Skip to main content

Showing 1–2 of 2 results for author: Deldicque, C

.
  1. arXiv:1806.08975  [pdf, other

    physics.ins-det hep-ex

    The CMS Data Acquisition System for the Phase-2 Upgrade

    Authors: Jean-Marc André, Ulf Behrens, Andrea Bocci, James Branson, Sergio Cittolin, Diego Da Silva Gomes, Georgiana-Lavinia Darlea, Christian Deldicque, Zeynep Demiragli, Marc Dobson, Nicolas Doualot, Samim Erhan, Jonathan Richard Fulcher, Dominique Gigi, Maciej Gladki, Frank Glege, Guillelmo Gomez-Ceballos, Magnus Hansen, Jeroen Hegeman, André Holzner, Michael Lettrich, Audrius Mecionis, Frans Meijers, Emilio Meschi, Remigius K. Mommsen , et al. (20 additional authors not shown)

    Abstract: During the third long shutdown of the CERN Large Hadron Collider, the CMS Detector will undergo a major upgrade to prepare for Phase-2 of the CMS physics program, starting around 2026. The upgraded CMS detector will be read out at an unprecedented data rate of up to 50 Tb/s with an event rate of 750 kHz, selected by the level-1 hardware trigger, and an average event size of 7.4 MB. Complete events… ▽ More

    Submitted 23 June, 2018; originally announced June 2018.

  2. Commissioning of the CMS High Level Trigger

    Authors: Lorenzo Agostino, Gerry Bauer, Barbara Beccati, Ulf Behrens, Jeffrey Berryhil, Kurt Biery, Tulika Bose, Angela Brett, James Branson, Eric Cano, Harry Cheung, Marek Ciganek, Sergio Cittolin, Jose Antonio Coarasa, Bryan Dahmes, Christian Deldicque, Elizabeth Dusinberre, Samim Erhan, Dominique Gigi, Frank Glege, Robert Gomez-Reino, Johannes Gutleber, Derek Hatton, Jean-Francois Laurens, Constantin Loizides , et al. (25 additional authors not shown)

    Abstract: The CMS experiment will collect data from the proton-proton collisions delivered by the Large Hadron Collider (LHC) at a centre-of-mass energy up to 14 TeV. The CMS trigger system is designed to cope with unprecedented luminosities and LHC bunch-crossing rates up to 40 MHz. The unique CMS trigger architecture only employs two trigger levels. The Level-1 trigger is implemented using custom electr… ▽ More

    Submitted 7 August, 2009; originally announced August 2009.

    Journal ref: JINST 4:P10005,2009