Skip to main content

Showing 1–7 of 7 results for author: Einstein-Curtis, J

.
  1. arXiv:2311.02096  [pdf, other

    physics.acc-ph cs.LG

    Variational Autoencoders for Noise Reduction in Industrial LLRF Systems

    Authors: J. P. Edelen, M. J. Henderson, J. Einstein-Curtis, C. C. Hall, J. A. Diaz Cruz, A. L. Edelen

    Abstract: Industrial particle accelerators inherently operate in much dirtier environments than typical research accelerators. This leads to an increase in noise both in the RF system and in other electronic systems. Combined with the fact that industrial accelerators are mass produced, there is less attention given to optimizing the performance of an individual system. As a result, industrial systems tend… ▽ More

    Submitted 7 November, 2023; v1 submitted 29 October, 2023; originally announced November 2023.

    Comments: Talk presented at LLRF Workshop 2023 (LLRF2023, arXiv: 2310.03199)

    Report number: LLRF2023/97

  2. arXiv:2310.04209  [pdf, other

    physics.acc-ph

    LLRF System Considerations for a Compact, Commercial C-band Accelerator using the AMD Xilinx RF-SoC

    Authors: J. Einstein-Curtis, J. Edelen, B. Gur, M. Henderson, G. Khalsa, M. Kilpatrick, R. O'Rourke, R. Augustsson, A. Diego, A. Smirnov, S. Thielk, B. Hong, Z. Li, C. Liu, J. Merrick, E. Nanni, L. Ruckman, S. Tantawi, F. Zuo

    Abstract: This work describes the LLRF and control system in use for a novel accelerator structure developed for a compact design operating in C-band developed by SLAC, with collaboration from RadiaBeam and RadiaSoft. This design is a pulsed RF/pulsed beam system that only provides minimal monitoring for control of each two-cavity pair. Available signals include only a forward and reflected signal for each… ▽ More

    Submitted 9 October, 2023; v1 submitted 6 October, 2023; originally announced October 2023.

    Comments: Poster presented at LLRF Workshop 2023 (LLRF2023, arXiv: 2310.03199)

    Report number: LLRF2023/95

  3. arXiv:2208.06316  [pdf

    physics.acc-ph

    LCLS-II and HE Cryomodule Microphonics at CMTF in Fermilab*

    Authors: C. Contreras-Martinez, E. Harms, C. Cravatta, J. Holzbauer, S. Posen, L. Doolittle, B. Chase, J. Einstein-Curtis, J. Makara, R. Wang

    Abstract: Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data c… ▽ More

    Submitted 12 August, 2022; originally announced August 2022.

    Report number: FERMILAB-CONF-22-580-TD

  4. arXiv:1806.08750  [pdf

    physics.acc-ph

    First Performance Results Of The PIP2IT MEBT 200 Ohm Kicker Prototype

    Authors: G. Saewert, M. H. Awida, B. E. Chase, A. Chen, J. Einstein-Curtis, D. Frolov, K. Martin, H. Pfeffer, D. Wolff, S. Khole, D. Sharma

    Abstract: The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chop** system to perform arbitrary, bunch-by-bunch removal of 162.5 MHz structured beam. The MEBT chop** system will consist of two identical kickers working together and a beam absorber. One design of two having… ▽ More

    Submitted 22 June, 2018; originally announced June 2018.

    Comments: 3 pp

    Report number: Fermilab-Conf-18-144-AD

  5. arXiv:1806.05708  [pdf

    physics.acc-ph

    PIP-II Injector Test Warm Front End: Commissioning Update

    Authors: L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista

    Abstract: The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,… ▽ More

    Submitted 14 June, 2018; originally announced June 2018.

    Comments: 4 pp

    Report number: Fermilab-Conf-18-017-AD

  6. arXiv:1805.02725  [pdf

    physics.acc-ph

    Commissioning And First Results From The Fermilab Cryomodule Test Stand

    Authors: E. R. Harms, M. Awida, C. Baffes, K. Carlson, S. Chandrasekaran, B. Chase, E. Cullerton, J. Edelen, J. Einstein-Curtis, C. Ginsburg, A. Grassellino, B. Hansen, J. Holzbauer, S. Kazakov, T. Khabiboulline, M. Kucera, J. Leibfritz, A. Lunin, D. McDowell, M. McGee, D. Nicklaus, D. Orris, J. Ozelis, J. Patrick, T. Petersen , et al. (12 additional authors not shown)

    Abstract: A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overv… ▽ More

    Submitted 7 May, 2018; originally announced May 2018.

    Comments: 4 pp. Proceedings of LINAC2016, East Lansing, MI, USA

    Report number: Fermilab-Conf-16-744-AD-APC-TD

  7. arXiv:1803.08211  [pdf

    physics.acc-ph

    Low Level RF Control for the PIP-II Accelerator

    Authors: J. P. Edelen, B. E. Chase, E. Cullerton, J. Einstein-Curtis, J. Holzbauer, D. Klepec, Y. Pischalnikov, W. Schappert, P. Varghese, G. Joshi, S. Khole, D. Sharma

    Abstract: The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and t… ▽ More

    Submitted 21 March, 2018; originally announced March 2018.

    Comments: Talk presented at LLRF Workshop 2017 (LLRF2017, arXiv:1803.07677)

    Report number: LLRF2017/O-15