Energy Price and Workload Related Dispatching Rule: Balancing Energy and Production Logistics Costs
Authors:
Balwin Bokor,
Wolfgang Seiringer,
Klaus Altendorfer,
Thomas Felberbauer
Abstract:
In response to the escalating need for sustainable manufacturing practices amid fluctuating energy prices, this study introduces a novel dispatching rule that integrates energy price and workload considerations with Material Requirement Planning (MRP) to optimize production logistics and energy costs. The dispatching rule effectively adjusts machine operational states, i.e. turn the machine on or…
▽ More
In response to the escalating need for sustainable manufacturing practices amid fluctuating energy prices, this study introduces a novel dispatching rule that integrates energy price and workload considerations with Material Requirement Planning (MRP) to optimize production logistics and energy costs. The dispatching rule effectively adjusts machine operational states, i.e. turn the machine on or off, based on current energy prices and workload. By develo** a stochastic multi-item multi-stage job shop simulation model, this research evaluates the performance of the dispatching rule through a comprehensive full-factorial simulation. Findings indicate a significant enhancement in shop floor decision-making through reduced costs. Moreover, the analysis of the Pareto front reveals trade-offs between minimizing energy and production logistics costs, aiding decision-makers in selecting optimal configurations.
△ Less
Submitted 3 May, 2024;
originally announced May 2024.
-
Evaluating Production Planning and Control Systems in Different Environments: A Comparative Simulation Study
Authors:
Wolfgang Seiringer,
Balwin Bokor,
Klaus Altendorfer
Abstract:
Selecting the appropriate production planning and control systems (PPCS) presents a significant challenge for many companies, as their performance, i.e. overall costs, depends on the production system environment. Key environmental characteristics include the system's structure, i.e. flow shop, hybrid shop, or job shop, and the planned shop load. Besides selecting a suitable PPCS, its parameteriza…
▽ More
Selecting the appropriate production planning and control systems (PPCS) presents a significant challenge for many companies, as their performance, i.e. overall costs, depends on the production system environment. Key environmental characteristics include the system's structure, i.e. flow shop, hybrid shop, or job shop, and the planned shop load. Besides selecting a suitable PPCS, its parameterization significantly influences the performance. This publication investigates the performance and the optimal parametrization of Material Requirement Planning (MRP), Reorder Point System (RPS) and Constant Work In Progress (ConWIP) at different stochastic multi-item multi-stage production system environments by conduction a comprehensive full factorial simulation study. The results indicate that MRP and ConWIP generally outperform RPS in all observed environments. Moreover, when comparing MRP with ConWIP, the performance clearly varies depending on the specific production system environment.
△ Less
Submitted 3 May, 2024;
originally announced May 2024.
-
How Periodic Forecast Updates Influence MRP Planning Parameters: A Simulation Study
Authors:
Klaus Altendorfer,
Wolfgang Seiringer,
Thomas Felberbauer,
Balwin Bokor,
Fabian Brockmann
Abstract:
In many supply chains, the current efforts at digitalization have led to improved information exchanges between manufacturers and their customers. Specifically, demand forecasts are often provided by the customers and regularly updated as the related customer information improves. In this paper, we investigate the influence of forecast updates on the production planning method of Material Requirem…
▽ More
In many supply chains, the current efforts at digitalization have led to improved information exchanges between manufacturers and their customers. Specifically, demand forecasts are often provided by the customers and regularly updated as the related customer information improves. In this paper, we investigate the influence of forecast updates on the production planning method of Material Requirements Planning (MRP). A simulation study was carried out to assess how updates in information affect the setting of planning parameters in a rolling horizon MRP planned production system. An intuitive result is that information updates lead to disturbances in the production orders for the MRP standard, and, therefore, an extension for MRP to mitigate these effects is developed. A large numerical simulation experiment shows that the MRP safety stock exploitation heuristic, that has been developed, leads to significantly improved results as far as inventory and backorder costs are concerned. An interesting result is that the fixed-order-quantity lotsizing policy performs - in most instances - better than the fixed-order-period lotsizing policy, when periodic forecast updates occur. In addition, the simulation study shows that underestimating demand is marginally more costly than overestimating it, based on the comparative analysis of all instances. Furthermore, the results indicate that the MRP safety stock exploitation heuristic can mitigate the negative effects of biased forecasts.
△ Less
Submitted 16 March, 2024;
originally announced March 2024.
