Skip to main content

Showing 1–14 of 14 results for author: Baffes, C

.
  1. arXiv:1912.02897  [pdf

    physics.acc-ph

    Test Results of PIP2IT MEBT Vacuum Protection System

    Authors: A. Chen, R. Andrews, C. Baffes, D. Lambert, L. Prost, A. Shemyakin, T. Zuchnik

    Abstract: The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a v… ▽ More

    Submitted 5 December, 2019; originally announced December 2019.

    Comments: 3 pages, NAPAC2019

    Report number: FERMILAB-PUB-19-443-AD

  2. arXiv:1811.04027  [pdf

    physics.acc-ph

    Commissioning and Operation of FAST Electron Linac at Fermilab

    Authors: A. Romanov, C. Baffes, D. R. Broemmelsiek, K. Carlson, D. J. Crawford, N. Eddy, D. Edstrom Jr., E. R. Harms, J. Hurd, M. Kucera, J. Leibfritz, I. Rakhno, J. Reid, J. Ruan, J. Santucci, V. Shiltsev, G. Stancari, R. Thurman-Keup, A. Valishev, A. Warner

    Abstract: We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF… ▽ More

    Submitted 9 November, 2018; originally announced November 2018.

    Comments: 4 pp

    Report number: Fermilab-Conf-18-320-AD

  3. arXiv:1806.05725  [pdf

    physics.acc-ph

    Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac

    Authors: L. Lari, F. Cerutti, L. S. Esposito, C. Baffes, S. J. Dixon, N. V. Mokhov, I. Rakhno, I. S. Tropin

    Abstract: PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this… ▽ More

    Submitted 14 June, 2018; originally announced June 2018.

    Comments: 4 pp. Proceedings of IPAC2018, Vancouver, BC, Canada

    Report number: Fermilab-Conf-18-119-AD

  4. arXiv:1806.05708  [pdf

    physics.acc-ph

    PIP-II Injector Test Warm Front End: Commissioning Update

    Authors: L. Prost, R. Andrews, C. Baffes, J. -P. Carneiro, B. Chase, A. Chen, E. Cullerton, P. F. Derwent, J. P. Edelen, J. Einstein-Curtis, D. Frolov, B. Hanna, D. Peterson, G. Saewert, A. Saini, V. Scarpine, A. Shemyakin, J. Steimel, D. Sun, A. Warner, C. Richard, V. L. S. Sista

    Abstract: The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status,… ▽ More

    Submitted 14 June, 2018; originally announced June 2018.

    Comments: 4 pp

    Report number: Fermilab-Conf-18-017-AD

  5. arXiv:1805.02725  [pdf

    physics.acc-ph

    Commissioning And First Results From The Fermilab Cryomodule Test Stand

    Authors: E. R. Harms, M. Awida, C. Baffes, K. Carlson, S. Chandrasekaran, B. Chase, E. Cullerton, J. Edelen, J. Einstein-Curtis, C. Ginsburg, A. Grassellino, B. Hansen, J. Holzbauer, S. Kazakov, T. Khabiboulline, M. Kucera, J. Leibfritz, A. Lunin, D. McDowell, M. McGee, D. Nicklaus, D. Orris, J. Ozelis, J. Patrick, T. Petersen , et al. (12 additional authors not shown)

    Abstract: A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overv… ▽ More

    Submitted 7 May, 2018; originally announced May 2018.

    Comments: 4 pp. Proceedings of LINAC2016, East Lansing, MI, USA

    Report number: Fermilab-Conf-16-744-AD-APC-TD

  6. arXiv:1803.08940  [pdf

    physics.acc-ph

    Status of the warm front end of PIP-II injector test

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, J. -P. Carneiro, A. Chen, P. F. Derwent, J. P. Edelen, D. Frolov, B. Hanna, L. Prost, A. Saini, G. Saewert, V. Scarpine, V. L. S. Sista, J. Steimel, D. Sun, A. Warner

    Abstract: The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam T… ▽ More

    Submitted 23 March, 2018; originally announced March 2018.

    Comments: 4 pp. 8th International Particle Accelerator Conference (IPAC 2017) 14-19 May 2017. Copenhagen, Denmark

    Report number: Fermilab-Conf-17-146-AD

  7. arXiv:1701.01078  [pdf

    physics.acc-ph

    Installation Progress At The PIP-II Injector Test At Fermilab

    Authors: C. Baffes, M. Alvarez, R. Andrews, A. Chen, J. Czajkowski, P. Derwent, J. Edelen, B. Hanna, B. Hartsell, K. Kendziora, D. Mitchell, L. Prost, V. Scarpine, A. Shemyakin, J. Steimel, T. Zuchnik, A. Edelen

    Abstract: A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadr… ▽ More

    Submitted 4 January, 2017; originally announced January 2017.

