-
Variational Autoencoders for Noise Reduction in Industrial LLRF Systems
Authors:
J. P. Edelen,
M. J. Henderson,
J. Einstein-Curtis,
C. C. Hall,
J. A. Diaz Cruz,
A. L. Edelen
Abstract:
Industrial particle accelerators inherently operate in much dirtier environments than typical research accelerators. This leads to an increase in noise both in the RF system and in other electronic systems. Combined with the fact that industrial accelerators are mass produced, there is less attention given to optimizing the performance of an individual system. As a result, industrial systems tend…
▽ More
Industrial particle accelerators inherently operate in much dirtier environments than typical research accelerators. This leads to an increase in noise both in the RF system and in other electronic systems. Combined with the fact that industrial accelerators are mass produced, there is less attention given to optimizing the performance of an individual system. As a result, industrial systems tend to under perform considering their hardware hardware capabilities. With the growing demand for accelerators for medical sterilization, food irradiation, cancer treatment, and imaging, improving the signal processing of these machines will increase the margin for the deployment of these systems. Our work is focusing on using machine learning techniques to reduce the noise of RF signals used for pulse-to-pulse feedback in industrial accelerators. We will review our algorithms, simulation results, and results working with measured data. We will then discuss next steps for deployment and testing on an industrial system.
△ Less
Submitted 7 November, 2023; v1 submitted 29 October, 2023;
originally announced November 2023.
-
LLRF System Considerations for a Compact, Commercial C-band Accelerator using the AMD Xilinx RF-SoC
Authors:
J. Einstein-Curtis,
J. Edelen,
B. Gur,
M. Henderson,
G. Khalsa,
M. Kilpatrick,
R. O'Rourke,
R. Augustsson,
A. Diego,
A. Smirnov,
S. Thielk,
B. Hong,
Z. Li,
C. Liu,
J. Merrick,
E. Nanni,
L. Ruckman,
S. Tantawi,
F. Zuo
Abstract:
This work describes the LLRF and control system in use for a novel accelerator structure developed for a compact design operating in C-band developed by SLAC, with collaboration from RadiaBeam and RadiaSoft. This design is a pulsed RF/pulsed beam system that only provides minimal monitoring for control of each two-cavity pair. Available signals include only a forward and reflected signal for each…
▽ More
This work describes the LLRF and control system in use for a novel accelerator structure developed for a compact design operating in C-band developed by SLAC, with collaboration from RadiaBeam and RadiaSoft. This design is a pulsed RF/pulsed beam system that only provides minimal monitoring for control of each two-cavity pair. Available signals include only a forward and reflected signal for each pair; such a design requires careful consideration of calibration and power-on routines, as well an understanding of how to correct for disturbances caused by the entire RF signal chain, including a new SSA, klystron, and distribution system. An AMD ** for larger-volume manufacturing.
This material is based upon work supported by the Defense Advanced Research Projects Agency under Contract Numbers 140D0423C0006 and 140D0423C0007. The views, opinions, and/or findings expressed are those of the author(s) and should not be interpreted as representing the official views or policies of the Department of Defense or the U.S. Government.
△ Less
Submitted 9 October, 2023; v1 submitted 6 October, 2023;
originally announced October 2023.
-
LCLS-II and HE Cryomodule Microphonics at CMTF in Fermilab*
Authors:
C. Contreras-Martinez,
E. Harms,
C. Cravatta,
J. Holzbauer,
S. Posen,
L. Doolittle,
B. Chase,
J. Einstein-Curtis,
J. Makara,
R. Wang
Abstract:
Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data c…
▽ More
Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data capture taken was 30 minutes or longer and sampled at 1 kHz.
△ Less
Submitted 12 August, 2022;
originally announced August 2022.
-
First Performance Results Of The PIP2IT MEBT 200 Ohm Kicker Prototype
Authors:
G. Saewert,
M. H. Awida,
B. E. Chase,
A. Chen,
J. Einstein-Curtis,
D. Frolov,
K. Martin,
H. Pfeffer,
D. Wolff,
S. Khole,
D. Sharma
Abstract:
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chop** system to perform arbitrary, bunch-by-bunch removal of 162.5 MHz structured beam. The MEBT chop** system will consist of two identical kickers working together and a beam absorber. One design of two having…
▽ More
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chop** system to perform arbitrary, bunch-by-bunch removal of 162.5 MHz structured beam. The MEBT chop** system will consist of two identical kickers working together and a beam absorber. One design of two having been proposed has been a 200 Ohm characteristic impedance traveling wave dual-helix kicker driven with custom designed high-speed switches. This paper reports on the first performance results of one prototype kicker built, installed and tested with beam at the PIP-II Injector Test (PIP2IT) facility. The helix deflector design details are discussed. The electrical performance of the high-speed switch driver operating at 500 V bias is presented. Tests performed were chop** beam at 81.25 MHz for microseconds as well as with a truly arbitrary pattern for 550 $μ$s bursts having a 45 MHz average switching rate and repeating at 20 Hz.
△ Less
Submitted 22 June, 2018;
originally announced June 2018.
-
PIP-II Injector Test Warm Front End: Commissioning Update
Authors:
L. Prost,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
B. Chase,
A. Chen,
E. Cullerton,
P. F. Derwent,
J. P. Edelen,
J. Einstein-Curtis,
D. Frolov,
B. Hanna,
D. Peterson,
G. Saewert,
A. Saini,
V. Scarpine,
A. Shemyakin,
J. Steimel,
D. Sun,
A. Warner,
C. Richard,
V. L. S. Sista
Abstract:
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,…
▽ More
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
△ Less
Submitted 14 June, 2018;
originally announced June 2018.
-
Commissioning And First Results From The Fermilab Cryomodule Test Stand
Authors:
E. R. Harms,
M. Awida,
C. Baffes,
K. Carlson,
S. Chandrasekaran,
B. Chase,
E. Cullerton,
J. Edelen,
J. Einstein-Curtis,
C. Ginsburg,
A. Grassellino,
B. Hansen,
J. Holzbauer,
S. Kazakov,
T. Khabiboulline,
M. Kucera,
J. Leibfritz,
A. Lunin,
D. McDowell,
M. McGee,
D. Nicklaus,
D. Orris,
J. Ozelis,
J. Patrick,
T. Petersen
, et al. (12 additional authors not shown)
Abstract:
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overv…
▽ More
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
△ Less
Submitted 7 May, 2018;
originally announced May 2018.
-
Low Level RF Control for the PIP-II Accelerator
Authors:
J. P. Edelen,
B. E. Chase,
E. Cullerton,
J. Einstein-Curtis,
J. Holzbauer,
D. Klepec,
Y. Pischalnikov,
W. Schappert,
P. Varghese,
G. Joshi,
S. Khole,
D. Sharma
Abstract:
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and t…
▽ More
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.
△ Less
Submitted 21 March, 2018;
originally announced March 2018.