Skip to main content

Showing 1–6 of 6 results for author: Altendorfer, K

.
  1. arXiv:2405.02445  [pdf

    econ.GN

    Energy Price and Workload Related Dispatching Rule: Balancing Energy and Production Logistics Costs

    Authors: Balwin Bokor, Wolfgang Seiringer, Klaus Altendorfer, Thomas Felberbauer

    Abstract: In response to the escalating need for sustainable manufacturing practices amid fluctuating energy prices, this study introduces a novel dispatching rule that integrates energy price and workload considerations with Material Requirement Planning (MRP) to optimize production logistics and energy costs. The dispatching rule effectively adjusts machine operational states, i.e. turn the machine on or… ▽ More

    Submitted 3 May, 2024; originally announced May 2024.

  2. arXiv:2405.02015  [pdf

    econ.GN

    Evaluating Production Planning and Control Systems in Different Environments: A Comparative Simulation Study

    Authors: Wolfgang Seiringer, Balwin Bokor, Klaus Altendorfer

    Abstract: Selecting the appropriate production planning and control systems (PPCS) presents a significant challenge for many companies, as their performance, i.e. overall costs, depends on the production system environment. Key environmental characteristics include the system's structure, i.e. flow shop, hybrid shop, or job shop, and the planned shop load. Besides selecting a suitable PPCS, its parameteriza… ▽ More

    Submitted 3 May, 2024; originally announced May 2024.

  3. arXiv:2403.11010  [pdf

    econ.GN

    How Periodic Forecast Updates Influence MRP Planning Parameters: A Simulation Study

    Authors: Klaus Altendorfer, Wolfgang Seiringer, Thomas Felberbauer, Balwin Bokor, Fabian Brockmann

    Abstract: In many supply chains, the current efforts at digitalization have led to improved information exchanges between manufacturers and their customers. Specifically, demand forecasts are often provided by the customers and regularly updated as the related customer information improves. In this paper, we investigate the influence of forecast updates on the production planning method of Material Requirem… ▽ More

    Submitted 16 March, 2024; originally announced March 2024.

  4. arXiv:2402.14832  [pdf

    eess.SY

    Integrating Simulation Budget Management into Drum-Buffer-Rope: A Study on Parametrization and Reducing Computational Effort

    Authors: Balwin Bokor, Wolfgang Seiringer, Klaus Altendorfer

    Abstract: In manufacturing, a bottleneck workstation frequently emerges, complicating production planning and escalating costs. To address this, Drum-Buffer-Rope (DBR) is a widely recognized production planning and control method that focuses on centralizing the bottleneck workstation, thereby improving production system performance. Although DBR is primarily focused on cre-ating a bottleneck schedule, the… ▽ More

    Submitted 14 May, 2024; v1 submitted 17 February, 2024; originally announced February 2024.

  5. arXiv:2402.14506  [pdf, other

    econ.EM

    Enhancing Rolling Horizon Production Planning Through Stochastic Optimization Evaluated by Means of Simulation

    Authors: Manuel Schlenkrich, Wolfgang Seiringer, Klaus Altendorfer, Sophie N. Parragh

    Abstract: Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts. Therefore, this article focuses on the integration of updated customer demand into the rolling horizon planning cycle. We use scenario-based stochastic programming to solve capacitated lot sizing problems under stochastic demand in a rolling horizon environment. This environment is r… ▽ More

    Submitted 22 February, 2024; originally announced February 2024.

  6. Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand

    Authors: Klaus Altendorfer, Thomas Felberbauer, Herbert Jodlbauer

    Abstract: The hierarchical structure of production planning has the advantage of assigning different decision variables to their respective time horizons and therefore ensures their manageability. However, the restrictive structure of this top-down approach implying that upper level decisions are the constraints for lower level decisions also has its shortcomings. One problem that occurs is that determinist… ▽ More

    Submitted 3 December, 2018; originally announced December 2018.

    Comments: production planning, MRP II, simulation, aggregate production planning, demand and forecast uncertainty

    MSC Class: 90B50

    Journal ref: International Journal of Production Research, 54:12, 3718-3735 (2016)