    Comments: 4 pp

    Report number: Fermilab-Conf-16-434-AD

  8. arXiv:1701.00842  [pdf

    physics.acc-ph

    The Use of KF Style Flanges In Low Particulate Applications

    Authors: K. R. Kendziora, J. Angelo, C. Baffes, D. Franck, R. Kellett

    Abstract: As SCRF particle accelerator technology advances the need for "low particulate" and "particle free" vacuum systems becomes greater and greater. In the course of the operation of these systems, there comes a time when various instruments have to be temporarily attached for diagnostic purposes: RGAs, leak detectors, and additional pumps. In an effort to make the additions of these instruments easier… ▽ More

    Submitted 3 January, 2017; originally announced January 2017.

    Comments: 3 pp

    Report number: Fermilab-Conf-16-394-AD

  9. arXiv:1502.01709  [pdf

    physics.acc-ph

    High power density test of PXIE MEBT absorber prototype

    Authors: A. Shemyakin, C. Baffes

    Abstract: One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a… ▽ More

    Submitted 5 February, 2015; originally announced February 2015.

    Comments: 3 pp. arXiv admin note: text overlap with arXiv:1501.07568

    Report number: FERMILAB-CONF-14-302-AD

  10. arXiv:1502.01703  [pdf

    physics.acc-ph

    Status of the warm front end of PXIE

    Authors: A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, A. Chen, B. Hanna, L. Prost, G. Saewert, V. Scarpine, J. Steimel, D. Sun, D. Li, R. D'Arcy

    Abstract: A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creati… ▽ More

    Submitted 5 February, 2015; originally announced February 2015.

    Comments: 3 pp

    Report number: FERMILAB-CONF-14-301-AD

  11. arXiv:1501.07568  [pdf

    physics.acc-ph

    Testing Results of the Prototype Beam Absorber for the PXIE MEBT

    Authors: Curtis Baffes, Alexander Shemyakin

    Abstract: One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H^{-} bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused ont… ▽ More

    Submitted 29 January, 2015; originally announced January 2015.

    Comments: 3 pp. 5th International Particle Accelerator Conference (IPAC 2014) 16-20 Jun 2014. Dresden, Germany

    Report number: fermilab-conf-14-168-AD

  12. arXiv:1301.7698  [pdf

    physics.acc-ph

    Design of MEBT for the Project X Injector Experiment at Fermilab

    Authors: A. Shemyakin, C. Baffes, A. Chen, Y. Eidelman, B. Hanna, V. Lebedev, S. Nagaitsev, J. -F. Ostiguy, R. Pasquinelli, D. Peterson, L. Prost, G. Saewert, V. Scarpine, B. Shteynas, N. Solyak, D. Sun, M. Wendt, V. Yakovlev, T. Tang

    Abstract: The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary selected bunch pattern from the initially 5 mA 162.5 MHz CW train. The bunch selection will be made in the Medium Energy Beam Transport (MEBT) at 2.1 MeV by divert… ▽ More

    Submitted 31 January, 2013; originally announced January 2013.

    Comments: 3 pp

    Report number: FERMILAB-CONF-12-496-AD-APC-TD

  13. arXiv:1301.6995  [pdf

    physics.acc-ph

    Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

    Authors: J. Leibfritz, R. Andrews, C. M. Baffes, K. Carlson, B. Chase, M. D. Church, E. R. Harms, A. L. Klebaner, M. Kucera, A. Martinez, S. Nagaitsev, L. E. Nobrega, P. Piot, J. Reid, M. Wendt, S. J. Wesseln

    Abstract: The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a hig… ▽ More

    Submitted 29 January, 2013; originally announced January 2013.

    Comments: 4 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012, New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-177-AD

  14. arXiv:1301.5619  [pdf

    physics.acc-ph

    Mechanical Design of a High Energy Beam Absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab

    Authors: C. Baffes, M. Church, J. Leibfritz, S. Oplt, I. Rakhno

    Abstract: A high energy beam absorber has been built for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab. In the facility's initial configuration, an electron beam will be accelerated through 3 TTF-type or ILC-type RF cryomodules to an energy of 750MeV. The electron beam will be directed to one of multiple downstream experimental and diagnostic beam lines and then deposited in one of two be… ▽ More

    Submitted 23 January, 2013; originally announced January 2013.

    Comments: 3 pp. 3rd International Particle Accelerator Conference (IPAC 2012) 20-25 May 2012. New Orleans, Louisiana

    Report number: FERMILAB-CONF-12-139-AD