-
Integrating Simulation Budget Management into Drum-Buffer-Rope: A Study on Parametrization and Reducing Computational Effort
Authors:
Balwin Bokor,
Wolfgang Seiringer,
Klaus Altendorfer
Abstract:
In manufacturing, a bottleneck workstation frequently emerges, complicating production planning and escalating costs. To address this, Drum-Buffer-Rope (DBR) is a widely recognized production planning and control method that focuses on centralizing the bottleneck workstation, thereby improving production system performance. Although DBR is primarily focused on cre-ating a bottleneck schedule, the…
▽ More
In manufacturing, a bottleneck workstation frequently emerges, complicating production planning and escalating costs. To address this, Drum-Buffer-Rope (DBR) is a widely recognized production planning and control method that focuses on centralizing the bottleneck workstation, thereby improving production system performance. Although DBR is primarily focused on cre-ating a bottleneck schedule, the selection of planning parameters is crucial, as they significantly influence the scheduling process. Conducting a compre-hensive full factorial enumeration to identify the ideal planning parameters requires substantial computational effort. Simulation Budget Management (SBM) offers an effective concept to reduce this effort by skip** less promising parameter combinations. This publication introduces a method for integrating SBM into multi-stage multi-item DBR planned and controlled production system with limited capacity, aimed at determining the optimal planning parameters. Furthermore, we conduct a simulation study to analyze the effects of different production system environments, i.e., varying levels of shop load and process uncertainty, on both the performance and parame-terization of DBR and the efficacy of SBM. Our results show significant re-duction in simulation budget for identifying optimal planning parameters compared to traditional full factorial enumeration.
△ Less
Submitted 14 May, 2024; v1 submitted 17 February, 2024;
originally announced February 2024.
-
Enhancing Rolling Horizon Production Planning Through Stochastic Optimization Evaluated by Means of Simulation
Authors:
Manuel Schlenkrich,
Wolfgang Seiringer,
Klaus Altendorfer,
Sophie N. Parragh
Abstract:
Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts. Therefore, this article focuses on the integration of updated customer demand into the rolling horizon planning cycle. We use scenario-based stochastic programming to solve capacitated lot sizing problems under stochastic demand in a rolling horizon environment. This environment is r…
▽ More
Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts. Therefore, this article focuses on the integration of updated customer demand into the rolling horizon planning cycle. We use scenario-based stochastic programming to solve capacitated lot sizing problems under stochastic demand in a rolling horizon environment. This environment is replicated using a discrete event simulation-optimization framework, where the optimization problem is periodically solved, leveraging the latest demand information to continually adjust the production plan. We evaluate the stochastic optimization approach and compare its performance to solving a deterministic lot sizing model, using expected demand figures as input, as well as to standard Material Requirements Planning (MRP). In the simulation study, we analyze three different customer behaviors related to forecasting, along with four levels of shop load, within a multi-item and multi-stage production system. We test a range of significant parameter values for the three planning methods and compute the overall costs to benchmark them. The results show that the production plans obtained by MRP are outperformed by deterministic and stochastic optimization. Particularly, when facing tight resource restrictions and rising uncertainty in customer demand, the use of stochastic optimization becomes preferable compared to deterministic optimization.
△ Less
Submitted 22 February, 2024;
originally announced February 2024.
-
Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand
Authors:
Klaus Altendorfer,
Thomas Felberbauer,
Herbert Jodlbauer
Abstract:
The hierarchical structure of production planning has the advantage of assigning different decision variables to their respective time horizons and therefore ensures their manageability. However, the restrictive structure of this top-down approach implying that upper level decisions are the constraints for lower level decisions also has its shortcomings. One problem that occurs is that determinist…
▽ More
The hierarchical structure of production planning has the advantage of assigning different decision variables to their respective time horizons and therefore ensures their manageability. However, the restrictive structure of this top-down approach implying that upper level decisions are the constraints for lower level decisions also has its shortcomings. One problem that occurs is that deterministic mixed integer decision problems are often used for long-term planning, but the real production system faces a set of stochastic influences. Therefore, a planned utilisation factor has to be included into this deterministic aggregate planning problem. In practice, this decision is often based on past data and not consciously taken. In this paper, the effect of long-term forecast error on the optimal planned utilisation factor is evaluated for a production system facing stochastic demand and the benefit of exploiting this decision's potential is discussed. Overall costs including capacity, backorder and inventory costs, are determined with simulation for different multi-stage and multi-item production system structures. The results show that the planned utilisation factor used in the aggregate planning problem has a high influence on optimal costs. Additionally, the negative effect of forecast errors is evaluated and discussed in detail for different production system environments.
△ Less
Submitted 3 December, 2018;
originally announced December 2018.