-
Test Results of PIP2IT MEBT Vacuum Protection System
Authors:
A. Chen,
R. Andrews,
C. Baffes,
D. Lambert,
L. Prost,
A. Shemyakin,
T. Zuchnik
Abstract:
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a v…
▽ More
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a vacuum failure occurs in the warm front end, a vacuum protection system is envisioned to be used in the PIP-II MEBT. It features a fast closing valve with two sensors and a differential pum** insert. The system prototype was installed in the PIP-II Injector Test (PIP2IT) accelerator and successfully tested in several modes modelling the vacuum failures. The report presents the design of the vacuum protection system and results of its tests.
△ Less
Submitted 5 December, 2019;
originally announced December 2019.
-
Commissioning and Operation of FAST Electron Linac at Fermilab
Authors:
A. Romanov,
C. Baffes,
D. R. Broemmelsiek,
K. Carlson,
D. J. Crawford,
N. Eddy,
D. Edstrom Jr.,
E. R. Harms,
J. Hurd,
M. Kucera,
J. Leibfritz,
I. Rakhno,
J. Reid,
J. Ruan,
J. Santucci,
V. Shiltsev,
G. Stancari,
R. Thurman-Keup,
A. Valishev,
A. Warner
Abstract:
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF…
▽ More
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The photoinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commissioning such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation.
△ Less
Submitted 9 November, 2018;
originally announced November 2018.
-
Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac
Authors:
L. Lari,
F. Cerutti,
L. S. Esposito,
C. Baffes,
S. J. Dixon,
N. V. Mokhov,
I. Rakhno,
I. S. Tropin
Abstract:
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this…
▽ More
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.
△ Less
Submitted 14 June, 2018;
originally announced June 2018.
-
PIP-II Injector Test Warm Front End: Commissioning Update
Authors:
L. Prost,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
B. Chase,
A. Chen,
E. Cullerton,
P. F. Derwent,
J. P. Edelen,
J. Einstein-Curtis,
D. Frolov,
B. Hanna,
D. Peterson,
G. Saewert,
A. Saini,
V. Scarpine,
A. Shemyakin,
J. Steimel,
D. Sun,
A. Warner,
C. Richard,
V. L. S. Sista
Abstract:
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,…
▽ More
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
△ Less
Submitted 14 June, 2018;
originally announced June 2018.
-
Commissioning And First Results From The Fermilab Cryomodule Test Stand
Authors:
E. R. Harms,
M. Awida,
C. Baffes,
K. Carlson,
S. Chandrasekaran,
B. Chase,
E. Cullerton,
J. Edelen,
J. Einstein-Curtis,
C. Ginsburg,
A. Grassellino,
B. Hansen,
J. Holzbauer,
S. Kazakov,
T. Khabiboulline,
M. Kucera,
J. Leibfritz,
A. Lunin,
D. McDowell,
M. McGee,
D. Nicklaus,
D. Orris,
J. Ozelis,
J. Patrick,
T. Petersen
, et al. (12 additional authors not shown)
Abstract:
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overv…
▽ More
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
△ Less
Submitted 7 May, 2018;
originally announced May 2018.
-
Status of the warm front end of PIP-II injector test
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
C. Baffes,
J. -P. Carneiro,
A. Chen,
P. F. Derwent,
J. P. Edelen,
D. Frolov,
B. Hanna,
L. Prost,
A. Saini,
G. Saewert,
V. Scarpine,
V. L. S. Sista,
J. Steimel,
D. Sun,
A. Warner
Abstract:
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T…
▽ More
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.
△ Less
Submitted 23 March, 2018;
originally announced March 2018.
-
Installation Progress At The PIP-II Injector Test At Fermilab
Authors:
C. Baffes,
M. Alvarez,
R. Andrews,
A. Chen,
J. Czajkowski,
P. Derwent,
J. Edelen,
B. Hanna,
B. Hartsell,
K. Kendziora,
D. Mitchell,
L. Prost,
V. Scarpine,
A. Shemyakin,
J. Steimel,
T. Zuchnik,
A. Edelen
Abstract:
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr…
▽ More
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
△ Less
Submitted 4 January, 2017;
originally announced January 2017.
