main challenge of this project lies with the design of a multi-MW neutrino beam facility. The horn and the decay tunnel parameters have been optimized to maximize any potential discovery. The target design, thermo-mechanical analysis, and power… ▽ More

    Submitted 7 October, 2011; originally announced October 2011.

    Comments: Contribution to NUFACT 11, XIIIth International Workshop on Neutrino Factories, Super Beams and Beta beams, 1-6 August 2011, CERN and University of Geneva (Submitted to IOP conference series), 4 pages, 6 figures