-
Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac
Authors:
Kazuro Furukawa,
Mitsuo Akemoto,
Dai Arakawa,
Yoshio Arakida,
Yusei Bando,
Hiroyasu Ego,
Yoshinori Enomoto,
Toshiyasu Higo,
Hiroyuki Honma,
Naoko Iida,
Kazuhisa Kakihara,
Takuya Kamitani,
Hiroaki Katagiri,
Masato Kawamura,
Shuji Matsumoto,
Toshihiro Matsumoto,
Hideki Matsushita,
Katsuhiko Mikawa,
Takako Miura,
Fusashi Miyahara,
Hiromitsu Nakajima,
Takuya Natsui,
Yujiro Ogawa,
Satoshi Ohsawa,
Yuichi Okayasu
, et al. (17 additional authors not shown)
Abstract:
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construc…
▽ More
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
△ Less
Submitted 4 July, 2022;
originally announced July 2022.
-
The Physics of the B Factories
Authors:
A. J. Bevan,
B. Golob,
Th. Mannel,
S. Prell,
B. D. Yabsley,
K. Abe,
H. Aihara,
F. Anulli,
N. Arnaud,
T. Aushev,
M. Beneke,
J. Beringer,
F. Bianchi,
I. I. Bigi,
M. Bona,
N. Brambilla,
J. B rodzicka,
P. Chang,
M. J. Charles,
C. H. Cheng,
H. -Y. Cheng,
R. Chistov,
P. Colangelo,
J. P. Coleman,
A. Drutskoy
, et al. (2009 additional authors not shown)
Abstract:
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary…
▽ More
This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.
Please note that version 3 on the archive is the auxiliary version of the Physics of the B Factories book. This uses the notation alpha, beta, gamma for the angles of the Unitarity Triangle. The nominal version uses the notation phi_1, phi_2 and phi_3. Please cite this work as Eur. Phys. J. C74 (2014) 3026.
△ Less
Submitted 31 October, 2015; v1 submitted 24 June, 2014;
originally announced June 2014.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.