-
The Use of KF Style Flanges In Low Particulate Applications
Authors:
K. R. Kendziora,
J. Angelo,
C. Baffes,
D. Franck,
R. Kellett
Abstract:
As SCRF particle accelerator technology advances the need for "low particulate" and "particle free" vacuum systems becomes greater and greater. In the course of the operation of these systems, there comes a time when various instruments have to be temporarily attached for diagnostic purposes: RGAs, leak detectors, and additional pumps. In an effort to make the additions of these instruments easier…
▽ More
As SCRF particle accelerator technology advances the need for "low particulate" and "particle free" vacuum systems becomes greater and greater. In the course of the operation of these systems, there comes a time when various instruments have to be temporarily attached for diagnostic purposes: RGAs, leak detectors, and additional pumps. In an effort to make the additions of these instruments easier and more time effective, we propose to use KF style flanges for these types of temporary diagnostic connections. This document will describe the tests used to compare the particles generated using the assembly of the, widely accepted for "particle free" use, conflat flange to the proposed KF style flange, and demonstrate that KF flanges produce comparable or even less particles.
△ Less
Submitted 3 January, 2017;
originally announced January 2017.
-
High power density test of PXIE MEBT absorber prototype
Authors:
A. Shemyakin,
C. Baffes
Abstract:
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a…
▽ More
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a spot with a ~2 mm rms radius. Two prototypes of the absorber were manufactured from molybdenum alloy TZM and tested with a 28 keV DC electron beam up to the peak surface power density required for PXIE, 17W/mm2. Temperatures and flow parameters were measured and compared to analysis. This paper describes the absorber prototypes and key testing results.
△ Less
Submitted 5 February, 2015;
originally announced February 2015.
-
Status of the warm front end of PXIE
Authors:
A. Shemyakin,
M. Alvarez,
R. Andrews,
C. Baffes,
A. Chen,
B. Hanna,
L. Prost,
G. Saewert,
V. Scarpine,
J. Steimel,
D. Sun,
D. Li,
R. D'Arcy
Abstract:
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creati…
▽ More
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chop** system.
△ Less
Submitted 5 February, 2015;
originally announced February 2015.
-
Testing Results of the Prototype Beam Absorber for the PXIE MEBT
Authors:
Curtis Baffes,
Alexander Shemyakin
Abstract:
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H^{-} bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused ont…
▽ More
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H^{-} bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a spot with a ~2 mm rms radius. A prototype of the absorber was manufactured from molybdenum alloy TZM, and tested with an electron beam up to the peak surface power density required for PXIE, 17W/mm2. Temperatures and flow parameters were measured and compared to analysis. This paper describes the absorber prototype and key testing results.
△ Less
Submitted 29 January, 2015;
originally announced January 2015.
-
Design of MEBT for the Project X Injector Experiment at Fermilab
Authors:
A. Shemyakin,
C. Baffes,
A. Chen,
Y. Eidelman,
B. Hanna,
V. Lebedev,
S. Nagaitsev,
J. -F. Ostiguy,
R. Pasquinelli,
D. Peterson,
L. Prost,
G. Saewert,
V. Scarpine,
B. Shteynas,
N. Solyak,
D. Sun,
M. Wendt,
V. Yakovlev,
T. Tang
Abstract:
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert…
▽ More
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by diverting undesired bunches to an absorber. This paper presents the MEBT scheme and describes development of its elements, including the kickers and absorber.
△ Less
Submitted 31 January, 2013;
originally announced January 2013.
-
Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab
Authors:
J. Leibfritz,
R. Andrews,
C. M. Baffes,
K. Carlson,
B. Chase,
M. D. Church,
E. R. Harms,
A. L. Klebaner,
M. Kucera,
A. Martinez,
S. Nagaitsev,
L. E. Nobrega,
P. Piot,
J. Reid,
M. Wendt,
S. J. Wesseln
Abstract:
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a hig…
▽ More
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.
△ Less
Submitted 29 January, 2013;
originally announced January 2013.
-
Mechanical Design of a High Energy Beam Absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab
Authors:
C. Baffes,
M. Church,
J. Leibfritz,
S. Oplt,
I. Rakhno
Abstract:
A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be accelerated through 3 TTF-type or ILC-type RF cryomodules to an energy of 750MeV. The electron beam will be directed to one of multiple downstream experimental and diagnostic beam lines and then deposited in one of two be…
▽ More
A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be accelerated through 3 TTF-type or ILC-type RF cryomodules to an energy of 750MeV. The electron beam will be directed to one of multiple downstream experimental and diagnostic beam lines and then deposited in one of two beam absorbers. The facility is designed to accommodate up to 6 cryomodules, which would produce a 75kW beam at 1.5GeV; this is the driving design condition for the beam absorbers. The beam absorbers consist of water-cooled graphite, aluminum and copper layers contained in a Helium-filled enclosure. This paper describes the mechanical implementation of the beam absorbers, with a focus on thermal design and analysis. In addition, the potential for radiation-induced degradation of the graphite is discussed.
△ Less
Submitted 23 January, 2013;
originally announced January 2013.